Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.

Slides:



Advertisements
Similar presentations
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
Advertisements

PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
X Facilities Energy Management Alexis Wong, Kiran Singh, Quan Luu, Sam Hein ITEC 200- ITR 2014.
January 12, 2012 Commissioning Services. June 13, 2011  Genesis Commissioning Capabilities  What is Commissioning (Cx)/Retro-Commissioning (RCx)? 
A World of Solutions Duke Energy Strategic Energy Management Planning (SEMP).
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Building Commissioning
Cleaner Production Assessment (Chapter 4)
Toward a Sustainable Campus. Outline A. Global Sustainability Movement in Higher Education B. Resources C. What can be done? D. “Toward a Sustainable.
Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Clean Facilities… Sustainable Solutions Local Touch… National Reach.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
International Newspaper Group 2008 Gannett’s Green Campaign.
Building Commissioning/Energy Performance Contracting.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Session 5 Introduction to the elements of commercial energy auditing.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
University of Central Florida David Norvell PE, LEED AP December 15,
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Commissioning HVAC Systems: Lessons learned throughout
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Staying Ahead of the Curve IFM Outsourcing pushes the envelope on energy savings Chris Pesek, Managing Director Integrated Facilities Management, JLL.
A Simple Path to Sustainability Presented by:. Steven P. Driver, Ph.D. Genzyme Energy Program Manager February
Energy Solutions for Business Owners Presented by: [Put your name here] Welcome to... Your Logo Here.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fort Stanwix National Monument Energy Audit Contract
Sean Weber Energy Engineer
Industrial Assessment Center Database
Optimization for Airport Facilities
Improving Energy Reliability & Performance
2018 Retro-Commissioning (RCx) Program
Calibrated Energy Models: One New Change
Presentation transcript:

Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented By: Robert S. Bucey, PE, CEM, LEED AP

What is Retro-Commissioning?  Systematic investigation process for improving and optimizing the operation and maintenance of buildings  Primarily focuses on energy-using equipment and low-cost improvements rather than expensive capital-intensive retrofit measures  Involves detailed study of building system operation  Faults in building systems are identified for resolution  Control changes may be recommended that increase energy efficiency  Economic analysis that calculates energy savings  Follow-up required to verify that measures have been correctly implemented and have held up over time  Can resolve problems that occurred during design or construction, or that have developed throughout the building’s life

“Have you seen this?”

Why Retro-Commission Now?  Occupant comfort:  Indoor air quality concerns  Reduce employee absenteeism  Reduce tenant turnover  Improve employee productivity  Improve thermal comfort  Protect or enhance property condition:  Protect against future liability  Increased asset value of income-producing properties  Fewer warranty claims

Why Retro-Commission Now?  Improved operation:  Reduced maintenance calls  Train building technicians on RCx process  Create system-level benchmark to facilitate efficient monitoring of systems  Provide single document resource for O&M staff  Reduce operating cost / energy consumption:  Problems never identified during initial building start-up  Systematic problems in building operation  Environmental problems  Excessive equipment run times due to changes in occupancy or space use  Malfunctioning equipment or sensors  Control optimization issues  Extend equipment life

Why Retro-Commission Now? Cost avoidance !!!!!!

Basic Steps In The RCx Process  Document review  Building walk through  Organize utility data history  Assess BAS and control system effectiveness  Develop detailed work plan  Establish current system performance  Develop and implement functional performance test procedures  Operator training program  RCx manual, lessons learned and future RCx initiatives

Retro-Commissioning Process  Planning  Select facility – prioritize groups of buildings  Identify project objective (Performance/Energy/Both)  Document performance requirements  Perform initial site walk-through  Establish energy benchmark  Identify potential energy conservation measures  Develop detailed work plan  Assemble team & define responsibilities

Retro-Commissioning Process

 Investigation  Detailed review available documentation  Diagnostic monitoring of building automation system  Conduct functional performance testing  Make “simple” modifications/repairs  Document results  Make recommendations for improvement  Major repairs/modifications  Update energy conservation measures

Retro-Commissioning Process Fig. 1 Temperature data logger deployed Fig. 2 Power data logger deployed Fig. 3 Sample BAS Diaplay Fig. 4 Occupancy and photo sensor results for Operating Room

Retro-Commissioning Process

 Turnover  Develop scope of work documentation for improvements  Provide operator training  Compile retro-commissioning manual  Share lessons learned  Develop ongoing commissioning plan

Where are the RCx Opportunities? (Examples)  Simultaneous heating and cooling  BAS programming vs. actual operation  Correct and most efficient air damper sequencing  Chilled water bypasses and leaks  Corroded condenser coils  Incorrect head pressure control and hot gas bypass connections  Poor equipment access  Equipment not responding to control system  Temperature and humidity sensors out of calibration  Control sequence not operating correctly  Electric duct heaters with incorrect wiring  Incorrect cooling load calculations

Some RCx Lessons Learned  Inadequate building documentation  Access to building automation system data  Systems “never ran right from day one”  Zone level adjustments made but never tracked  Changes made during construction  “Improving Performance” may not always reduce energy consumption  Set expectations up front  Need buy in from all parties!

Industry Results  Our experience: 15% to 25% savings in energy alone  GSA ARRA Program: Identified 2,794 energy conservation measures in 50 buildings  Study of 643 buildings: over 10,000 energy-related problems, resulting in 16% median whole-building energy savings, with payback of 1.1 years

Industry Results TargetLocationEnergy savingsProject cost ($/sf)Payback time (years) Local government buildings California14.3% source energy, 11% electricity, 34% gas Class A officesConnecticut7.3% electricity Mixed commercialColorado7% electricity University buildings California10% total source SupermarketsCentral California12.1% electricity Mixed commercialOregon10-15% electricity Mixed commercial and educational California % electricity Source: Evan Mills. 2009, "Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse- gas Emissions"

Industry Results Number of measures applied Type of deficiency solution Source: Evan Mills. 2009, "Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse- gas Emissions"

1 ROI Expectations Source: Evan Mills. 2009, "Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse- gas Emissions"

1 ROI Expectations Source: Evan Mills. 2009, "Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse- gas Emissions"

Options To Implement An RCx Program  As an element of an overall energy plan  Coordinate with predictive maintenance, facility condition assessments, capital R&R planning  Combine with overall strategy to reduce deferred maintenance  Seed program with annual funding to implement “low hanging fruit” initiatives; invest savings in further energy conservation measure implementation  Canvas available rebates and invest in ECM implementation  Energy services contract vehicle

Questions Thank you for your attention