Alaska Regional Response Team Places of Refuge By John Bauer Alaska Department of Environmental Conservation.

Slides:



Advertisements
Similar presentations
Governments role in the regulation of offshore exploration activities Commonwealth waters Environmental Sustainability Unit – August 2010.
Advertisements

Places of Refuge ACP Chapter 9690 Ms. Allison OBrien Mr. Tim Lupher.
Pacific States-British Columbia Oil Spill Task Force Annual Meeting Seattle, Washington September 25, 2013.
Irish Coast Guard Local Authority oil spill Contingency Plans.
PACIFIC STATES/BRITISH COLUMBIA OIL SPILL TASK FORCE and Places of Refuge BRIEFING FOR THE CANUSLANT EXERCISE June 13-16, 2005 Jean Cameron, Executive.
Cook Inlet Harbor Safety Committee Informational Meeting Enhancing the Marine Transportation System (MTS) in Cook Inlet.
U. S. Coast Guard Role and Process for LNG Mr. Alan Moore LT Dan McLean
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
Briefing to Kenai Peninsula Borough February 19, 2013.
Overview Which IMO measure should you choose? Use of four real world examples Factors to consider in choosing an IMO measure Summary of potential difficulties.
An Ocean of Opportunity: An integrated maritime policy for the EU 1 Places of refuge: General legal framework and developments within IMO and the EU Alexandros.
Potential Places of Refuge in Alaska. Place of Refuge A temporary location to stabilize a vessel, protect life, remove hazards, protect public health.
Briefing at: Consequence Analysis Workshop October 30, 2012.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Petrochemicals in harbor areas; safety supervision and emergency response Presented by Captain David Murk U.S. Coast Guard Senior Maritime Advisor to the.
Washington Marine & Rail Oil Transportation Study Preliminary Results Linda Pilkey-Jarvis Spill Prevention, Preparedness and Response Program.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Water Supply Planning Initiative State Water Commission November 22, 2004.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
United States Coast Guard Marine Transportation Systems Management George Detweiler U.S. Coast Guard Washington, DC NOAA’s Hydrographic Services Review.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
California Drought Contingency Plan Update 2013 Project Team Meeting May 31,
The TERMPOL Review Process RDIMS# Presentation Outline  What is TERMPOL?  The Purpose of TERMPOL  How TERMPOL Works  Benefits of TERMPOL 
Forging Partnerships on Emerging Contaminants November 2, 2005 John Vandenberg Associate Director for Health National Center for Environmental Assessment.
Unclass SONS 2010 SNNE Briefing November 2009 Sector Northern New England.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Connecticut Department of Energy and Environmental Protection.
- DCWAC - Where we’ve come from, Where we are, Where we’re headed.
2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011.
Development of a Common Effects Methodology for OW and OPP EPA Development Team Office of Pesticide Programs Office of Water Office of Research and Development.
U. S. Coast Guard ANS Program Update September 10, 2003 ANSTF Western Regional Panel Mtg Presented by LCDR Kathy Moore Chief, Environmental Standards Division.
FOSC Prince William Sound May 2015 CDR J. T. Lally CG Marine Safety Unit Valdez.
1 Prince William Sound Annual shippers’ exercise unclassified “Guardians of Prince William Sound”
Presented by Betty Schorr Alaska Department of Environmental Conservation November 14, 2012.
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
 MSU Port Arthur Maritime Industry Plan o Port Conditions  MSU Port Arthur Hurricane Plan o Hurricane/Severe Weather Response Operations  Sector Houston.
11 The Cook Inlet Potential Places of Refuge : Pre-Planning for better decisions Tim Robertson, Nuka Research & Planning Group LLC.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
1. Regulatory Oversight Regime on the Great Lakes & St. Lawrence Seaway Webinar presentation January 2014 Transport Canada Donald Roussel
February 27,  Welcome/Introductions  Overview of the Plan  Updates on Information Request  Project Prioritization  Public Involvement Meeting.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Tripartite Meeting Tokyo, September 2007 Ship Recycling An Overview of Regulatory and Industry Developments Presented by INTERTANKO and ICS on behalf of.
Supporting Community Participation in U.S. Arctic Ocean Governance Strengthening Institutions Strategies for Cooperative Management in the Marine Environment.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
2014 Prince William Sound SeaRiver Maritime Exercise CDR Benjamin J. Hawkins CG Marine Safety Unit Valdez.
DEEPWATER HORIZON $1B EARLY RESTORATION AGREEMENT Governor’s Advisory Commission May 11, 2010.
Vessel Traffic Risk Assessment (VTRA) Update for North Puget Sound February 13, 2013 Todd Hass*, Ph.D. Program Manager: Marine & Nearshore Special Projects.
FOSC Prince William Sound January 2015 CDR J. T. Lally CG Marine Safety Unit Valdez.
PWS Shipping Exercise 28 – 30 September 2015 Mark R. DeVries C&CM/ER Director, BP Alaska.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
Dispersant Workgroup Update September 24th, 2015 CDR Bo Stocklin, USCG.
Dispersant Workgroup Update May 20th th, 2015 CDR Bo Stocklin, USCG.
US Coast Guard Sector Anchorage Alternate Planning Criteria.
The mission of the Oil Spill Task Force is to strengthen state and Provincial abilities to prevent, prepare for, and respond to oil spills.
 Welcome/Introductions  Overview of the Plan  Updates on Information Requests  Plan Discussion  Hazards/Gaps/Actions/Priorities  Next Steps.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
2011 Hurricane Season Brief
Hurricane Port Conditions & Preparedness
Captain Patrick Gerrity United States Coast Guard Sector Portland
PORT ACCESS ROUTE STUDIES AN UPDATE
EHCMA Hurricane Workshop
Spill Prevention, Preparedness and Response Program
National Environment Policy Presentation
Aleutian Islands Risk Assessment Project Overview
Update of Guidance document on Wind ENErgy and natura 2000
Alaska Roadless Rulemaking
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Presentation transcript:

Alaska Regional Response Team Places of Refuge By John Bauer Alaska Department of Environmental Conservation

ARRT Places of Refuge Working Group Alaska Regional Response Team Places of Refuge Working Group Meeting March 10 with industry, regulators, RCACs, pilot association Present guidelines for use throughout Alaska Identify process for decision making Concurrent with the PS/BC Task Force POR

ARRT Places of Refuge Working Group Alaska POR Guidelines Assist authorities in POR decision making Use standardized format for evaluating risks Recognize the authorities and resources of agencies, local governments, landowners Decision making guidelines separate from pre-identifying POR Include guidelines in the Unified Plan update

ARRT Places of Refuge Working Group Identifies jurisdiction of: US Coast Guard State Local and tribal governments Resource agencies Vessel masters

ARRT Places of Refuge Working Group Management Structure If time allows, COTP activates a Unified Command Provide for consultation of local and tribal governments, landowners, resource agencies If time does not allow, COTP addresses the POR request and notify stakeholders as soon as possible

ARRT Places of Refuge Working Group Risk-based decision-making process to evaluate the risks of the vessel, public health and the environment If the ship remains in the same position If the ship continues on its voyage If the ship reaches a place of refuge If the ship is taken out to sea

ARRT Places of Refuge Working Group Step by step process and checklists Master or company to provide status of ship Evaluate if ship should be offered a place of refuge Determine a specific place of refuge or grounding site Identify environmental resources at risk

ARRT Places of Refuge Working Group Process for pre-identifying Places of Refuge Local committee performs risk analysis Pre-identify potential places of refuge Include places of refuge in subarea plans

PWS Places of Refuge Scope of Work Overview Larry Iwamoto PWS RCAC

Background COOK INLET - Prior Events:  Perl Island Drill – October 1996  Barge Oregon – January 1997  PWS Tanker Drill – October 2003  Latest Updates:  9 sites pre-identified, part of Change 1 INTERNATIONAL Prestige Spill – November 2002

Cook Inlet Subarea - Places of Refuge Anchorage Drift River Nikiski Kachemak Bay Koyuktolik Bay Port Graham Port Chatham Seldovia Seward Whittier

Other Initiatives Pacific States/BC Task Force Work Group formed to address this issue Aleutians GRS development will address Places of Refuge as well Separate Initiative for Prince William Sound underway, sponsored jointly by PWS RCAC and DEC

General Criteria ● Status of the vessel● Public safety ● Vessel traffic● Prevailing winds ● Anchoring ground ● Water Depths for Anchoring* ● Environmental resources at risk ● Strategies to protect sensitive areas ● Navigational approach to the mooring site ● Available dock/support facilities ● Available skilled/spill response labor ● Economic concerns and potential impacts* *added for PWS

PWS POR Development Work Group – 1 st Meeting in May Use PWS Marine Firefighting Plan as a source document Process to be reviewed as part of pre-drill training for PWS PREP Drill Overall product incorporated as part of Change 2 to PWS SCP

PWS Northeast Zone

Project Deliverables Risk Assessment Map (draft completed) Facilitate Meetings of the PWS POR Work Group (Initial meeting, monthly meetings planned) Prepare Initial Draft Document of PWS POR for review and comment by Work Group Prepare Final Draft Document for inclusion into the PWS SCP, Change 2 public review draft

June 2004: Initial draft document to work group for review and comments; possibly applied during MATES training July 2004: Public comments solicited; comments reviewed by work group for action July 2004: Final product submitted to DEC and RCAC Project Managers. Fall 2004: Incorporated as part of Change 2 for public review Project Timeline

QUESTIONS/COMMENTS? PWS RCAC