Hyper Status and Preliminary Testing of the New Hyper Bus Fault Detector CP Work done by CP section 10-12.2008 Based on Slides from Knud DAHLERUP-PETERSEN.

Slides:



Advertisements
Similar presentations
D. Wei, Y. Huang, B. Garlepp and J. Hein
Advertisements

NFC Forum Measurements
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Fundamentals of Data & Signals (Part II) School of Business Eastern Illinois University © Abdou Illia, Spring 2015 (February18, 2015)
Designing a EMC Compatible Electronic Meter using AD7755 a.
Application of the SIDECAR ASIC as the Detector Controller for ACS and the JWST Near-IR Instruments Markus Loose STScI Calibration Workshop July 22, 2010.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Kirsten Hacker Triggering and Measurement Devices for LCLS 10/14/04 1 Triggering and Measurement Devices for the LCLS Undulator.
M. Palm, CERN1 Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA.
Vital Signs Monitor UConn BME 4900 Vital Signs Monitor Purpose As the population ages, many people are required by their doctors to take vital signs.
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Module 3.0: Data Transmission
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Building a digital field strength meter for your PSK31 station NF6P – Dave Kalahar
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
A radiation-tolerant LDO voltage regulator for HEP applications F.Faccio, P.Moreira, A.Marchioro, S.Velitchko CERN.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
24Oct2013 D. Seitz SPP FIELDS RFS Analog Peer Review 24OCT
Announcements Assignment 5 due tomorrow (or now)
ACOE2551 Microprocessors Data Converters Analog to Digital Converters (ADC) –Convert an analog quantity (voltage, current) into a digital code Digital.
Update on MPPC frontend electronics development at IU
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
SOFIE Signal Gain Analysis Mark Hervig GATS. SOFIE Analog Signal Path V in is the signal into the balance attenuator, after synchronous rectification:
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Mixed Signal Chip LAB.Kyoung Tae Kang Dynamic Offset Cancellation Technique KyoungTae Kang, Kyusun Choi CSE598A/EE597G Spring 2006.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
DCDS for roundtable Paul Jorden 10 Oct 2013 Scientific Detector Workshop, Florence e2vMatthew Bastable and others RAL Matthew Clapp and others.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Instrumentation Overview Spring 2012 The laboratory is a controlled environment where we can measure isolated physical phenomena with a view to eventual.
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
Capacitive transducer. We know that : C=kЄ° (A/d) Where : K=dielectric constant Є° =8.854 *10^-12 D=distance between the plates A=the area over lapping.
SIGNAL INGEST IN UNCOMPROMISING, LINEAR VIDEO ARCHIVING: PITFALLS, LOOPHOLES AND SOLUTIONS Franz Pavuza Phonogrammarchiv Vienna.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Measurement and data extraction. How to measure the splice and diode interconnections. Accuracy and issues of these measurements. Data extraction issues.
16722 Mo: data acquisition150+1 data acquisition.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Andrzej SIEMKO CERN, Geneva The 2014 Kyoto Workshop on HTS Magnet Technology for High Energy Physics –WAMHTS-2.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
Chem. 133 – 2/18 Lecture. Announcements Homework Set 1.2 (bold problems) – due today Quiz 2 Today Electronics Lab Reports – due Tuesday Seminar this Friday.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
QPS Signal Analysis Case studies from MPP and QPS Bob Flora.
MPE Workshop 14/12/2010 Analysis of the RB and RQF/D splice data recorded with nQPS - status and plans towards full automation Analysis of the RB and RQF/D.
EKT 314/4 WEEK 5 : CHAPTER 3 SIGNAL CONDITIONING ELECTRONIC INSTRUMENTATION.
Wireless Smoke Detector System Andrew Chiu Chi-Ming Wang ECE 445.
SUPERHETERODYNE SPECTRUM ANALYZER. TOPICS Superheterodyne spectrum analyzer – Basic architecture – Frequency resolution – Sweep time – Video section.
The Equations of Motion Euler angle rate equations:
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Mrs V.S.KharoteChavan,E&Tc,PC poly
Design of a polyvalent robust isolated input channel
LHC Wire Scanner Calibration
2007 IEEE Nuclear Science Symposium (NSS)
Calorimeter Mu2e Development electronics Front-end Review
Unit - 5 Analog and Digital Instruments. Digital Voltmeter (DVM) Used to measure the ac and dc voltages and displays the result in digital form. Types:
Chem. 133 – 2/16 Lecture.
VELO readout On detector electronics Off detector electronics to DAQ
Fundamentals of Data & Signals (Part II)
Analog and Digital Instruments
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
Computer Networks Bhushan Trivedi, Director, MCA Programme, at the GLS Institute of Computer Technology, Ahmadabad.
Electrical measurements and diagnostics
Presentation transcript:

Hyper Status and Preliminary Testing of the New Hyper Bus Fault Detector CP Work done by CP section Based on Slides from Knud DAHLERUP-PETERSEN Architectural Design by Reiner DENZ Analysis by Zinur CHARIFOULLINE

❖ Preliminary Bus Splice Quality Characterization ( Nano Ohm Meter Function) ❖ Voltage Signal Noise Reduction Integration Hierarchy ❖ Differential Analog Bandwidth: Hz (tested at 1 kHz) ❖ 24bit ∑∆ ADC (modulator frequency: Hz) ❖ Hardware (in QPS) 24bit ∑∆ ADC integration period: 187 mS (5.35 Hz) ❖ Firmware (in QPS) moving rectangular integration: 18.9 S (101 samples) ❖ Software (in CCC) DC integration time: typically > 10 minutes (this is what counts!) ❖ Feasibility of nΩ Resolution ? ❖ Real Time Early Warning Bus Fault Detection ❖ Bus Inductance Compensation (94 µH) ❖ Feasibility of 300 µV Threshold ? Both functional aspects of the new bus fault detector have been tested:

Results from Measurements Performed on 27 Oct. at up to 1250 ADC DQQDC Detector Card now linked up to the WorldFip  and LHC Logging Strong Filtering, Sampling Time 187 ms, 100 points Sliding Average Post Treatment of Data with Labview  380 µV 1250 A 1 hour

Results from Measurements Performed on 27 Oct. Voltage during Ramping 1250 A 380 µV 4 A/s

Results from Measurements Performed on 27 Oct. at 1250 ADC Results from Ramping, Flat-Top and Ramp-down ±10 µV Real Time Noise Floor

Results from Measurements Performed on 27 Oct. at 1250 ADC with DQQDC Detector 100 nV 490 ± 90 pΩ 245 ± 45 pΩ / Splice Zero Closure = 20 nV ~ 1 hour integration / point

7 Bus Voltage Selected DC Data 50 µV 375 µV 4 A/s 1 hour 94 µH 3500 Amp Ramp 3500 Amp Ramp 29 October

Results from Measurements Performed on 29 Oct. at 3500 ADC with DQQDC Detector ± 50 pΩ / Splice 200 nV 580 ± 100 pΩ Zero Closure = 50 nV 10 min - 1 hour integration / point

9 500 nV 650 ± 29 pΩ Results from Measurements Performed on 30 Oct. at 5000 ADC with DQQDC Detector 325 ± 15 pΩ / Splice Zero Closure = 50 nV

Ramp [Amp] Resistance/Splice [pΩ]estimated statistical error [pΩ] mean28728 Repeatability & Consistency Repeatability & Consistency Same Splice Different Ramps Different Days Can we measure better than 1 nΩ ? YES WE CAN !

11 1 µV 1550 ± 340 pΩ Results from Measurements Performed on 30 Oct. at 5000 ADC with COMPENSATED DQQDC Detector 520 ± 110 pΩ / Splice

671 ± 43 pΩ 335 ± 22 pΩ / Splice 500 nV Can we measure better than 1 nΩ ? YES WE CAN !

13 97% Compensated Signal Residual = 10 µV out of 400 µV First Feeble Attempt at Compensation 4 A/s

Bus Voltage 375 µV Uncompensated Bus Signal Serious Attempt at Compensation

Can we have a detection threshold better than 300 µV ? YES WE CAN ! ±300 µV 4 A/s PC recapture ! Completely Compensated Bus Signal

Can we have a detection threshold better than 300 µV ? YES WE CAN ! ±20 µV

Conclusions from Preliminary Testing Signal noise is amazingly insensitive to cable routing. –This allows practical routing in the cable trays. Barring any unforeseen noise issues, sub nΩ resolution should be possible. A 300µV real time early warning threshold is practical. –But keep in mind that saturation at high field or magnetization at low field may spoil compensation slightly. –Some variation in splice resistance must be tolerated. –Some variation in electronic component noise must be tolerated. –And many unexplored and hence unforeseen noise sources may spoil and consume our threshold margin. (TGV, Bastille Day, etc.) –A healthy margin must be maintained, as false trips may keep the Higgs away. –Only after operational experience with the entire system will we know if the threshold really needs to be increased for stability or possibly could be decreased to provide added security. (The threshold needs to be secure but flexible.) YES WE CAN !