1 Presenter: Tracy Wessler June 6, 2007 Outsourcing Quality Assurance and Contract Surveillance Activities U.S. Census Bureau Decennial Response Integration.

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
INFORMATION SOLUTIONS The National Quality Contractor Technical Assistance to State HCBS Waivers Beth Jackson, Ph.D
1  AGA-DC and GWSPCA 6 th ANNUAL CONFERENCE OMB Circular A-123, Appendix A Internal Control Over Financial Reporting Innovative Approaches Jerome A. Vaiana.
Contractor Assurance System AC Overview October 13, 2009.
1 Meeting On The Management Of Statistical Information Systems (MSIS), Oslo, May 18-20, 2009 Shri Narayanan, Economic Systems, TGS Jola Stefanska, STA.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Stepan Potiyenko ISS Sr.SW Developer.
PROCESS AND PRODUCT QUALITY ASSURANCE
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
Chapter 3 The Structure of the CMM
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
1 Analytical Services, Inc. Huntsville, Alabama Jack Conway Vice President Systems Management CMMI Pilot Project Coordinator.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
Software Engineering Institute Capability Maturity Model (CMM)
Internal Auditing and Outsourcing
Effective Methods for Software and Systems Integration
Process: A Generic View
CMMI Course Summary CMMI course Module 9..
Project Management Process Overview
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Integrated Capability Maturity Model (CMMI)
SQA Architecture Software Quality By: MSMZ.
Process Assessment Motivation SEI Capability Maturity Model
Software Quality Assurance Activities
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
© 2013 Cengage Learning. All Rights Reserved. 1 Part Four: Implementing Business Ethics in a Global Economy Chapter 9: Managing and Controlling Ethics.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Chapter 2 Process: A Generic View
Software Project Management Lecture # 10. Outline Quality Management (chapter 26)  What is quality?  Meaning of Quality in Various Context  Some quality.
Lecture Topics covered CMMI- - Continuous model -Staged model PROCESS PATTERNS- -Generic Process pattern elements.
Managing CMMI® as a Project
Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003.
Georgia Institute of Technology CS 4320 Fall 2003.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Ali Pabrai, CISSP, CSCS ecfirst, chairman & ceo Preparing for a HIPAA Security Audit.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Ch-1 Introduction The processes used for executing a software project have major effect on quality of s/w produced and productivity achieved in project…
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(C.S.E) UIT, M.S(S.E) AAU Denmark Assistant Professor Department.
Click to edit Master title 1 1 Raymond W. Blowitski, Office of Analysis, HS-32 Phone: (301) Strategy for Implementing DOE O 210.2, DOE Corporate.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Figures – Chapter 26. Figure 26.1 Factors affecting software product quality.
Security Methods and Practice Principles of Information Security, Fourth Edition CET4884 Planning for Security Ch5 Part I.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Dr. Yeffry Handoko Putra, M.T
BIL 424 NETWORK ARCHITECTURE AND SERVICE PROVIDING.
Software Quality Assurance
Software Configuration Management
Chapter 10 Software Quality Assurance& Test Plan Software Testing
Presented To: 3rd Annual CMMI Technology Conference and User Group
Enterprise Content Management Owners Representative Contract Approval
Description of Revision
CMMI – Staged Representation
Lockheed Martin Canada’s SMB Mentoring Program
Prepared and Presented By:- Abhishek Rautela
Project Management Group
Module 3 Part 2 Developing and Implementing a QI Plan: Planning and Execution Adapted from: The Health Resources and Services Administration (HRSA) Quality.
{Project Name} Organizational Chart, Roles and Responsibilities
IT Transformation Strategic Plan and Pilot Project Closure
Presentation transcript:

1 Presenter: Tracy Wessler June 6, 2007 Outsourcing Quality Assurance and Contract Surveillance Activities U.S. Census Bureau Decennial Response Integration System (DRIS)

2 DRIS Contract The U.S. Census Bureau is the primary source of basic statistics about the population and economy of the nation and is best known for the decennial census of population and housing. To help accomplish the 2010 Census, the Government awarded the DRIS contract to the Lockheed Martin team to develop and implement a data capture solution needed to:  Receive, capture, and standardize census data provided by respondents via census forms and telephone agents;  Provide assistance to the public through the telephone; and  Standardize data collected via hand-held computers (HHCs).

3 Overview of Approach DRIS is a high risk and high profile project with firm deadlines. Hence, we need to demonstrate to oversight organizations (e.g. U.S. Government Accountability Office (GAO), Inspector General, etc.) that we have the right processes and project management practices, such as Capability Maturity Models (CMMI) in place to:  Effectively manage the DRIS project;  Monitor the contractor’s (both DRIS and support contractors) work activities; and  Effectively perform internally as a PMO against those processes.

4 Overview of Approach  Process and Product Quality Assurance (PPQA) process area  Involves objectively evaluating performed processes and work products against standards and procedures  Identifying and documenting noncompliance issues  Providing feedback to project staff and managers on QA results  Ensuring that noncompliance issues are addressed  Project Monitoring and Control (PMC) process area  Includes monitoring project activities against the project plan  Monitoring project risks, work products, stakeholder involvement, resources, cost and schedule, etc.  Managing corrective actions to closure Capability Maturity Model Integration (CMMI) – a process improvement model that consist of best practices for the development of products and services.

