Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
ERCOT Billing, Settlement Disputes & Data Extracts
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Billing, Collection and Disbursement Procedures
Open Access and Trading. Trading “Trading" means purchase of electricity for resale thereof” Any person is allowed to undertake trading in electricity.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
CII – PTC Conference on The Power Market Post Electricity Act 2003: Entities, Business Models and Implications by Karthikeya Pisupati Deloitte Touche Tohmatsu.
Presentation Outline Indian Electricity Market
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC Paper on Open Access Presentation by the MPERC Bhopal At New Delhi 25 September 2003.
Open Access In Interstate Transmission system
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
11/27/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
12/7/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Ch. 5.4 Deposit Account Documents. When an account is opened, customers receive documentation outlining the rights and responsibilities associated with.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
Point of connection Mechanism
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
1 Credit insurance: Why ?. 2 Credit Insurance: Why ? (1)  Credit in B-to-B relationships is a tool for the commercial development of the seller.  However…
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. Confidential – Oracle Internal 1.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Interstate Transmission system
Operationalizing One Nation One Grid
Financial Accounting II Lecture 27
Open Access.
Open Access.
5 Chapter Currency Derivatives South-Western/Thomson Learning © 2006.
Scheduling of Collective Transactions Through Power Exchange
Commercial Agreement Basic Concepts.
“ Open access / Power Exchange Regulations/experiences of SR ”
Congestion regulations
PSS developments in Bhutan Royal Monetary Authority of Bhutan(RMA)
IN INTER-STATE TRANSMISSION
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
E-bidding for Short Term Open Access by – S
Settlement system under Open Access
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

Settlement system of Bilateral transactions under Open Access -V.Balaji Chief Manager SRLDC

Terms & meaning Open Access – Non-discriminatory Access to Tr. System Nodal RLDC – RLDC where the Drawee utility is located Applicant - Who applies for OA Customer - Who is granted OA

Category of OA Tx. Advance - Reservation of Cap. up to a max. of 3 months (for each month) First Come First Serve – Reservation of Cap. if any, after allotment to Adv. Applicants (upto a max of next 3 months) Day Ahead/ Reservation of Cap. On Day ahead/ Contingency - Reservation of Cap. On Day ahead/ same day basis, if any after allotment to Day Ahead

Philosophy To avoid pan-caking of charges Reduce cost of power/ burden on end user Encourage transactions Reasonable levy of charges for the usage Fair compensation to the Long term user of Tr. System Fair compensation to the Owner of Tr. System Reasonable charges to RLDC/SLDCs

Curtailment in case of Tr. constraint No No refund Yes Refund Pro-rata Charges of Curtailed Capacity

Settlement of Energy Charges Trader Energy Charges Seller Buyer Trader Trader’s commission charges

Settlement of STOA Charges Nodal RLDC CTU Application fee STU/ licensee charges All STUs involved 75% to Long term Customers Nodal RLDC ISTS+ IR link charges CTU 25%of ISTS to CTU for Augmentation Is OA Granted? Yes Operating Charges For RLDCs All RLDCs involved Operating Charges For SLDCs All SLDCs involved

Bilateral Transaction charges 1) Application fee Rs.5000 per each transaction (Non-refundable) Along with application for Adv/FCFS Within 3 working days for DA/Contingency 2) Transmission Charges a) Regional/CTU Tr. Ch. Rs.80/MWh (ps 8/u) for within region Rs.160/MWh (ps 16/u) for b/w adjoining regions Rs.240/MWh (ps 24/u) for wheeling by one or more regions b) STU/SEB/Tr. Licencee Tr. Ch. To be paid only if the Tx is not internalised. as specified by SERC or Rs.80/MWh (ps 8/u)

Bilateral Transaction charges Operating Charges Rs. 2000/day for each Tx. For each RLDC involved For each SLDC involved (only if not internalised)

Mode of payment to Nodal RLDC Bank draft/ at par cheque/ electronic money transfer No outstation cheque Within 3 working days Transaction-wise payment details to be submitted in Format -VII

Default 0.04% simple interest for each day of delay/default Nodal RLDC may not schedule the Transaction Entertain further application in future till dues are cleared

Other Charges 1) Energy charges As negotiated mutually based on market conditions, demand-supply position Rate need not be disclosed to RLDCs To be directly settled between buyer /seller Trader to collect and disburse May be influenced by losses, trading marigin etc. Charged on energy as reflected in monthly REA REA to furnish figures @Buyer/seller periphery, IR periphery, Peak/offpeak , Discomwise etc.

Other Charges Trading marigin @4ps/u if cost of power =< ps350/u @ 7ps/u if cost of power > ps350/u To be collected by Trader directly from the Buyer

Revision in OA schedule Only for Advance/ FCFS Min. 2 days notice/request excluding the day of revision Scheduled OA charges for 2 days to be foregone OA charges corresponding to Downward revision to be refunded To be reconciled for previous month and refunded within 15 days of current month

Disbursement Nodal RLDC to Reconcile all charges for previous month Disburse to all stake holders within 10 days in current month Disbursement of CTU charges to concerned RTS STU charges to concerned STU/SEB Operating charges to concerned RLDCs Operating charges to concerned SLDCs

Disbursement RTS to retain 25% of CTU transmission charges Balance 75% to give credit in their Transmission Bill (as per weighted Average entitlement to each Long term customer)

Refund When to refund ? A) Incase of curtailment due to transmission constraints B) Incase of revision in Schedule How much to refund ? A) Pro-rata charges for the energy curtailed B) Retain a minimum of five days of OA charges(Tr and Op ch.) and Refund balance OA charges (transmission charges and operating charges) for the reduction in Energy Deadline for Refund : Within 15 days of current month for Tx curtalied/revised in previous month

Indemnification No responsibility to Nodal RLDC In case of Default Indemnify RLDC/ SLDC harmless from All damages/ losses/ claims/ costs etc.

Internalization As Declared in the Application Buyer/Seller is said to be internalised : If they are Directly connected to CTU (ex. SEBs, CGS etc.) In case of an Embedded Customer where The Connected STU is not yet unbundled In case of organizations where full commercial separation is not in place When STU charges and losses are not published If the power purchase rate includes the Tr. Ch. And Losses Implications if internalised : No Transmission charges No Scheduling/ operating charges No Normative Losses

Non-Internalization As Declared in the Application Buyer/Seller is said to be Not Internalised If Buyer/Seller is embedded customer (CPP, IPP, HT consumer etc.) in a not-yet unbundled SEB In an unbundled state setup case If Buyer/Seller is a Power purchase centre, Discom in an unbundled setup Implications if Not internalised : Transmission charges to be paid Scheduling/ operating charges to be borne Normative Losses applicable