PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.

Slides:



Advertisements
Similar presentations
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS INSTRUMENT HARDWARE DESIGN REVIEW CEA-Grenoble / DSM / DRFMC / SBT / HSO Cryocoolers/ PACS IHDR1 MPE - November, HSO SORPTION COOLERS Lionel.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Test Readiness Review 23 October 2003 CRAL - LYON.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Low Mass Rui de Oliveira (CERN) July
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
First Stage Cryogenic IF Amplifier
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 2 Overview Completely Integrated Module Integrated QM Modules with FEEs RM Modules without FEEs Optical / Mechanical Module Camera Housing Interface Module Design –Electrical Interface –Thermal Budget –Support Post Stability: Cryovibration Tests Detector Stack and Final Bias Design Achieved Performance –Cut-off Wavelengths PA / QA Activities: Manufacturing Flow Plan Procurement of Parts for / Assembling of Flight Modules Summary

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 3 Completely Integrated High Stress Module Leaf spring FO FEEHarness Pigtail Cooling strap

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 4 Integrated QM Modules with FEE 11 HS Modules and 12 LS Modules

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 5 RM Modules without FEE: 13 HS Modules and 14 LS Modules

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 6 Optical / Mechanical Module Camera Interface Radial arrangement of 25 high stress modules in groups of 5 modules. The centre of the radial arrangement is 240 mm in front of the fore optics in the plane of the pupil.

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 7 Electrical Interface Interface design The nano connector of the pigtail harness is glued to the harness substrate Thermal loads from the CRE flow via the Au wires between FEE and harness through the cooling strap to the 4 K level To minimalise thermal load to the module: – Kapton supports for FEE and harness substrate –All wires from the module to electrical interface parts are stainless steel; Problem under investigation: Ca. 5% of measured pixels “strange”! Contact resistance (?) between stainless steel wire and H20E

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 8 Thermal Budget 4 K P = 375 µW 4 P = 624 µW 11 µW 202 µW 162 µW 7 µW 134 µW 108 µW P = 249 µW 25 High Stress Modules 25 Low Stress Modules 2.5 K 1.7 K 4 K 16 Detector Wires (Steel) 4 Long FEE + 2 Long Harness Posts (Kapton) 2 Short Harness Posts (Kapton)

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 9 Support Post Stability: Cryovibration Test 200 um Slit between kapton tube and support part (no gluing) at the free bearing support posts: - Compensation of thermal expansion coefficient for different materials (module, FEE/harness substrate, kapton tube, etc.) during cool-down. - After cool-down: slit = um. Static tests at LN 2 temperatures: Design withstands forces corresponding up to accelerations of 110 g. Above support post design passed cryo cycling and vibration tests with qualification load levels. Free bearing support post Slit

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 10 Detector Stack in the Cavity and Final Bias Design Ball segment Detector contact Ge:Ga crystal Detector contact Gold wire 25 µm Insulator Final design Bias concept has been changed to avoid detector short circuiting –Contact diameter decreased at the ball segment side to prevent grounding of the signal line (2) –Contact diameter increased at the ground side (this contact is grounded directly to the module (1)  Slits reduced from µm to µm and therefore less cross talk 1 2 Detector Stack

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 11 Specification Cut-off Wavelength Specification high stress module: CW > mV 30 mV Specification low stress module:  CW < mV

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 12 PA / QA Activities: Manufacturing Flow (PACS-NT-PL-003) KIP Final check (with UV light) of the completed module before shipping Detector stack assembly and RSR measurement. KIP: Check of detector stack KIP Cleaning of the module and check with UV light Preparation of FEE / harness support posts Gluing of the pigtail and cooling strap to the harness substrate Implementation of connector saver and short circuit connector Integration of FEE / harness substrate, completion of electricalwiring, fixing of FO Incoming inspection of FEE / Harness / Pigtail Cleaning and incoming inspection of all mechanical module parts

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 13 Procurement of Parts for / Assembling of Flight Modules Status of parts procurement for Flight Modules - Procurement of small parts nearly finished - Delivery of FM FEEs starts end of November Delivery of the pigtail from Cannon beginning of December Procurement of FOs scheduled for December 2003 problem: Au coating not yet acceptable, solution mid November - Procurement of module bodies initiated (delay about 2 month) Stack assembly of Flight Modules could starts around mid November if the pixel selection rule is confirmed by MPE First sixpack not before end of January 2004 Funding of Flight modules assured only until the end of 2. sixpack (end of February 2004) Time critical: Procurement / Assembly of Modules

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 14 Summary Interfaces to MPE housing, KT board and IMEC FEE and harness substrate defined Module design finished (specifications fulfilled) but: Pending problem of Contact resistance (?) between stainless steel wire and H20E glue Manufacturing of Flight Modules Initiated but: Pixel selection rule to be confirmed