9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby,

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Quick Review of Secondary Electron Yield Studies to Mitigate Electron Cloud Effect in Accelerator F. Le Pimpec (PSI) R. Kirby, F. King, M. Pivi (SLAC)
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
ILC Damping Ring update on collective effect electron cloud R&D Mauro Pivi SLAC ILCDR06 Cornell Workshop September 26-28, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
30 May – 2 June, 2007 ILC 2007 DESY, Germany ILC R&D plan WP 2.2.3: Electron cloud M. Pivi -SLAC ILC 2007 Hamburg, Germany.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Electron Cloud Studies Theo Demma INFN-LNF Frascati.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
5 November, 2007 DR - Kick Off Meeting 1 Electron Cloud Work Package M. Pivi Damping Rings EDR Kick-Off Meeting Daresbury, United Kingdom 5-7 November.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
PEP-II test chambers installation
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D for Future Linear Colliders
RECENT DEVELOPMENTS IN MODELING
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
CesrTA Experimental Schedule and Priorities
ILC Damping Ring electron cloud WG effort
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby, F. King, T. Markiewicz, B. McKee, M. Munro, N. Phinney, T. Raubenheimer, J. Seeman (SLAC), F. Le Pimpec (PSI) ECLOUD 07 Daegu S. Korea

Courtesy P. Garbincius

Effort started in 2003 with extensive simulations of electron cloud build-up in DR including quadrupole and wigglers regions, and simulations to characterize the single-bunch instability threshold International collaboration R&D effort: simulation campaign culminating in the recommendation for the damping ring circumference reduced from 17 km to 12km [electron cloud safe], then further reduced to 6km [red flag for electron cloud]. Although an electron cloud is expected in the 6km positron Damping Ring, simulations give increased confidence on possible remedies as clearing electrodes and grooves. Substantial R&D effort is needed to confirm possible mitigation techniques. ILC DR Electron cloud simulation history

Compare options: simulations history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density. Solenoids decrease the cloud density in DRIFT regions, where they are only effective. Compare options LowQ and LowQ+train gaps. All cases wiggler aperture 46mm.

Global ILC R&D program In progress: - At KEKB: in situ Secondary Electron Yield (SEY) measurements, ante- chamber, Cu, TiN and NEG chambers. PLANNED: Clearing electrodes in wiggler. - At SLAC: SEY of samples in accelerator beam line, rect. groove chambers, TiN chambers. PLANNED: Clearing electrodes and grooves in bends. Planned: - SPS and PS: LHC pre/injectors. Scrubbing runs and several mitigation techniques are under evaluation. - Daphne: positron ring limited in current. TiN in aluminum wiggler sections. Proposed: - CesrTA: suppression techniques in wigglers (ILC damping ring wigglers). Electron cloud build-up and instability with ultra-low emittancies close to the ILC DR. - KEKB:Low emittance operation for electron cloud tests

R&D Goals: –Estimate e-cloud build-up and single-bunch instability thresholds –Reduce surface secondary electron yield (SEY) below electron cloud threshold for ILC DR: SEY ≤ 1.2 Surface approaches –Thin film coatings –Electron and photon surface conditioning –Clearing electrodes –Grooved surfaces Projects: –ONGOING: conditioning TiN and NEG coatings in PEP-II straights –ONGOING: rectangular groove chambers in PEP-II straights –PLANNED: clearing electrode chamber in magnets –PLANNED: triangular groove chamber in magnets E-cloud and SEY R&D Program SLAC

SEYGROOVE 1GROOVE 2FLAT 1FLAT 2 COLLECTORS ENERGY ANALYZER THERMOCOUPLES GROOVE CHAMBERS EXPERIMENTSEY TEST STATION PEP-II test chambers installation SEY station can be used to expose samples to PEP-ii beam environment and then measure samples in lab (transport in load-lock) Grooved and Flat chambers installed to measure performance in PEP-ii beam environment

TiN/Al sample exposed to SR PEP-II LER side RF seal location SEY TESTS TiN and NEG Expose samples to PEP-II LER synchrotron radiation and electron conditioning. Then, measure Secondary Electron Yield (SEY) in laboratory. Samples transferred under vacuum. Complementary at SPS and KEK studies 20mm

Project 2: chamber with coating samples. e+e+ sample supports and transferring systems 45 o position 0 o position PEP-II

