Overview of PLS/PLS-II Control System Jin Won Lee Beam Operation Team Accelerator Division Pohang Light Source Korea 2009.07.26.

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

CLS Machine Status Displays System Analyst - Controls Canadian Light Source Inc. web: Perimeter.
SPEAR Upgrade – EPICS Status
Linux IOC Operations at NSTX - An Overview P. Sichta 28Mar2005.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
Status of Activities Related to EPICS and Accelerator Control in China Presented by Guobao Shen KEKB Control Group EPICS Collaboration RICOTTI Tokai, 8.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Controls & Monitoring Overview J. Leaver 03/06/2009.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
Connecting LabVIEW to EPICS network
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Interfacing to the CLS Control System Canadian Light Source University of Saskatchewan.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Control System Pravin Fatnani Accelerator Control Section IIFC Meeting RRCAT Presentation Feb 2015.
“Implementation and Initial Commissioning of KSTAR Integrated Control System,” Mikyung Park NFRC, KOREA The 6 th IAEA Technical Meeting,
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Experience of Developing BEPCII Control System
Report Technical Director Storage-Ring-Installation Completed
SESAME Control System Status
Presented by Li Gang Accelerator Control Group
Status of the ASTRID2 facility
Laboratorio per dottorandi 2017 Particle Accelerators Control System
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
SESAME Control System Status
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Machine Operation and Progresses in SSRF
Operation Progress and Upgrade in SSRF
EPICS: Experimental Physics and Industrial Control System
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Overview of PLS/PLS-II Control System Jin Won Lee Beam Operation Team Accelerator Division Pohang Light Source Korea

Overview of PLS Control System

Gallery PLS Linac Machine Parameters Tunnel Linac(Full Energy Injector) Beam energy(GeV) 2.5 No. of accelerator columns 44 Frequency(Mhz) Number of Klystrons 12 Klystron power(MW) 80 Total length(m) ~160

PLS Storage Ring Machine Parameters  Beam Energy2.5GeV  Beam Current200mA  LatticeTBA  Superperiods12  Circumference280 m  Emittance18.9 nm-rad  Tune14.28 / 8.18  RF Frequency500 MHz Control Shed Tunnel

PLS Control System History : Past, Current, Future Operator Interface - Workstation - Motif/X-Windows Subsystem Control - VME/OS-9 Device Control - VME - OS-9 Ethernet MIL-1553B Operator Interface - Workstation/PC - EDM/MEDM -CA Client Input/Output Control - VME, IPC - vxWorks, Linux -CA Server Ethernet  2003 – Current  Standard EPICS  Very stable  1995 – 2002  Lab-made system  Unstable Optimize and Tune IOCs Develop I/O Control for new devices Upgrade of Input/Output Control System Optimize and Tune OPI displays Reinforce Machine Analysis and Study Systems Renovate Control Room Upgrade of Control Room System  PLS-II (2009 – 2011 )  Standard EPICS Ethernet Upgraded Ethernet

Operation Statistics of PLS Control System Number (80) Time (8748 min) Fault status in 2008 User Service  Very stable and reliable

Main Control Room : Hardware  Large Machine Status Display Units : 4 ea  Machine Monitoring and Operation for Operators - Solaris Workstation : 6 ea - X-Terminal : 6 ea - Linux PC : 2 ea - Windows PC : 1 ea  Data Servers - Database(ORACLE) server - FTP server - IOC Boot server - IOC Web server - Gateway servers

Main Control Room Computers : Software  Graphic Display Panels for Machine Operation : ~14 displays - Display for Linac Modulator/Microwave control and Monitoring - Display for Linac MPS control and monitoring - Display for Linac beam diagnostics control and monitoring - Display for Storage Ring RF control and monitoring - Display for Storage Ring MPS control and monitoring - Display for Storage Ring Injection control and monitoring - Display for Storage Ring ID control and monitoring - Display for Storage Ring beam orbit monitoring - Display for Storage Ring orbit feedback control and monitoring - Display for Timing control and monitoring  Machine Analysis and Study Software for Physicists - LOCO, Elegant, BBA, SDDS, Matlab, MML

