ILC Power Coupler – Fabrication & Cost CPI Beverly Microwave Division November 12, 2013.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Industrial Studies of ILC Cavities & Component Production in the Americas IPAC 11 – Kyoto, Japan May 23, 2010 Science Projects Homeland Security Medical.
John Amann – ILC Mechanical Engineering 11/13/06
ISIS Second Target Station
SLAC - B (Waveguide Assembly) Final Project Report Eric Coblin Clay Fenstermaker Greg McCandless Eric Schmidt Coach: Vikash GoyalLiaison: Jeff Rifkin.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Alpha Magnetic Spectrometer - 02 Flight Safety Review Phase II May , 2007 Analysis - Welding and Brazing Dan Rybicki – Materials Analysis Jacobs.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Welding Inspection and Metallurgy
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Manufacturing process, validation and factory test
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Test Results on Sealing in Options A & E Dean Walters Argonne National Laboratory Michael MinotMinoTech Engineering Inc.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
Lutz Lilje XFEL Coupler Some Comments. XFEL Coupler WEBEX Lutz Lilje DESY Status TTF III Coupler  has shown full ILC performance  has not.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
All Metal Gate Valve from VAT
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Ed Daly for W. Robby Hicks
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Power coupler at DESY & for XFEL
ELLIPTICAL SCRF CAVITIES
Manufacturing of the IFMIF series power couplers
FKPPL and FJPPL Joint Workshop
High Power Couplers and… pushing the limits of SC cavities
Introduction to Jefferson Lab
Nick Walker (DESY) EU GDE Meeting Oxford
Selection Criteria Properties Availability Cost
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

ILC Power Coupler – Fabrication & Cost CPI Beverly Microwave Division November 12, 2013

Agenda CPI experience with Power Couplers CPI Power Couplers Key coupler process technology Analysis of Coupler fabrication difficulties Analysis of Coupler specification difficulties What can we do to provide the best product? What can science labs do? Procurement questions for ILC community Cost comparison of STF vs. TTF-III/XFEL Design style comparison Design part count Rough cost comparison of STF and TTF couplers

CPI Experience with Power Couplers Power Couplers manufactured at CPI Cylindrical Window Designs Coax Planar Windows

CPI | Communications & Power Industries ModelAccelerator ApplicationFreq. (MHz) Peak and Avg. Power (kW) Status VWP 3097IFMIF Prototype (CEA Saclay) and 200Delivered 2 VWP 3098FRIB Prototype (MSU)32214 and 14Delivered 2 VWP3107NSLSII Upgrade and 500Delivered 1 VWP 3070 VWP1185/86 Free Electron Laser Injector (AES, BNL) Free Electron Laser Injector (AES, JLAB) and and 350 Delivered 2 Delivered 4 VWP 1133, VWP 1162 SNS (JLAB) and RIA (MSU) and 60Delivered 8 VWP 3049 (TTF3)Tesla Test Facility (CNRS Orsay, DESY), ILC (Fermi, SLAC), and Triumf and 7.2Delivered 114 VWP 3032 VWP 3069 ERL Injector Cavity (Cornell and Triumf) ERL Injector (Daresbury) and 75 Delivered 14 Delivered 2 VWP3113SRF Accelerator (Peking University) and 60Delivering 4 VWP 3108Energy Recovery Linac (Cornell) and 10Delivered 2 VWP 3088XFEL Third Harmonic Cavity (Fermi, DESY) and 12.5Delivered 12 Delivering 18 CPI Power Couplers

CPI | Communications & Power Industries Key Coupler Process Technologies CPI has been manufacturing power couplers for 12 years CPI’s key process technologies qualified by DESY, CNRS-Orsay, and Cornell have been in continuous use for 10 years High RRR-copper plating of stainless steel – TTF3 specification met Thickness and RRR carefully controlled TiN coating of alumina windows for multipactor suppression – TTF3 specification met Thickness and composition carefully controlled Secondary yield less than unity E-beam welding of copper cylinders 100% penetration depth required Complex fixtures required to protect ceramic surfaces from spattered material TIG welding of stainless steel components Vacuum brazing Metal to metal seals Stainless steel to stainless steel Copper to stainless steel Ceramic to metal joints Alumina to copper

Analysis of Fabrication Difficulties with TTF-III Fabrication Cost Drivers EB Welding of Copper Collars (Adds ~10% to the overall product cost) Requires internal masks and complex support fixtures Tests have been run to replace this process with a modified TIG weld process to reduced manufacturing costs High RRR Copper Plating (Adds ~ 10% - 20% to the overall product costs) Requires significant control/ sampling program TiN coating (Adds ~5% to the overall product cost) Requires significant control/ sampling program (Thickness, Composition) Machined Part Costs (Cost of Machined Parts is typically 1/3 of the factory cost) Raw material cost, Geometric complexity, Tolerances, Part size,

