© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 1 Affordability Engineering for Better Alternative Selection and.

Slides:



Advertisements
Similar presentations
MANAGING INFORMATION TECHNOLOGY 7th EDITION
Advertisements

Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
5-1 DoD Risk Management Policies and Procedures. 5-2 Risk Assessment and Management (DoD ) “Program Managers and other acquisition managers shall.
Program Management Overview (An Introduction)
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to Cost management
Strategic Financial Decision-Making Framework
The program work breakdown structure (WBS) establishes the essential
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
What is Business Analysis Planning & Monitoring?
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
The Evergreen, Background, Methodology and IT Service Management Model
Bill Golaz Greg Niemann October 22, 2013 Operations Analysis Workshop “Operational Analysis Measures for Program Start Up”
Sustainability and Total Cost of Ownership Strategies for Higher Education.
Continual Service Improvement Process
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Change Management “Getting from where you are, to where you want to be”
© 2012 PRICE Systems, LLC. All Rights Reserved. Optimize tomorrow today. ® Understanding and Measuring the Impact of Design and Systems Engineering Decisions.
“WHY AFFORDABILITY IS A SYSTEMS ENGINEERING METRIC” Quentin Redman Director – Solutions Architect PRICE Systems L.L.C.
Joseph “Colt” Murphy Senior Financial Analyst ODASD Materiel Readiness 8 Dec 2010 OSD Product Support BCA Guidebook.
Environment, Safety and Occupational Health (ESOH) in the DoD Business Management Modernization Program April 2005 John Coho I&E Business Transformation.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
The Challenge of IT-Business Alignment
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Chapter 2 Process: A Generic View
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
1 Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability,
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
Welcome to Session 3 – Project Management Process Overview
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
FEASIBILITY STUDY.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
Pay for Performance A strategic approach to design Dermot Hand August 2012.
Kathy Corbiere Service Delivery and Performance Commission
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Select Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Serving IT up with ITIL By Thane Price. IT is the laboratory’s pit crew  Goal : Make technology transparent while accomplishing valuable internal customer.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Attend|Learn|Grow Push Your Professional Growth to the Next Level
DoD Template for Application of TLCSM and PBL
Strategic Information Systems Planning
LOGISTICS ACQUISITION, AN EMPHASIS ON PLANNING FOR PERFORMANCE
Chapter 13: Setting a Direction for Information Resources
Purchasing supplies at CERN
(Additional materials)
Building a Business Case for Systems Engineering
SPECTRUM STRATEGY & VISION
Presentation transcript:

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 1 Affordability Engineering for Better Alternative Selection and Risk Reduction” Bob Koury, Senior Solutions Architect Marlena McWilliams, Cost Analyst ICEAA June Denver

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 2 The Case For Affordability Engineering “Cost, schedule, and performance problems in the Department of Defense’s (DOD) weapon system programs are serious. Recently, we reported that the department’s 2008 portfolio of 96 major defense acquisition programs experienced cost growth of $296 billion, experienced an average delay in delivering initial capabilities of 22 months, and have delivered fewer quantities and capabilities to the warfighter than originally planned. 1” Reasons for these problems included 2 :  Most programs did not conduct a robust Assessment of Alternatives (AOA)  Many AOAs did not adequately assess risks for alternatives  Choosing an alternative too early and conducting AOAs under compressed time frames and without effective guidance limit the scope and quality of AOAs.  DOD needs the ability to ensure that its [acquisition] policy changes are consistently implemented and reflected in decisions on individual weapon system programs Notes: 1- GAO, Defense Acquisitions: Assessments of Selected Weapon Programs, GAO SP (Washington, D.C.: Mar. 30, 2009). 2- GAO, Defense Acquisitions: Many Analyses of Alternatives Have Not Provided a Robust Assessment of Weapon System Options, GAO (Washington, D.C.: Sep 24, 2009)

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 3 Why Affordability is an SE Process  These techniques enable analysts to forecast expected affordability of alternative technologies and systems  They allow the measurement of improvement in affordability of a given system  The affordability trade space is composed of a relational set of attributes that are contextually sensitive  Once this set is bounded, the need arises for an implicit comparison to other systems, sub-systems and components.  The problem may be embedded in how systems are designed, how they are governed, and how they are evolved. ( See Next slide ) Affordability can be improved, measured and predicted

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 4 Affordability Is A Systems Engineering Metric Affordability Analysis is an integral part of the system engineering approach. Closely coupled to understanding technical issues, it seeks to use a common set of methods. Analysis can focus on the subsystem, system, and mission levels and is performed for the entire program life cycle. Typical products of an affordability analysis include cost- effectiveness analyses, risk analyses, and total ownership cost estimates. An affordability analysis synthesizes information from three basic areas: mission analysis, technical analysis, and cost analysis.”