5 Overview of Approach DRIS Contractor QA SEPG Analysis Gunnison Process Review Dept. of Commerce (GAO) DRIS PMO In an effort to improve existing processes within the organization, the DRIS PMO has engaged in a series of actions to meet project goals and objectives.  Internal QA activities  Contract Surveillance/Technical Monitors  DRIS PMO Surveillance Management Team (SMT)  External QA activities  General Accountability Office (GAO) - oversight  Independent LM QA group  Gunnison Consulting Group, Inc.  Software Engineering Processing Group (SEPG) - outsourced to an independent contractor

6 Internal Quality Assurance and Contract Surveillance Activities

7 DRIS Organizational Chart

8 Contract Surveillance  All staff represented in the organizational chart are considered technical monitors (TM).  Technical Monitors perform tasks such as:  Participating in Integrated Product Teams (IPT).  Reviewing Earned Value (EV) Management Data - Monitoring the contractor’s cost and schedule information to ensure successful completion of the project within budget and on schedule.  Completing monthly TM reports that serve to help TMs evaluate the Contractor’s success in delivering the level of performance agreed to in the contract and provides into the award fee determination process. Technical Monitoring (TM) includes the contract surveillance activities and processes the Government utilizes to monitor and evaluate the Contractor’s performance in fulfillment of DRIS contract requirements.

9 Internal QA Activities The DRIS PMO Surveillance Management Team (SMT) is implementing process improvement activities as part of CMMI efforts. Internal QA SEPG QA Technical Monitoring Process Improvement  Conduct monthly audits to assess the program against internal processes and CMMI ® for Development, v1.2 practices. (Note: The PMO will plan to use the Acquisition model when released this year.)  Membership in the CB’s Decennial IT Software Engineering Processing Group (SEPG).  Monitor DRIS contractor’s QA activities (e.g. participate in audit interviews, meetings, etc.)

10 Internal QA Activities MonthProcess JanuaryCloseout of 2006 audits FebruaryVerification (CMMI) MarchProperty Administration (Ch.14) AprilCommunications Plan (Ch.15) MayDocument Review Process (Ch. 17) JuneRequirements Development (CMMI) JulyPMO metrics (CMMI – MA & QPM) AugustFollow-up Technical Monitoring (Ch. 8 and 9/ CMMI) SeptemberLessons Learned (Ch. 10) OctoberRequirements Management (CMMI) NovemberFollow-up Risk Management Process (Ch. 5/CMMI) DecemberFollow-up Configuration Management (Ch. 3/CMMI) Note: The audits represent processes/plans within the DRIS PMO or a CMMI process area.

11 Independent Quality Assurance Activities

12 DRIS Contractor QA activities  Independent LMTSS (Lockheed Martin Transportation and Security Solutions) QA organization.  Objectively evaluates process and product quality through various methods (e.g. inspections, monthly audits, etc.) to verify compliance with program processes and procedures.  Provides feedback to DRIS Program senior management.  CMMI Level 3 and ISO 9001 audit assessments to be conducted by an independent group in GFY08.

13 SEPG Gap Analysis The Decennial IT Software Engineering Processing Group (SEPG) includes representatives from 6 mission critical CB program areas to communicate and implement business goals and process improvement initiatives within the Decennial IT organization.

14 SEPG Gap Analysis  In Fall of 2006, the SEPG utilized an independent organization to identify and analyze existing processes within each program area.  Consultants assessed each program area against seven (7) CMMI ® process areas using SEI ’ s CMMI ® SE/SW v1.1 model.  Organizational Process Focus (OPF)  Requirements Management (REQM)  Project Planning (PP)  Project Monitoring and Control (PMC)  Measurement and Analysis (MA)  Process and Product Quality Assurance (PPQA)  Risk Management (RSKM)  Identified best practices, strengths, and areas of improvement (e.g. Best Practices - Risk Management program and TM activities)  DRIS PMO have addressed areas cited for process improvement (e.g. Development of a PMO Metrics Plan).

15 PMO Process Review  QA of the DRIS PMO QA (Part 1)  Early in 2006, conducted a review of the PMO QA processes implemented in Phase I of DRIS contract.  Analyzed the Surveillance Management Team audit process across four major work areas. (Audit Planning, Audit Examination, Audit Reporting, and Audit Follow-up)  DRIS PMO have addressed areas cited for minor modifications (e.g. Updated PMO Contract Surveillance documents).  Conducted a DRIS PMO Lessons Learned review (Part 2) with Senior staff and external stakeholders.  Plan to conduct a follow-up in Summer of The DRIS PMO utilized an independent contractor in an effort to continue process improvement.

16 Future Plans  DRIS PMO to continue with internal audit activities through closeout of DRIS contract.  Gunnison Consulting Group, Inc. to conduct a follow-up assessment in June of 2007 and will conduct audits annually thereafter.  DRIS contractor will continue conducting internal audits and also participate in CMMI Level 3 and ISO 9001 audit assessments in GFY08. GAO Gunnison Review SEPG Analysis Contractor QA PMO QA Process Improvement  DRIS PMO to reassess recommendations implemented from SEPG Gap Analysis and Gunnison process review prior to start of Phase II.

17