Analysis of Fabrication Difficulties Fabrication Cost Drivers Brazing Least expensive and usually the best overall joining process, however, RRR value of copper plated parts deteriorates if plated prior to the braze. TTF-III Brazed Couplers A pair of brazed TTF-III Couplers was produced many years ago, with the copper plating applied after the braze, as part of another experiment TIG Welding Efficient manufacturing process, but requires proper joint design, fixturing, and post cleaning. Surface smoothness can be difficult to assure. Final Inspection by Quality Assurance adds between 2% - 4% to product cost Specify based on functional requirements Mechanical measurements, boroscope, visual Automated inspection decreases costs

Analysis of Specification Difficulties Specifications that increase cost or manufacturing difficulties Operational requirements will dictate design and costs A simple single window coupler may cost 1/3 of the price of a complicated double window design Size of coupler significantly affects costs Final Cleaning by Vendor Elimination of redundant cleaning by vendor and user will have minor cost savings (2%) Cleaning tougher on STF due to choke design Material Specifications Unique material specifications that are tough to procure adds cost, risk, and uncertainty Examples: 316LN for XFEL coupler with three different material specifications from UNS, CERN, DESY Unique hardware material specified for XFEL (silicon bronze, aluminum) European material specifications may be tough to procure in US

Analysis of Specification Difficulties Specifications that increase cost or manufacturing difficulties High RRR Copper plating quality Requirements are costly The initial TTF-III qualification of plating by DESY/CNRS/LAL involved: 30 + Engineering test samples at CPI to optimize process prior to providing customer samples An initial rejection of our first samples An improvement program Customer approval of next samples with additional work done after approval Thickness uniformity and RRR specifications are the most difficult to meet but can be met with proper manufacturing controls from a well-qualified process Requires significant control / sampling program to maintain stringent quality Thickness uniformity - Periodic and process measurements RRR value - Periodic measurements Micro Thickness Uniformity - Periodic metallurgic sample preparation Adhesion - Periodic LN2 Shock, ultrasonic, or mechanical stress tests Surface Finish - Periodic measurements of samples Cleanliness - In process inspection Oxidation - In process inspection

Analysis of Specification Difficulties Specifications that increase cost or manufacturing difficulties Final QC measurement requirements Difficulty and cost depend on time and complexity TiN Coating Quality Cost related to complexity of specification and geometry Unique testing requirements add to cost Outgassing rate, RGA, material tests, Auger- Edax of coatings, thermal shock, vibration, pressure/flow rate, etc. Shipping requirements should be properly specified and reviewed with vendors beforehand Contractually specify that shipping issues are the responsibility of the vendor

How Do We Provide the Best Product What can Scientific Labs do to help Promote prototype test programs - (Prototypes, Cost reductions, Pre-production, Production) Procure ILC couplers from qualified vendors with pre-qualified processes Work with industry to analyze designs, and processes and provide test result & feedback Choosing design(s), and reduce risk, based on a proven demonstrations of: Electrical performance (Insertion Loss, VSWR, Arcing, Multipactor,etc.) Vacuum, thermal and mechanical performance Life, Reliability ( MTBF) Procurement Questions for ILC community: If the TTF-III design is chosen, will Toshiba and others be given the design drawings, and would they be willing to build the TTF design? If the STF design is chosen will other participants be given the STF design to manufacture, or be given the opportunity to build a similar design? Alternatively, will the functional requirements be specified, leaving the manufacturer to choose an appropriate design, which best matches their core manufacturing competencies ?

Comparison of Coupler Designs CPI has manufacturing experience with both the TTF style and planar window style of Power Couplers, including cost related issues Cylindrical Window Designs Coax Planar Windows

Design Comparison on Same Scale STF TTF-III

Cost Comparison (Material Part Count) STF Part Count Estimate: TTF-III Part Count Estimate: 31 Instrument port parts excluded from count, since it is assumed that the number of ports will be equal in both designs per ILC requirement

Rough Cost Comparison - Relative to TTF-III Basis of Cost EstimateTTF-III & XFEL STF Material Part Cost: Raw material cost is based on weight and therefore proportional to (diameter) 2 Based in same part length Machining cost is also proportional to (diameter) 2 1 (STF Part Count/TTF Part Count)x(Diameter ratio) 2 (41/31)(1.3) 2 = 2.24 times more expensive than TTF Labor Cost: Labor cost is related to number of parts handled and size (diameter) Processing adds cost relative to diameter 1 (STF Part Count/TTF Part Count)x(Diameter ratio) (41/31)(1.3) = 1.72 times more expensive than TTF Other Factors: EB –Welding may add a premium of 10% TiN coating planar coax windows may add a premium of 5% Brazing of copper plated parts does not add cost, compared to plating entire assembly, but may result in excessive heat loss, due to RRR reduction Overall Cost: Estimate: Cost = Material & Labor weighted equally (Material Cost +Labor Cost)/2 x.95= 1.9 The cost to produce an STF Coupler is expected to be roughly twice the cost of the TTF-III