The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.

Slides:



Advertisements
Similar presentations
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Advertisements

The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting
Ana-Paula Bernardes EN-STI-RBS
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Radioactive Magnet Facility B /09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Septum 16 shielding increase: result of phase 2 of “Avant projet” S. Gilardoni (BE/ABP) In collaboration with S. Roesler, D. Forkel-Wirth, S. Damjanovic,
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
ISOLDE & HIE ISOLDE Status and Plans Richard Catherall EN-STI ISOLDE Technical Coordinator IEFC Workshop 7 th – 9 th March 2012.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
PH Department News Discussion with management
Workshop, 10/2012 “The Project”
ELENA installation and commissioning status
East Hall under construction
Status HIE ISOLDE installation and shutdown work
Radiation protection of Linac4 M. Silari Radiation Protection Group
Ana-Paula Bernardes EN-STI-RBS
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status & International Advisory Panel Meeting
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
PH Dept News Long shutdown 1: Baseline Project
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
HIE-ISOLDE contribution packages
Beam Transfer Line Stage 1:
East Hall under construction
Presentation transcript:

The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 2 Abstract Hie-Isolde Experimental hall –Layout –Future –User requirements Radio Protection issues –Different solutions –Studies and collaborations User facilities –Changes and improvements

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 3 Hie-Isolde Hie-Isolde experimental hall

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 4 Hie-Isolde SC Linac 5.5MeV/u by the autumn of 2014 First 10MeV/u by April 2016 Hie-Isolde SC Linac:

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 5 Beam Transfer Line

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 6 Experimental Hall Lay-out Straight line with 2 branches – July April 2014 Miniball move: Oct 2013 – April 2014 Miniball Actar / Helios Miniball Beam diagnostics Stage 1:

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 7 The bend Spectrometer installation and 2nd Miniball move Miniball Spectrometer Actar / Helios Miniball Stage 2: TSR TSR and beyond.. Stage 3: Experimental Hall Lay-out

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 8 Hie-Isolde Possible TSR installation above the CERN cable-tunnel. Tilted beamline coming up from the machine. TSR Max Planck Institut für Kernphysik Heidelberg LOI endorsed Jan 2011 (K. Blaum, Y. Litvinov)

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 9 User Requirements Requirements for the HIE-experiments Info needed on: Power consumption Cooling & ventilation Cryogenics Alignment & spacing (nr of racks) Sensitivity to radiation, temp & vibrations Transport requirements

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 10 Radio Protection issues Miniball Spectrometer Actar / Helios Miniball 10MeV/c

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 11 Radio Protection issues Miniball Spectrometer Actar / Helios Miniball 10MeV/c Controlled access Options under study: Close the hall Restricted area Controlled access Beam interlock

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 12 Radio Protection issues Miniball Spectrometer Actar / Helios Miniball Options under study: Close the hall Shielding For each experiment Allowing access to others during a run Individual beams interlocked Beam interlocked access 10MeV/c

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 13 Radio Protection issues Miniball Spectrometer Actar / Helios Miniball Options under study: Close the hall Shielding Limited intensity To stay within RP restrictions many elements will be produced at low intensity anyway.. Limited beam intensity 10MeV/c

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 14 Radio Protection issues Miniball Spectrometer Actar / Helios Miniball Options under study: Close the hall Shielding Limited intensity Open access If studies prove safe levels No restricted access 10MeV/c

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 15 Studies Existing models to calculate neutron and gamma doses from low energy heavy ions: -NEUGAM code -PHITS calculations -FLUKA calculations : conservative code, no expertise at CERN : suitable for HIE-Isolde but not validated (nothing to compare to) : expertise at CERN Courtesy: Ana-Paula Bernardes EN/STI, Joachim Vollaire DGS/RP

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 16 Studies & collaborations CEA-CERN collaboration - Thanks to Y.Kadi PHITS Calculation on neutron and gamma production from low energy heavy ions - Meeting was held on the 13th of April with DSM/IRFU/SENAC to define potential collaboration Fellow Marie-Curie NEUGAM, PHITS, FLUKA Calculation comparaison on neutron and gamma production from low energy heavy ion - Advertisement for a fellow position went out for an experienced candidate to perform all the detailed calculations ANL-CERN collaboration - Thanks to M.Huyse NEUGAM code to calculate neutron and gamma dose, courtesy of B. Back (ANL) - Typical beam species intensity/energy to be defined for RP analysis Courtesy: Ana-Paula Bernardes EN/STI, Joachim Vollaire DGS/RP

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 17 User Facilities 1. Increasing the surface of the Solid State Lab in building B.115: For RP safety reasons all solid state activities will be moved from B.275 to B.115 This will suppress the existing workshop in B.115 and courtyard between B.115 and B Replace the existing building 507 by a new building : Ground floor (only accessible from within the surveyed area): - Labs and workshop First floor (accessible from outside the surveyed area): - Data Acquisition rooms - Meeting room/Visitors Center - Kitchen Cost study ongoing: Eliseo Perez-Duenas GS/SE under discussion

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 18 Present situation (ground floor Jura side): Control room User Facilities

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 19 Solid State Lab Increasing the surface of the Solid State Lab in B.115: Control room

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 20 Replace building 507 Control room 2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 21 Control room 2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area): Replace building 507

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 22 Cost studies new B 507 Cost studies and civil engineering plans by Eliseo Perez-Duenas GS/SE No signs of asbestos found in the existing building Phase 1: estimate 120kChf - dismounting the present building - construction permit - adapting the concrete foundation Phase 2: estimate 1.8MChf 1MChf - construction of the new concrete building - total surface 780 m2 460 m2 - not taken in account electrical installations, CV, Labo’s, etc. Construction during long shutdown 2013?

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 23 Cost studies new B 507 Study on the use of modular cabins instead of a full concrete building Phase 1: estimate 120kChf - dismounting the present building - construction permit - adapting the concrete foundation Phase 2: estimate 520kChf - installation of modular cabins, interconnected and on 2 floors - total surface 460 m2 - not taken in account electrical installations, CV, Labo’s, etc. Advantages: - lower costs - fast construction - flexible work floor

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 24 Cost studies new B 507 Example modular cabins at the AD at CERN: DAQ and experiment control rooms moved outside the AD hall for RP reasons - First 6 cabins, more to add - Second floor foreseen - Inside configuration flexible Courtesy Eliseo Perez-Duenas GS/SE

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 25 Acknowledgement EN/HDO: YACINE KADI, BE/RF: MATTEO PASINI BE/ABP: FREDERIK WENANDER GS/SE: DANIEL PARCHET, ELISEO PEREZ-DUENAS EN/CV: PAUL PEPINSTER, BENOIT BELLIN-CROYAT EN/EL: RENE NECCA TE/CRG: NICOLAS DELRUELLE, JOS METSELAAR EN/STI: RICHARD CATHERALL, ANA-PAULA BERNARDES EN/MEF: STEPHANE MARIDOR GS/DI: CYRILLE BEDEL TE/MSC: YANN LECLERCQ, ARNAUD BOUZOUD PH/SME: MAGDA KOWALSKA DGS/RP: JOACHIM VOLLAIRE, ALEXANDRE DORSIVAL