SEY test station in PEP-II LER 45 o position 0 o position

SEY test station in PEP-II LER 45 o position 0 o position

SEY chamber instrumentation: e- energy analyzer R. Kirby and M. P. SLAC, based on K.Harkay and R.Rosenberg design

p.14 Design- Fin Extrusions FIN TIPS= I.D. OF CHAM FAN HITS HERE FIRST LIGHT PASSES THRU SLOTS BETW FINS BECAUSE FAN IS “THICKER” THAN FIN FAN EVENTUALLY HITS “BOTTOM” OF SLOT FOR FULL SR STRIKE VIEW IS ROTATED 90 CCW FROM ACTUAL FAN ORIENTATION

p.15 Design- Fin Chamber m Chambers are constructed of Al extrusions machined to length with end preps for masks & flanges. m Al extrusions were chosen for their economy and ease of manufacture  Bonus - cooling is integral to the cross section, not welded to the outside m Flanges are bi-metal Atlas flanges that are welded directly to chamber  Insufficient space between the chamber and the flange knife edge for a bi-metal transition m Bottom sides of chambers are perforated at the ports m Inside surfaces are TiN coated  Reduce thermal outgassing & PSD  Reduce secondary electron yield m Fin chamber weight ~ 32 lbs

p.16 Design- Port Detail m 4” port shown here, 500 holes, 25 x 20, holes 1.6 mm m 1.5” port hole pattern is 50 holes, 10x5, holes 1.6 mm

Instrumentation: collector plate inside port

Chamber samples: SEY after TiN coating before installation in PEP-II

Installation in PEP-II LER Fin chamber Flat chamber

p.20 Design – Existing Ring Layout LER DIRECTION ELEVATION VIEW PLAN VIEW BEND B1 AISLE SIDE TIN/Al GROOVE/FLAT CHAMBERS HERE SEY CHAMBER HERE

SEY test chamber samples: SEY before installation in PEP-II LER #1 and #2 samples are then inserted in the PEP-II stainless steel chamber respectively in the plane of the synchrotron radiation fan (0 o position) and out of this plane (45 o position)

Secondary Yields after two months in PEP-II LER

LER#1 XPS Before installationAfter exposure in PEP-II LER for 2 months (e dose 100mC/mm^2) Different from electron conditioning in laboratory setup where carbon crystals grows! Carbon is strongly reduced if exposed to beam. Same for LER #1 and #2 samples. Surface analysis: Carbon content decrease

+214 hours at 1.1e-9 torr, 10:1 H2:CO After 2 months conditioning in PEP-II SEY after exposure to vacuum (214 = 52 hours in PEP-II no beam +162 in laboratory setup)

Measured electron energy distribution

Compare vacuum chamber e- currents Measured e- current in TiN/Al fin/flat chambers << StSt chamber. PEP-II LER current still raising (2.7A  4A). groove1 groove2 flat2 flat1 18 March 2007

Solenoid ON at fin/flat chambers location Switched external solenoid winding ON (10A  Bz=20 Gauss). Ibeam = 2.2A. Note: at ~20 Gauss, photoelectrons should dominate with respect to secondary electrons..

Compare vacuum chamber e- currents Missing dates Measured e- current in grooved and TiN flat chambers << StSt chamber. PEP-II LER current still raising (2.7A  4A) 18 March 2007

Photon electron dominant ?

Preliminary benchmark with CLOUDLAND Flat 1 Flat 2 In simulation, the SEY and the number of photon electrons are varied For the Flat chamber, the SEY is around 1.1~1.2 L.Wang SLAC

Flat chamber This plot only show the SEY effect, R=0.001 for all of them (R=e/p/m) Simulation: - Uniform photoe- distribution - Electron current at the wall

Grooved chamber For the grooved chamber, the SEY is ~1 Simulation: - Uniform photoe- distribution - Electron current at the wall

SEY estimation Raw data Ratio of Secondary to photoelectrons Total electrons Grooved Chamber has more photon electrons for some reason, but Flat Chamber has more secondary electrons, hence a higher SEY. This agree with simulation.

New Model Y. Suetsugu, APAC07 PEPII Exp. KEKB Exp. Simulation closer to the experimental setup: - Photo e- on the chamber side -Collector on bottom chamber Need more detail study

Simulation Flat Chamber SEY=1.1~1.2 CLOUD_LAND L.Wang SLAC

Simulation: - Uniform photoe- distribution - Electron current at the wall Simulation Grooved chamber Sey~1

New simulation data Simulation closer to the experimental setup: - Photo e- on the chamber side - Collector on bottom chamber Y. Suetsugu KEK

Work in progress Electron signal in flat & fin chambers is much lower than stainless steel chamber. Electron signal in flat chambers is lower than fin chambers: –Photoelectron dominant in fins? –Fin chambers efficient photon absorbers? Simulation campaign starting: –Fitting stainless steel data to parameterize SEY –Fitting to flat & fin chamber data: Low SEY in flat chambers and grooved chambers between 0.9~1.2 Appear to have higher photo e- rate in fin chambers –Need ray tracing of photons to understand fin chamber More input would be welcome

Plan for future work Simulations: Systematic simulation effort starting Further code benchmarking will be done Experimental Conditioning and recontamination studies Insertion in beam line of non-evaporable getter NEG samples Insertion of samples with different materials: Cu, Stst, Al Study asymptotic conditioning effect: coating the stainless steel chamber with TiN (and NEG). Testing of chambers with NEG and clearing electrodes

Outstanding e-cloud questions Simulations Are the build-up codes sufficiently developed and benchmarked? Are the instability code sufficiently developed and benchmarked? What is the SEY threshold in the ILC DR configuration 3ns bunch spacing? –More code benchmarking needed In the presence of an electron cloud: is the dynamic aperture preserved at injection? –Large beam sizes  no instability, but incoherent tune shift,.. Incoherent emittance growth below threshold, is it a real effect? Remedies Is TiN thin film resistant after long term exposure? How to minimize vacuum recontamination (SEY) effects? What coating: TiN or NEGs (TiZrV) Do we need ultra-small emittance facilities to run electron cloud tests? CesrTA/KEKB Dependence of the SEY with NEG activation cycles? (highly requested by CERN!) Do we need to test clearing electrodes to suppress the electron cloud? Is TiN coating sufficient in wigglers? Measured trapping and accumulation of electrons in quadrupoles (sextupoles)? Is this an issue per se?

41 Milestones to the ILC Engineering Design Report (EDR) 1. Characterize electron-cloud build-up. (Very High Priority) 2. Develop electron-cloud suppression techniques. (Very High Priority) Priority: characterize coating techniques and testing of conditioning and recontamination in situ. Clearing electrodes concepts by installation of chambers in accelerators. Characterization of impedance, HOM and power load deposited to the electrodes. Groove, slots and other concepts. Characterization of impedance, and HOM. 3. Develop modeling tools for electron-cloud instabilities. (Very High Priority) 4. Determine electron-cloud instability thresholds. (Very High Priority) Characterization the electron cloud instability: various codes in use PETHS, HEAD-TAIL, WARP/POSINST, CMAD

SummarySummary Installed 5 chambers in PEP-II in January 2007 Directly measured secondary electron yield of ~0.9 of TiN samples after exposure to beam. [Steering the ILC R&D effort in the direction of fully characterizing coating mitigation techniques..] –Recontamination studies ongoing Electron signal in Fin & Flat chambers is much lower than stainless steel chamber Initial simulations: consistent with high SEY in Stainless steel chamber and low SEY in Fin & Flat TiN/Al chambers –Systematic simulation effort ongoing to parameterize fin & flat chambers results

Thanks To contributors and collaborators: L. Wang, T. Raubenheimer, D. Arnett, G. Collet, R. Kirby, N. Kurita, B. Mckee, M. Morrison, G. Stupakov, N. Phinney, J. Seeman (SLAC), M. Palmer, D. Rubin, D. Rice, L. Schachter, J. Codner, E. Tanke, J. Crittenden (Cornell), J. Gao (HIPEP), A. Markovic et al. (Rostock Univ.), M. Zisman, S. De Santis, C. Celata, M. Furman, J.L. Vay, S. De Santis (LBNL), K. Ohmi, Y. Suetsugu (KEK), F. Willeke, R. Wanzenberg (DESY), J.M. Laurent, A. Rossi, E. Benedetto, F. Zimmermann, G. Rumolo, J.M. Jimenez, J-P. Delahaye (CERN), A. Wolski (Cockroft Uniiv.), B. Macek (LANL), C. Vaccarezza, S. Guiducci, R. Cimino, P. Raimondi (Frascati), et many other colleagues…