Main Control Room

Computer Room

Graphic Display for Machine Operation  Display for Linac Modulator Control and monitoring

Graphic Displays for Machine Operation  Display for Linac MPS Control

Graphic Displays for Machine Operation  Display for Storage Ring MPS status monitoring

Graphic Displays for Machine Operation  Display for Storage Ring beam orbit monitoring

Graphic Displays for Machine Operation  Display for Storage Ring RF control

Graphic Displays for Machine Operation  Display for Storage Ring Global Orbit Feedback control

Device Control System for Linac EPICS IOCs - BPM - BPRM - BLM Beam Diagnostics Subsystem EPICS IOCs - Modulator - Klystron - Micrwave Modulator Klystron Subsystem EPICS IOCs - Magnet Power Supplies MPS Subsystm EPICS IOCs - Pump - Guage - Gate Valve Vacuum Subsystem  4 Subsystems for the Linac Device Control  EPICS IOCs for Input/Output control and monitoring

IOC Specifications for the Linac Device Control  Number of IOCs : 11  Number of PVs : About 3,000  H/W : VME, Industrial PC, Embedded  S/W : vxWorks, Linux, Windows, RTEMS Machine Components IOC Hardware IOC OS Number of IOCs Number of PVs LinacMPS SystemIndustrial PCLinux, RTEMS Beam diagnostics System VME, Industrial PC vxWorks, Linux 4500 MK/MW SystemIndustrial PCLinux1500 Vacuum SystemIndustrial PCLinux2500 Auxiliary SystemIndustrial PCLinux1500 Total11About 3,000

Device Control for Linac MPS (Magnet Power Supplies)   RTEMS Embedded EPICS IOC Controller  Industrial Linux PC for Gateway IOC About 100 power supplies for various magnets and solenoids in the linac

Device Control for Linac MPS (Magnet Power Supplies) Switching Network Hub Gateway PC (Linux) MPS With Embedded EPICS Controller (RTEMS)

Device Control for Linac Modulator/Klystron  12 Modulators/Klystrons  12 Industrial PC(Windows) Controller  Linux Industrial PC Gateway IOC  Ethernet(Modbus) CA Clients IPC Controller#1 Linux PC_IOC IPC Controller #12 Control Ethernet Ethernet(ModBus)) M/K#1M/K#12 IPC Controller Modbus Ethernet Linux IPC-IOC CA clients Control Ethernet

Device Control for the Storage Ring EPICS IOCs - E-BPM - P-BPM - DCCT - Screen - Scraper Beam Diagnostics Control EPICS IOCs - LLRF - Klystron - Modulator - Circulator - Cavity - Master Oscillator - Vacuum Guage - Temp. RF System Control EPICS IOCs - Bending - Q1 ~Q6 - Skew - H-Corrector - V-Corrector MPS System Control EPICS IOCs - Pump - Guage - Gate Valve - Chamber Temp. Vacuum System Control  4 Subsystems for the Storage Ring Device Control  EPICS IOCs for Input/Output control and monitoring

IOC Specifications for the Storage Ring Device Control  Number of IOCs : 29  Number of PVs : About 7,000  H/W : VME, Industrial PC  S/W : vxWorks, Linux, Windows Machine Components IOC Hardware IOC OS IOC Number PV Number SRBeam Diagnostics VMEvxWorks 12 ea1,500 RF SystemVMEvxWorks 1 ea1,500 MPS SystemVMEvxWorks, Linux, Windows 15 ea2,000 Vacuum System Industrial PCLinux 1 ea2,000 Total 29 ea 7,000

Local Control Sheds  12 local control sheds around the storage ring

Device Control for Beam Position Monitors  Number of IOC : 12 ea  Based on VME and vxWorks BPM Processing Modules (Bergoz module) VME EPICS IOC

Device Control for Corrector Magnet Power Supplies  Number of IOC : 12 ea  Based on VME and vxWorks VME EPICS IOC

Device Control for RF system  Number of IOC : 1 ea  Based on VME and vxWorks VME EPICS IOC Low-level RF System

Device Control for Timing System  Number of IOC: 1 ea  Based on VME and vxWorks VME EPICS IOC Timing Hardware

Status of PLS-II Control Design

PLS-II Upgrade Project Summary ItemYearTotal Storage Ring Linac Beamline Utility Total  Project Period: 3 years (2009 – 2011)  Total Budget: US 100 M$  Yearly Budget: in US M$ (1U$ = 1000 Won)

PLS-II Upgrade Project Summary ItemYearTotal Control  Total Control Budget: US 2.3 M$ (1U$=1000 Won)  Yearly Budget: in US M$

Major Goals of the PLS-II Upgrade

Schedule of PLS-II Control Item Y2009Y2010Y2011 1Q1Q 2Q2Q 3Q3Q 4Q4Q 1Q1Q 2Q2Q 3Q3Q 4Q4Q 1Q1Q 2Q2Q 3Q3Q 4Q4Q 1. CDR, TDR 2. Development 3. Procurement 4. Dismantlement/ Installation 5. Integration Test 6. Beam Commissioning

Designed Components of PLS-II Control Device Control System LINAC Device Control System Information Display Machine Operation System Machine Analysis and Study System Data Management System Control Display LOCO, BBA SDDS, ADT, Elegant Database Server Gateway Server NFS /Boot Server Web/SMS Server Matlab, MML Monitor Display Storage Ring Device Control System Beamline Device Control System Network System Timing System Machine Interlock System

Open and Standard Technologies for the PLS-II Control  Hardware : - Machine Operation H/W : PC, Workstation - I/O Control H/W : VME, CompactPCI, Industrial PC  Software : - Machine Operation S/W : MEDM, EDM, ALH, Archiver, StripTool - Machine Study S/W : LOCO, BBA, MML, Matlab, SDDS, Elegant - OS : Solaris, Linux, Windows, vxWorks, RTEMS  Network : - Control Network : Etehrenet(TCP/IP) - Fieldbus : Modbus, CANbus, RS485 - Fast Data Network : Reflective Memory Network

Main Control Room Upgrade for the PLS-II Machine Monitoring Systems LINAC MPS/E-Gun Control LINAC MK MIS SR BPM/Orbit LINAC VAC/COOL Environ SR RF SR VAC LINAC BPM LINAC Temp SR Temp/Cool Radiation Safety LINAC BPRM Control LINAC MK/IPA Control Top-Up Control SR BPM/M PS Control RF Mon/ Control Feedback Control Timing Event Machine Operation Systems Machine Analysis & Study Systems Windows Visual c/c++ LabView Unix Workstation LinuxMATLABEPICS Information & Status Display Wall ( LCD Monitor) LCD #1 LCD #2 LCD #3 LCD #4 LCD #5 LCD #6

3D View of Main Control Room for the PLS-II

Network Upgrade for the PLS-II  Control Network, Public Network, Research Network  Ethernet with 1 Giga-bps Bandwidth  Firewall Security

BPM system upgrade using Digital BPM for the PLS-II  First-turn Orbit Measurement  Turn-by-Turn Orbit Measurement  Fast Acquisition Rate (10KHz)  Submicron Stability First-turns orbit data Turn-by-turn data SA(10Hz) orbit data FA(10KHz) orbit data Control EthernetGiga Ethernet BPM Pick-ups (A,B,C,D)

Timing system upgrade using event modules for the PLS-II  Synchronization of Linac (2856MHz) and Storage Ring (500 Mhz) RF Frequency  Event-based Trigger system (Jitter < 50ps) - VME EPICS IOC - Commercial event VME modules :. VME EVG-230. VME EVR-230 EVG Fan-out E-Gun, Modulator, Kicker, BPM, C-MPS EVR Thank you very much for your kind attention!