LIVE BIRD MARKET REHABILITATION AND CLEANING AND DISINFECTION STATION DESIGNS BY FAO-MARKET TEAM INDONESIA 2011.

Slides:



Advertisements
Similar presentations
Village Mokhavane Taluka Sahapur District Thane
Advertisements

SECTOR 8D Study of Booths in sector 8D market We took 1 strip of the market place and studied its booths. More emphasis was given on how the spaces inside.
Old Kelleys IGA 200 Irwin Ave. Produced By: Lt. Ryan Christen Ocean City-Wright Fire Control District This presentation is a simple guide to area agencies.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Earth Control Measures at Project Detail Site Location Marina Barrage.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP for Cleaning and Disinfection of Poultry Transporting Vehicles and.
Johanna Mikitka AE-390 October 13, 2004
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP of Washing and Disinfection Activities in Poultry Markets Market.
PROVIDENCE LODGE The homely house on Oak Hill. Welcome to Providence Lodge.
EDT Floor Plan Design-Bathrooms1 Weekend Cabin Retreat Project Designing the Floor Plan - Bathrooms Sacramento City College EDT 300.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
Drawing. Presentation scope This presentation is purely for you to practice : –Drawings of different object views –Calculating the material required.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme The Principles of Decontamination in Poultry Market Chain Market Chain.
Birds are hung live on the shackles; an electrically charged wire stuns the bird before it enters the kill room.
CONSTRUCTING A FIVE CABIN LATRINE
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
EXCLUSIVE HOME ON THE BLACK SEA MAMAIA CONSTANTA - ROMANIA.
AMARI AIR BASE AT/FP EVAL 9 JUNE (No photos taken due to tight security)
Why Pier 23 Florida Trend magazine recently listed Santa Rosa county as the second fastest growing county in Florida. Pier 23 is located within a real.
Design Features Structure Concrete slab floor (27’x25’x3”, 6.25 cu yards) Walls created with mud bricks (dry season) or concrete blocks (wet season) Aluminum.
Storm Water Pollution Prevention Training
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
This may be the best buy in Fairfield County! New Canaan CONNECTICUT.
Introduction to a pit installation
Handling of Fish After Unloading Icelandic International Development Agency (ICEIDA) Iceland United Nations University Fisheries Training Programme (UNU-FTP)
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Planning Living Areas.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Licón, Daniel Mangelli, Paola. Table of Content Materials that walls are made of Load-Bearing Wall Nonbearing Wall Some Wall uses Conclusion.
My House By Keely. I have two rooms on the East side of the house and six rooms on the South side of the house. My family room is on the North side of.
PROPOSER Check! Will you and any fellow occupants require landlord consent Preliminary Proposals Flowchart Proposed Location Inside a flat? Discuss with.
IN PLAY ON UNDER ABOVE BEHIND BETWEEN IN FRONT OF NEXT TO.
South Bellevue Operational Noise Mitigation Types of barriersTypes of barriers Heights and locations Heights and locations City of Bellevue Light Rail.
Poultry Improvement Project Killing and Dressing Poultry.
This presentation is purely for you to practice : – Drawings of different object views – Calculating the material required.
RENO IDEAS.
TEAM PITZONE ARANGEMENT. PITBOX Every team gets 3x5 meters two floor PITBOX (the depth of flat surface can vary depending on particular place). That includs:
Activity #4: Construction Design By: Paul Massengill.
Active Solar heating Used for space and or water heating
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Storage Industrial zone Dobanovci Beogradska BB.
04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
Industrial Safety Management Work Premises & Housekeeping.
TT/SIN Department | 8/29/2012 | © Robert Bosch Engineering and Business Solutions Limited All rights reserved, also regarding any disposal, exploitation,
M PARK AD Sofia.
Screen Printing Create a file in Illustrator either 8” x 10” or 11”x17”. The top layer can be a comprehensive of your final color scheme. On the second.
Environmental Assessment
* 07/16/96 Site Development Plan * ##.
2007 National Food Science CDE
Building Planning and Drawing
Building Structural Systems
Sneed Property th Ave E, Puyallup Exterior of House
Amazing Natural Light & Great Outdoor Living
Stainless Steel Water Well Casing.
Both D bathrooms and e kitchen What makes you special!
Steam Plant Rehabilitation Building and Smokestack
The sport hall.
PRODUCT ARGUMENTATION
Preparing Your Home to Attract Buyers
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
J bathroom/ hi bedroom/ I kitchen
RISER PROJECT F bathroom.
C bathroom/AB and B Kitchens
Neutron guide Shielding Concept
New Central Fire Station
Presentation transcript:

LIVE BIRD MARKET REHABILITATION AND CLEANING AND DISINFECTION STATION DESIGNS BY FAO-MARKET TEAM INDONESIA 2011

ANYAR MARKET,TANGGERANG CITY Location : Tanggerang City of Banten Province Design 1: The live bird and the carcass vendors are in the same zone of the market, which the poultry cages are placed at backside of the kiosk. Building concepts: The buyers look the live birds inside metal cages from the backside or behind of the kiosk (separated by clear glass wall) The sellers process the live birds at the slaughtering area. The buyers receive the carcass from the front of the kiosk Floors, tables and walls are made from ceramics, but special for tables are coated with stainless steel plate. The kiosks have live birds storage area (metal cages), slaughtering area and carcass display tables The live bird market has an open water drainage, deep well and rain water source with litres water tank capacity as well as waste water treatment installation.

