Load Shed Service for Import Information Session Market Services April 17, 2014.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

Pump Load as Spinning Reserve David Lemmons Senior Manager, Market Operations August 21, 2012.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
ERCOT Under Frequency Load Shed Testing
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
Sanctioning Guidelines Carm Phillips Compliance and Dispute Resolution Division Market Assessment and Compliance Division.
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Design of Drilling Contracts – Economic Incentives and Contractor’s Focus on HSE Presented by Anders Toft SPE International Conference on Health, Safety.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Reliable Power Reliable Markets Reliable People Market Services Operating Reserve Redesign Project April 28, 2008 Working Group Session.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Market Operations and Development (MOD) System Upgrade Project Customer Information Session #2 April 9, 2010.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Distributed Generation Registration June 30, 2008.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 20, 2016.
Availability Assessment Hours for SCP/RAAIM Portfolio Management Commercial Policy, Planning & Compliance May 18, 2016.
Renewable Energy Challenges: System Stability
California Product Offerings
Market Continuity Update to TAC Joel Mickey
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Current FRRS Language & Explanation of Posted Data
CUSC Panel – 19th July 2016 Binoy dharsi
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
UFLS Workshop Discussion #3
PJM Load Product (Consumption Product)
Larry Bugh ECAR Standard Drafting Team Chair January 2005
Larry Bugh ECAR Standard Drafting Team Chair January 2005
FERC Order in Devon Power LLC, et al. ER
Presentation on behalf of all DNs Lorraine Goodall - SGN
Key Value Indicators (KVIs)
DSR Workgroup 10 September
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Market Pricing Initiatives Update September 9th, 2003
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Load Shed Service for Import Information Session Market Services April 17, 2014

Agenda LSSi Product Proposed Modifications to the Contract The RFP Process and Next Steps 2Public

LSSi Product - Purpose Load Shed Service for Imports (LSSi) is an ancillary service product Developed by the AESO as part of the efforts to enable intertie transactions to the levels indicated by the T-Reg LSSi is provided by loads that agree to be tripped following the frequency drop caused by the sudden loss of imports coming across the AB-BC and MATL LSSi allows for arrest and recovery from frequency decay, and preserves system stability LSSi is used to allow additional scheduled imports to access the Alberta market without compromising system reliability 3Public

LSSi Product - Payment Structure Three-part payment structure: –The availability payment: paid to LSSi providers in the hours when they choose to offer LSSi, currently set at $5/MWh –The arming payment: paid to LSSi providers in the hours when their LSSi facilities are armed, a fixed price agreed to between the AESO and each individual LSSi provider –The tripping payment: paid to LSSi providers in the event that their armed load is tripped off when intertie trip causes the frequency to drop, currently set at $1000/MWh 4Public

LSSi Product – Usage Statistics The first LSSi contract became effective operationally in November 2011 Currently a total of 479 MW from 7 providers Summary Data of Intertie Restoration Facilitated by LSSi – April 1, 2012 to March 31, Public

Proposed Modifications AESO Internal Use Only6

Proposed Modification: T-85 Lock-Down 7 Issue: possible invalidation of T-85 ATC allocation causes additional cost and uncertainty to importers and potentially reduces import activity –Allocation of ATC occurs at T- 85 based on the available LSSi volume at the time –Arming of LSSi occurs at around T-20 –Available LSSi volume may drop between T-85 and T-20 T-85 lock-down of LSSi availability reduces the uncertainty around the ATC allocation at T-85

Proposed Modification: Manual Trip Issue: the feature of LSSi design not explicit in the contract Adding ‘manual trip’ allows the contract term to more accurately reflect the design of the product 8Public

Proposed Modification: No Availability Payment When Not Able to Increase Import Schedules Issue: LSSi was offered and the availability payment was made to the providers in situations where LSSi could not have been used increase import scheduling capability Number of hours ATC limited to zero: 9Public

Proposed Modification – Clarity in Compliance Issue: unnecessary risks to LSSi Agreements The LSSi Agreement could be enhanced by distinguishing non-compliance based on providers’ compliance efforts and the impact of the non-compliance on the system Offer greater clarity regarding the relationship between non- compliance violations and LSSi Agreement terminations –help providers better understand the AESO’s expectations of compliance practices –reduce unnecessary risks to LSSi Agreements 10Public

Next Steps Comments on report due April 25 AESO will post responses to stakeholder comments May 16 th RFP in Q3 AESO Internal Use Only11

The RFP Process 12Public

Thank You