October 2008 Phase IVB Construction Photographs by Steve Bousquin & Brent Anderson.

Slides:



Advertisements
Similar presentations
Christ Covenant Church Community Life Center. Revised Site Plan CLC A B WC.
Advertisements

Florida Water Forum Everglades Restoration June 3, 2011.
1 The Grain Drain Boston New York Washington, DC Miami Dune areas on the continental shelf caused by breaking waves are called sand bars. Waves pile up.
November 2009 Kissimmee River Restoration Features Photographs by Brent Anderson.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Lake Mary Jane - C-30 canal on south end looking northwest - Lake Hart in the distance NOTE: to forward these slides, click the Arrow or Page Down buttons.
Help me find the cardinal directions
Project Update August Gortmore TMF Phase 1 completed December 2008 by Priority Construction Ltd. Phase 2 completed June 2010 by SIAC Construction.
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI Aerial Photos Taken April 1, 2009 By.
Phase Difference = Phase Difference = 0.05.
Central-Wan Chai Reclamation
October 19, 2009 Multi-Purpose Student Center Aerial Photograph view from northeast.
COOL DRY WARMWET June, July & August El Nino Effects Cooler trends in the center of the nation are particularly evident in August, June and July can be.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Comprehensive Plan Advisory Panel September 19, 2007.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
FORT CALHOUN HIGH SCHOOL ADDITION/RENOVATION PROJECT PICTURES ALONG WITH DESCRIPTIONS.
Map Skills Compass Rose. Vocabulary Words A compass rose is a symbol that helps someone find directions on a map.
Quiz 10 1.Radar Mode for the radar image: Conventional, Doppler or Dual Polarized? Hint, the small image is a blend of satellite and conventional radar.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
 Invasive Species ◦ Autumn Olive (Eleagnus umbellata)  Monoculture ◦ Loss of Biodiversity ◦ Loss of Habitat  Choking out local growth.
August 2008 Kissimmee River Updates Photographs by Brent Anderson The Effects of Tropical Storm Fay.
December 2009 – January 2010 Kissimmee River Restoration Features Photographs by Brent Anderson.
Map Skills.
Site Selection The following are photographs of the sites from which you may choose your water samples. After reviewing the photos, you will use the map.
What is Osmosis? Osmosis is a form of passive transport (no extra energy needs to be used) where water molecules move down their concentration gradient.
By D. Jordan MONSOONS.  A seasonal prevailing wind in the region of South and Southeast Asia, blowing from the southwest between May and September and.
Baptism: No Water Down July 12, 2015 Baptism: No Water Down July 12, 2015.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
A gyre is another name for a swirling vortex. Gyres are large mounds of water with flowing water around them that are often 1,000km across. A wind blowing.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
Sailing in the Arabian Sea A ocean circulation that was well known by ancient sailors AND is a key part of modern climate change.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Baltimore City Department of Public Works. Design Notice to Proceed: October % Design Completed: July % Design Completion: November 2015.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
June - August 2009 Phase IVB Construction and Restoration Features Photographs by Brent Anderson.
Registrant: City of Arab Facility: Commercial Retail Development Registration #: ALR16EDTB County: Marshall (095) Inspection Date: 11/23/2009 NMS Inspection.
Measurement and Geometry 43 North South East West South-East South-West North-West North-East
CROP CIRCLES Photographs and Images collected from Web Sites.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Paddy’s Flats Construction laydown area (Total Disturbance 12.8ha)
San Marcos Landfill 1595 Questhaven Rd. San Marcos, CA AA-0008 Photos by Anthony Torres Page 1 of 3 October 3, 2012 The gravel bags leading to.
Boat Problems.
In the Name of Allah The Most Beneficent & Merciful
The Korean War
Baltimore City Department of Public Works
Sailing in the Arabian Sea
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
Flatbed Truck Transportation Flatbed Truck Transportation
el-Far’ah South 1998 Surface Map
Pine cove pit time lapse drone photos
Alex Chan, rukundo gahigiro, ning zhang
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Lehigh Canal Spoil Removal At Old King’s Road.
The Grain Drain ME Dune areas on the continental shelf caused by breaking waves are called sand bars. Boston Waves pile up large deposits of ocean sand.
Map & Compass Skills.
Climate + Physical Features
LID Improvements Lee Elementary School
Lincoln Common Redevelopment Construction Update.
北 N north 西 W west 東 E east south南 S.
Recreation Gymnasium Northeast: Inaccessible Element

A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
North Augusta High School – Phase 2A and 2B
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Rivers and Mountains of North America.
Maps & Map Keys.
Relative Motion All Motion is Relative.
Parts of a Map.
Presentation transcript:

October 2008 Phase IVB Construction Photographs by Steve Bousquin & Brent Anderson

October 8, 2008 Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008

July 31, 2008 Scraped spoil at the north end of Phase IVB construction site. October 7, 2008 Phase IVB Construction

Removing spoil from the spoil mound on the northwest floodplain of Phase IVB. October 7, 2008

Phase IVB Backfilling October 7, 2008 Removing spoil from the northwest floodplain of Phase IVB. The dump truck will bring the spoil material directly to C-38 for backfilling.

October 8, 2008 Looking south down the C-38 from the north end of the Phase IVB construction area. This image shows the first plug that is intended to direct water flow around the construction site. October 8, 2008

Looking southwest at the first plug from the northeast side of the Phase IVB construction area.

October 8, 2008 Looking south the plug on the north end of the Phase IVB construction area. The plug is diverting the water around the construction site which is intended to create less turbidity downstream of the backfilling.

October 7, 2008 Looking northeast at the plug that extends across the C-38 at the north end of the Phase IVB construction area. The bulldozer is pushing transported spoil material into C-38 downstream of the plug.

July 31, 2008 Dumping and bulldozing to backfill C-38 at the north end of Phase IVB. October 7, 2008

Dumping and bulldozing to backfill C-38 at the north end of Phase IVB. October 7, 2008