ANYAR MARKET,TANGGERANG CITY Live birds, temporary storage Buyer Pathways Seller Pathways Slaughtering Area Seller Pathways Slaughtering Area Buyer Pathways Slaughtering Area Carcass display Table Fore Backside

ANYAR MARKET,TANGGERANG CITY Glass in Slaughtering Area Live Birds temporary storage area Washing Tub from Stainless steel Carcass display table cover by stainless steel Buyers Pathways Sellers Pathways Glass in Slaughtering Area Ceramics wall

BOJONG NANGKA MARKET, TANGGERANG DISTRICT Location: Tanggerang District of Banten Province. Design 2: The zone for carcasses display is inside of the market (clean area), whereas the zone for slaughtering the birds is outside of the market (dirty area). Building concept of the slaughtering area: The slaughtering area is consist of live bird storage area with metal cages, live birds killed and dressed area and cutting up area The walls are made from ceramics and clear glass to clean easier The roof is made form transparent material, therefore the sunlight can access into the room directly There is a concreted pathways for cleaning and disinfectant of poultry truck and crates nearby the building. The live bird market has an open water drainage, deep well and rain water source as well as waste water treatment installation.

BOJONG NANGKA MARKET, TANGGERANG DISTRICT Cutting up area Chickens killed and dressed Area Live Birds Temporary Area + metal cages unloading Area Access the carcasses to market building

BOJONG NANGKA MARKET, TANGGERANG DISTRICT Clear Glass Live Birds temporary area + metal cages Doors into Market

ANYAR MARKET,BOGOR CITY Location: Bogor City of West Java Province. Design 3: The live bird market is located in the basement of the main market and mixed with other commodities Design concepts: Make a clear separation between poultry market with other commodities with ceramic tiles and clear glass for the barrier The live bird cages placed in an open area whereas the slaughtering area are placed at the corner of the basement which separated by clear glass walls The buyers will look the live birds that was placed in the metal cages before its slaughtered at slaughtering area by the vendors Most of the sellers sell native chicken and few for broiler, therefore the buyers are prefer buy the live birds rather than carcasses. The live bird market has an open water drainage, deep well and rain water source as well as waste water treatment installation.

ANYAR MARKET,BOGOR CITY Live birds, Temporary storage Slaughtering area Live birds, Temporary storage Buyer Pathways Slaughtering area Seller Pathways Live birds, Temporary storage Seller PathwaysBuyer PathwaysSeller PathwaysBuyer PathwaysSeller Pathways (metal cages)

ANYAR MARKET,BOGOR CITY Slaughtering area Clear Glass Live birds, Temporary storage

PARUNG PANJANG MARKET, BOGOR DISTRICT Location: Bogor district of West Java Province Design 4: Clear zone between live birds and other commodities with a communal slaughtering area The live bird market is placed at outside from the main building of the market separated with other commodities. Design Concept: Poultry commodities are separated clearly with other commodities by concrete wall as a barrier The live bird market has a communal slaughtering area and live birds temporary storage which separated by ceramics tile and clear glass There is a different level of height between poultry cages area and the pathway which more height for poultry cages area than the pathway The roof is made form transparent material, therefore the sunlight can access into the room directly The live bird market has an open water drainage, deep well and rain water source as well as waste water treatment installation.

PARUNG PANJANG MARKET, BOGOR DISTRICT Live birds vendors Other commodities vendors Concrete walls

PARUNG PANJANG MARKET, BOGOR DISTRICT Live birds, Temporary storage Slaughtering Area Evisceration area Live birds, Temporary storage Carcasses out Buyer Pathways Seller Pathways Slaughtering Area Buyer Pathways

PARUNG PANJANG MARKET, BOGOR DISTRICT Live birds, Temporary storage Carcasses out Slaughtering Area Live birds, Temporary storage

KRANGGAN MARKET,BEKASI CITY Location: Bekasi City of West Java Province. Design 5: The live bird and the carcass vendors are in the same zone of the market, which the metal cages are placed in front of the kiosk Design concept: The buyers look the live birds in the metal cages from the front of the kiosk (separated by clear glass wall) The sellers process the live birds at the slaughtering area. The buyer receive the carcass in front of the kiosk Floors, tables and walls are made from ceramics, but special for tables are coated with stainless steel. There is a clear barrier between slaughtering area with evisceration area The live bird market has an open water drainage, deep well and rain water source as well as waste water treatment installation.

KRANGGAN MARKET,BEKASI CITY Cages Cleaning desk Ceramics wall Slaughtering Area Seller Pathways Buyer Pathways In front Backside

KRANGGAN MARKET,BEKASI CITY Cages Clear Glass Ceramics wall

Design 1 : C&D station with two lanes side by side (capacity for 4 trucks) Location: Cakung collector yard (East Jakarta) Design concept: This station is located close to the exit gate of collector yard and used for the vehicles that will going out from the location after unloading the chickens. This design is suitable for the collector yard that has many incoming trucks, so the process of truck’s cleaning can run faster than only has one line and does not cause long queues as well. C & D station consists of two lane side by side, where in each lane can load 2 trucks in parallel

C&D station with 2 lines

Design 2 : C&D station with 1 line (capacity for 2 trucks) Location: Pulo Gadung collector yard (East Jakarta) Rawa Kepiting collector yard (East Jakarta) Berkah Pitikku collector yard (Bekasi city) Design concept: This station is located close to the exit gate of collector yard and used for the vehicles that will going out from the location after unloading the chickens. This design is suitable for the collector yard/slaughterhouse that has many incoming trucks, but there is not enough land for C&D station location. C & D station consists of 1 lane that can load 2 trucks in parallel

C&D station with 1 lane

Location: Ciseeng, Bogor district, West Java Province. Semangi market, Surakarta city, central Java Province Design concept: This design is suitable for the collector yard or truck wash station that has small number of incoming trucks or there is not enough land for C&D station location. C & D station consists of 1 lane that can only load 1 truck Design 3 : C&D station with 1 line (capacity for 1 truck)

C&D station for 1 truck