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 5 Engineering Affordability Into Our Systems  There is no formal process or technique called Affordability Engineering but it is an inherent attribute of affordability analysis  Engineering affordability into systems and services is a team sport requiring cooperation of: – Program Managers – Systems Engineers – Cost Estimators  Engineering affordability can be an outcome of Affordability Analysis using techniques such as: – Value Engineering (VE) – Design To Cost (DTC) – Cost as an Independent Variable (CAIV) Affordability Engineering is An Attitude Not A Technique

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 6 How Affordability is Utilized  Determine the customer concerns and understand those concerns  Explicit – States cost goals or operating budgets  Implicit – Inherent Relationship between performance and Cost  Compliance – Contract contains a limited budget/funding  Unit Production – Average Unit Production Cost (AUPC) goals  Total Ownership Costs (TOC)-Reduced Total Ownership Costs (RTOC)- Life Cycle Costs (LCC) must be some determine percent (normally 30%) less than the replaced system

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 7 Affordability Trade-Off Analysis  Cost Analysis – Economic consequences of an alternative selection – Cost trade-off data provides a means to value capability (performance), dependability, suitability (requirements), and cost-effectiveness  Effectiveness Analysis – Measures the extent to which a system meets mission objectives  Risk / Opportunity Analysis – Measure uncertainity of each alternative and their impacts in terms of cost, performance, schedule – Measures the capacity for the system to evolve  Benefits Analysis –Measures the value decision makers place on prioritized capabilities System Configuration 1 (Alternative 1) System Configuration 2 (Alternative 2) Cost Effectiveness Risk (Opportunity) “Trade Off Analyses provide a recommended course of action with impact to decision makers for each set of alternative examined. The impact assessment is given in terms of cost, schedule, performance and risk/opportunity” [Note 1] Source: Naval Systems Engineering Guide – July 2004 (section page 104)

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 8 Considerations of an Affordability Trade Space 23rd Annual INCOSE International Symposium - Philadelphia, PA – June, 2013

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 9 Goal of Affordability Engineering 23rd Annual INCOSE International Symposium - Philadelphia, PA – June, 2013 Tuttle & Bobinis (2013) “Specifying Affordability”

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 10 Affordability Analysis Workflow Optimize tomorrow today. ®

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 11 3 Simple Rules For Engineering Affordability  A Life Cycle view is used for all decisions  Requirements are traded and set with a balance of cost, risk, schedule, and performance  Risk is quantified and managed by the program

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 12 A Life Cycle view is used for all decision  Emphasis on Cost Objectives and Affordability  Customer-funding profile and life cycle costs  Contractor-development and production costs  User- only necessary and sufficient requirements  Cost/benefit  Development  Production  O & S, infrastructure costs  Growth & improvements  Reliability  Robust design  Supportability

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 13 Requirements are traded and set with a balance of cost, risk, schedule, and performance.  Use stakeholder values to make balancing decisions  Performance-based specifications  Cost/schedule/performance tradeoffs [common trade study process]  Requirements provide adequate utility to User (No Gold Plating)  Design meets goals set for…producibility, other “–ilities” Decision Makers Desire

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 14 Risk is quantified and managed by the program  CPIPT (cost-performance IPT; User, Customer, Contractor)  AFFORDABILITY/CAIV Plan and strategy  Risk mitigation plans informed by cost targets  Organizational structure  Incentives  Cost targets  Cost reduction initiatives  KPP/TPM  IMP/IMS  Earned Value  Keep a reserve

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 15 Summary Performance Schedule R i sk Cost Thresholds Cost Goals Trade Space Cost Upper Affordability Limit Price to Win Optimum Solution Best Bang for the $$ ?$$? Cost Targets ? Mission Needs Operational Requirements Technical Requirements Program Strategies Customer ILS LCC Your mission is to make a product that meets your customer’s needs and is affordable What the customer Would like to pay Focus On Best Achievable Customer Value

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 16 © 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence Additional Questions & Next Steps ICEAA June Denver Price Systems L.L.C. Senior Solutions Architect; US Army Programs Commerce Parkway; Suite A Mount Laurel NJ (856)

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 17 Definitions  Affordabillty 1 The degree to which the life-cycle cost of the resources being allocated on a capability in relation to other alternative uses of those resources reflects (i) the importance, urgency, and satisfaction of mission, strategic investment, and organizational needs, and (ii) a prudent balance of performance, cost, and schedule constraints consistent with the time phased availability of budgeted resources.  Affordability Analysis A process and assessment that supports resource decision-making which identifies and quantifies stakeholders’ performance expectations, associates value to those expectations, and measures the life-cycle cost of a set of alternatives in relations to the opportunity costs of alternative resourcing actions or plan. Notes: 1 - BusinessDictonary.com

© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 18 Key Techniques  Value Engineering 1 Value Engineering is an organized/systematic approach that analyzes the functions of systems, equipment, facilities, services, and supplies to ensure they achieve their essential functions at the lowest life-cycle cost consistent with required performance, reliability, quality, and safety  Design to Cost  Design to Cost (DTC) is an engineering discipline that meets customer cost requirements through an iterative process that balances cost, performance, and supportability while eliminating non-value added activity. DTC is an inherent element of Integrated Product Development (IPD) and is implemented within the common Integrated Product Development System (IPDS).  Cost as an Independent Variable (CAIV) – Cost as an Independent Variable (CAIV) is a management discipline. The DOD CAIV policy sets cost as a military requirement and requires that programs establish aggressive, realistic cost objectives and to manage to obtain those objectives. Cost objectives must balance mission needs with projected out-year resources. CAIV seeks to find the optimal balance between cost, performance, risk, and schedule Notes: 1 - DoD Value Engineering: A Guidebook of Best Practices and Tools. Retrieved May 10, 2012, from Defense Acquisition University: