1 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.

Slides:



Advertisements
Similar presentations
Prof Parameshwar P Iyer Indian Institute of Science1 Entrepreneurship and Business Management Mega Bucks Workshop Indian Institute of Technology Kanpur.
Advertisements

February 15, Master Plan for Facilities & Infrastructure Master Plan for Facilities and Infrastructure Whittier | Lenexa | Country Club Hills | Birmingham.
SAUDI ELECTRICITY COMPANY (SEC)
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
INDUSTRIAL & SYSTEMS ENGINEERING
2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
The Key Issues in the Korean Electric System
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
ACTIVITIES OF SUPPORTING SMES DEVELOPMENT IN VIETNAM
0 - Press Conference - Introduction by Mr. Willy Bosmans, President of Eurogas 19 May, 2005, Hotel Hilton Vienna.
Citizens’ Academy Kathy Viehe GRU Interim General Manager April 15, 2015.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Energy Regulation Legislation in Sri Lanka
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Organizational Structure of RAO UES Executive Administration During Reform Period 22 March 2004.
Electricity Reforms in Bangladesh
Strategies for the security of electricity supply.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Economy Specific Research and Introduction of Successful Results of New / Renewable Energy Technology Development and Demonstration Toru Usami International.
Industrial Engineering Roles In Industry
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
California’s Electricity Industry: yesterday and today James Bushnell University of California Energy Institute
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
February 2004 Korea Western Power Co., Ltd. Presentation to Standard & Poor’s.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Basic law of energy policy in Japan toward to the development of CES Takao KASHIWAGI Professor, Ph. D, Graduate school of Bio-Applications and Systems.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
The Future for Power Sector Regulation in Ontario Jan Carr Vice Chair, Ontario Energy Board APPrO Canadian Power Conference & Trade Show November 24, 2004.
Process of Planning, Designing and Financing a Hospital
INTERREG IIIC - REGENERGY Promoted by the European Union Development of municipal District heating supply in Latvia Gaidis Klavs Institute of Physical.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Indy Butany DeSouza Consumer Benefits from the Competitive Provision of Energy Services and the Ontario Smart Meter Implementation.
Presentation to Select Committee on Economic Development
Kwang Dong Pharm Implementing ERP MIS Term Presentation Kim, Younga Park, Hyejin Kim, Kyungdoc Kim, Kyungtae Group.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
May 2003 Korea Western Power Co., Ltd. Presentation to S&P.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
California’s Public Interest Energy Research Program Vice Chair David A. Rohy, Ph.D. California Energy Commission February 1, 1999.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Electricity & Regulatory Overview of Korea
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.
Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.
The Government Role in BOT
Chief Executive Officer RAO “UES of Russia”
a. Financing b. Designing c. Construction d. Operating
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
New Horizons for Korean Energy Industry
Presentation transcript:

1 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration

3 Real Time Performance Monitoring in Taean TPP Apr. 2004

4 Overview 1. Overview of KEPCO/KEPRI 2. Overview of WP/Taean TPP 3. Introduction of RTPM for Taean TPP 4. System Configuration 5. Previously… 6. Currently… 7. Future Samples 8. Final Objectives 9. Conclusion

5 Overview of KEPCO/KEPRI Brief History of KEPCO 1887 First Electricity 1898 First 3 Electric Companies - Hansung - Namsun - Chosun 1961 Merge of 3 Electric Companies - KECO  KEPCO (1982) Separation of Generation Sector from KEPCO - KEPCO (T/D, Marketing) - 6 Generation Co.. 1 Nuclear Power. 5 Fossil Power Now Separation of Distribution and Marketing Sector from KEPCO - KEPCO (T/D) - 6 Generation Co. - 6 Distribution Co Wholesale Competition 2009 Retail Competition

6 Overview of KEPCO/KEPRI(cont.) Key Objectives of the Restructuring Plan In January 1999, the Government released the Basic Plan for Restructuring of the Electricity Supply Industry The Restructuring Plan involves the unbundling of KEPCO’s power generation, transmission, distribution and retail businesses in stages, introducing competition into the electricity market. The key objectives of the Restructuring Plan Introduce competition and thereby increase efficiency in the Korean electricity market Ensure a long-term, inexpensive and stable electricity supply Promote consumer convenience through the expansion of consumer choice

7 Overview of KEPCO/KEPRI(cont.) Summary of the Restructuring Plan Generation Transmission Distribution KPX Transmission Distribution NGGGGG KPX Transmission NGGGGG DDDDD Phase Ⅰ - Preparation Phase Ⅱ - Generation competition Phase Ⅲ - Wholesale competition Phase Ⅳ - Full Retail competition 1/199912/20004/ Release of Restructuring Plan Passage of Restructuring Bills Gencos were separated KPX and KEC setup Cost-based pool system begins Genco sales begin Discos will be separated Price-based two- way bidding system will begin * KPX : Korea Power Exchange * KEC : Korea Electricity Commission

8 Overview of KEPCO/KEPRI(cont.) Phase 1 (Current Industry Structure) KOSEPCO KOMIPO KOWECO KOSPO KEWESPO KHNP Policy control and supervision KPX Consumers IPPs KEPCO Transmission and Distribution PPA Preparation stage (Jan. 1, 1999 to Apr. 2, 2001) IPPs can supply electricity to KEPCO pursuant to existing PPA April, 2001 : Generation Sector separated from KEPCO - Non-nuclear and non-hydro part  5 separate wholly-owned gencos - Hydro and Nuclear part  1 separate wholly-owned genco KEPCO has retained monopoly position for only T&D parts  IPP : Independent Power Producer  PPA : Power Purchase Agreement

9 Overview of KEPCO/KEPRI(cont.) Phase 2 (Generation Competition) Present phase Cost-Based Pool (CBP) system KPX (Korea Power Exchange) to deal with sale of electricity (MO & SO) KEC (Korea Electricity Commission) for regulation and fair competition Privatization plan of Gencos 1) KOSEPCO was selected as a non-nuclear genco to be sold through public offering 2) After evaluating the result of the 1st stage, next stage will be proceeded.

10 Overview of KEPCO/KEPRI(cont.) Phase 3 (Wholesale Competition) April, 2005 ~ 2009 Distribution sector will be separated from KEPCO Unbundling process : allocate distribution assets TWBP (Two-way bidding pool) system Vesting contract will be introduced as a safety mechanism to mitigate pool price volatility. Large consumers with demand over 50MW can purchase electricity directly from generation company.

11 Overview of KEPCO/KEPRI(cont.) Phase 4 (Retail Competition) Final phase of the restructuring plan Consumer can purchase electricity from distribution/retail companies Large consumers with demand below 5MW can purchase electricity directly from generation company in 2009 KEPCO will act as a sole transmission company in Korea

12 Overview of KEPCO/KEPRI(cont.) Roles and Responsibilities of KEPRI –R&D planning and implementation –R&D project proposal, selection, and conduct –Evaluation, use, and transfer of R&D results –Technical home doctor –Engineering support and training for facility operation and construction –Electric power industry technology evaluation and planning concerning fund management

13 Overview of KEPCO/KEPRI(cont.) History of KEPRI Now Electricity Laboratory Technology Development Research Laboratory KEPCO Research Center KEPRI (Korea Electric Power Research Institute) KEPRI (Big Transition Time) Government R&D Policy Technology Research Office at KEPCO Head Office Mckinsey Consulting World Class R&D Institute Invitation of Foreign Scientists Focus on the development of O&M Technologies Significant Economic Contribution to Power Plant Restructuring of Electricity Industry Changes in the Role and Responsibility of KEPRI Research institute for KEPCO and other Gencos R&D funds from Electricity industry and Government Time Name Contents

14 Overview of KEPCO/KEPRI(cont.) Organization President Quality Assurance Team General Administration Office Technology Policy & Planning Office Electric Power Industry Technology Evaluation & Planning Office Power Generation Research Lab. Non-Destructive Evaluation Center Nuclear Power Generation Research Lab. Power System Analysis Center Power System Research Lab. Structural Engineering Lab. New Technology Center

15 Overview of KEPCO/KEPRI(cont.) Personnel Degree Number Doctor Master Bachelor Others Total % 19% 11% 20% 21% 24% GenerationNuclearT/D StructureTech. PlanAdmin. Academic Background Field Generation Nuclear T/D Structure Tech. Planning Tech. Planning Number Admin. 107 As of Jan. 2004

16 Overview of KEPCO/KEPRI(cont.) Budget (2004) Budget TotalR&D Project Operational Expenses Investment (Facility & Equipment) Unit: million US$

17 Overview of WP/Taean TPP Overview of WP

18 Overview of WP/Taean TPP (cont.) Overview of WP (cont.)

19 Overview of WP/Taean TPP(cont.) Overview of Taean TPP

20 Overview of WP/Taean TPP(cont.) Overview of Taean TPP (cont.)

21 Overview of WP/Taean TPP(cont.) Overview of Taean TPP (cont.)

22 Introduction of RTPM for Taean TPP Why RTPM is needed in Taean TPP.. –Improvement of Power Plant Efficiency –Assurance of Reliability, Stability and Safety –Decrease in Cost of Power Generation –Improved Monitoring of Plant conditions –Advanced Method for Long Term & Frequent Data Storage –Suggestion of Optimal Operating Condition

23 System Configuration Previous

24 System Configuration Suggested

25 System Configuration Final

26 Previously…

27 Previously…(cont.)

28 Previously…(cont.)

29 Previously…(cont.)

30 Previously…(cont.) Result.xls

31 Currently… Periodic tasks such as daily reports, calculating efficiency of equipment and estimates of fuel expenses are automatically generated. Through internet/intranet, any authorized person can access plant information which was only accessible in MCR (Main Control Room). Managers and maintenance workers as well as operators can monitor the performance and condition of the plant. Long term data storage for the plant is now possible. Though DCS (Distributed Control System) has its own function for data storage, the logging rate and term were so limited that people had difficulty in analyzing data. We learned that the OSI PI System offers better ways to compress and retrieve data.

32 Currently…(cont.)

33 Currently…(cont.)

34 Currently…(cont.)

35 Currently…(cont.)

36 Currently…(cont.)

37 Currently…(cont.)

38 Currently…(cont.)

39 Currently…(cont.)

40 Currently…(cont.)

41 Currently…(cont.)

42 Currently…(cont.)

43 Currently…(cont.)

44 Future Samples

45 Future Samples (cont.)

46 Final Objectives Data Reconciliation Operating Advisory System Improvement of Reliability and Stability Enhanced Calculation Accuracy Analysis of Combustion and Heat Transfer Distribution

47 Conclusion Benefits with PI –Practical Use of Plant Information –Sharing of Plant Information –Advanced Storage & Retrieve of Plant Information Requirements for Future Improvement –More Convenient Method for Tag Management –Enhanced Graph Features in PI ProcessBook –More Solutions for Various DCS Interfaces

49 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration