Charge: The BCTCC is charged with maintaining and advancing the Blue Clay Bike Park Mountain Bike Trails according to the provisions of the MOU between.

Slides:



Advertisements
Similar presentations
Bicycle Safety Second Grade Mrs. Meadows. California State Standards HealthSecond Grade, Standard 3 –The student will understand and demonstrate behaviors.
Advertisements

Aspen Falls Park Development Land Acquisition for Parks One Minute to Start.
EQUESTRIAN SKILLS PARK. Vision Statement The Equestrian Skills Park (official name pending) will be a dynamic and fun venue that will inspire equestrians.
Safety Issues Facing Recreational Bike Riders Jillian Woolmer, on behalf of Gosnells Bicycle User Group (GO BUG) RAC Cycling Safety Forum, 14 May 2011.
National Certification Program Exclusively for those in Public Safety Certified Rider Class.
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Mashpee Land Stewards Program. Goals of the Mashpee Conservation Department To protect our water resources, plant and wildlife habitat and to preserve.
Customising Wick Trenches to Extreme Victorian Conditions Callum Morrison Benalla Rural City Council.
Chapter 9 Water Erosion and Deposition
Chapter 2 Fresh Water Section 1 Streams and Rivers
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
“ Development that meets the needs of the present without compromising the ability of future generations to meet their own needs “ ~Bruntland Commission~
SPTC – JPA RAIL/TRAIL CORRIDOR Presented by John Segerdell, CEO Sacramento-Placerville Transportation Corridor Joint Powers Authority (SPTC-JPA)
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
We start at Stars and Stripes Park Hefner Lake, South by ball diamonds– here we have a group gathering, instructions, distribute maps. Head.
CHARACTERISTICS OF RUNOFF
Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan.
“Man’s heart away from Nature becomes hard.” -Standing Bear.
Design of Open Channels and Culverts
Training of Trainers Site Specificity of Rain Water Harvesting Workshop Conducted By Eureka Forbes Institute of Environment For Maharashtra Centre for.
09/03/2004/Apinya/KMUTTarc354slope analysis031 TOPOGRAPHY earth shape and earthwork Interpreting the topographic contour plan Slope analysis Grading grading.
Testing the Terrain Off-road Cycling Pilot Project in Wirth Park.
Bike MS Team Safety Presentation 2015 Bay to Bay Bike MS Tour.
United States Air Force: Survival Objective: Know how to survive in situations where your safety and life depends on your decisions. Know the three basic.
This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be.
Colorado Division of Reclamation, Mining & Safety Idarado Natural Resource Damage Remediation Project CDRMS Office Locations Denver Grand.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
< This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of.
Flow Simulation in TINs Drainage Queries in TINs: from local to global and back again S. Yu, M. van Kreveld, and J. Snoeylink.
Trail Standards March Trail Standards What they are Why we are working on them How they will affect you How we will establish them What will the.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
Banking 101.  What is the purpose of a bank?  What bank do I choose?  What type of account/s do I open?  What are the most important factors to consider.
Sustainable Trail Building Techniques for Mountain Bike Trails.
Trail Repair Marys Peak North Ridge Trail. The trail is split by this stump and too steep for safety during wet weather. I propose taking it out and lowering.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
 Service-Learning is a method through which citizenship, academic subjects, skills, and values are taught.  There are three components of effective.
What is Erosion and Sedimentation ? Bill Laflamme CPESC, Office of the Commissioner MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air,
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
 SIGN, SIGNALS, & ROADWAY MARKINGS Do Now - Create a list with as many different road signs you are able to think of. What does each sign tell you? Classify.
Kindergarten Sight Words. the 1 of 2 and 3 a 4.
Snowboarding Key Terms The most important terms you need to know to participate in this discourse community.
Second Grade Dolch Words egreay. a and away big.
NY-NJ Trail Conference West Hudson North accomplishments for 2015 Black Rock Forest Minnewaska State Park Preserve Schunemunk State Park Storm King State.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Irrigation Efficiency or IE Water applied is never 100% beneficially used. There is always some loss Evaporation from soil and leaf surface Evaporation.
Local Government Services and Revenue Chapter 12 Section 2.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
 U.S. Consumer Product Safety Commission  Public Playground Safety Handbook 325  New edition adopted in November 2010  More consistent with ASTM F1487.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
BY LILLY STEPHENSON Sidmouth training clinic. What is it? A horse riding instructing business, where instructors as well as myself are hired to teach.
Unit 3 Section B ( 1a—self check ) train plane car motorbike bus subway ship bike taxi boat.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Arizona Forward Update
How to Sign A Trail Accurately
General Road Construction Information
Successful Management of Multiple Use Forest Trails
Jefferson County SA Red Rocks Site Approval
General Road Construction Information
About Austin Ridge Riders
Multi-Use Trail Proposal
Chapter 9 Water Erosion and Deposition
Ms. DeLeon’s Sample Story
Digitization of Reimer’s Ranch and Muleshoe Bend
Accessible Trails The Basics.
Bike Safety Before you ride If on the road Put on your helmet!!!!!
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

Charge: The BCTCC is charged with maintaining and advancing the Blue Clay Bike Park Mountain Bike Trails according to the provisions of the MOU between Cape Fear SORBA and New Hanover County.

MOU: The COUNTY may terminate this agreement for a breach by CFS of the terms and conditions hereof. The COUNTY may immediately terminate this contract and close the park for conditions posing public health or safety concerns.

Issues: Bridges 8 complete 1 rework pending (beginner) 1 replacement (inner loop bypass) Crossovers 4 replacements

Issues: $ for Material County Funding CFS Funding Grants other?

Allen McCauley I just ran the 2010 NYC marathon for a local charity in town Hope from Helen. This charity was formed by my friend Tony Butler who wanted to raise money for his mothers cancer treatments. Mrs. Helen Butler passed several years ago after a long hard battle. Now the charity raises money in her memory and donates to great local causes. Each of the five runners was given the opportunity to pick a charity or non profit to give money too. So on behalf of Hope from Helen I picked CFSORBA. I can send a check for $500. Thanks for all your hard work

IMBA Guidelines Two Critical Trailbuilding Tips 1) Avoid the Fall Line Fall-line trails usually follow the shortest route down a hill - the same path that water flows. The problem with fall-line trails is that they focus water down their length. The speeding water strips the trail of soil, exposing roots, creating gullies, and scarring the environment. 2) Avoid Flat Areas Flat terrain lures many trailbuilders with the initial ease of trail construction. However, if a trail is not located on a slope, there is the potential for the trail to become a collection basin for water. The trail tread must always be slightly higher than the ground on at least one side of it so that water can drain properly.

Issues: Beginner Trail – approximately 1.5 miles Building on Flat ground- 5 percent grade compaction – drainage, roots route signage Trail width - IMBA Trail Rating System Green (easy) 36” or more Blue (more difficult) 24” or more Black Diamond (Very Difficult) 12” or more

Issues: Inner Loop compaction – drainage, roots erosion – mounds, Daniel’s ridge roots as Technical Trail Features Flow

Issues: Two ditch crossings on the West side of the trail after reentering the woods after the power lines. 1)First board crossing – OK? 2)Second board crossing – reroute or repair?

Issues: Other areas of the trail? Bryan’s mounds? Technical mound after Bryan’s mounds. Other?

Issues: Open/Closed Sign Liability with Open Sign Who makes decision? Timeliness? Trail Section Closed Signs If no sign how to keep riders from riding when the trail it too wet?

Issues: Parking for events Portable Bathroom Kiosk

Issues: Pump Track BMX gap jump How to stop people from riding in wet conditions Ownership?

Wish List: Technical Trail Features picnic shelter men/women bath with changing area permanent storage bike wash water fountain area for scoring/registration/awards

Ownership of trail segments by Work Groups Who wants what? Process of working Who can work on the trail? When can I work on the trail?