LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B. PandeyResident Engineer Const. of ROB at Tijara Phatak Sh. R.K. MaliAsstt. Resident Engineer Const. CFC Building Gola ka bas Sh. N.K. Bhatnagar Accounta nt Total =
A/R to Chanduki under PMGSY
ALWAR BHIWADI ROAD (BOT)
A/R TO AKBARPUR ( RMUP )
RAC BARRACK 100MEN (PHASE-I)
RAC BARRACK 100MEN (PHASE-I&II)
PRESENT SCENARIO
FUTURE SCENARIO
PROJECT AT A GLANCE Name of Work :- Construction of RoB at L.C. No. 111 ( Tizara Phatak) on Alwar – Bhiwadi Road ( T.P. No. 71/3-4 B.G.) Name of Client :- UIT, Alwar A & F Sanction :- Vide No. P.8(1) UDH/1/2006 Dated 17 th Sept for Rs Crores. Technical Sanction :- Rs Crores on dated St date of start : St. date of completion : Expected dated of completion: Funds received from client upto 4 th Dec :- Rs Lacs Expenditure as on 4 th Dec :- Rs Lacs. ( including liabilities)
Land marks :- GAD approved by Railway : Pile foundation work is in progress Funds Received from client :- (a) Rs Lacs on for preparation of DPR (b) Rs Lacs on (c) Rs Lacs on
Hindrances :- Encroachment removed by UIT on but matter is pending in the Rajasthan High Court, Jaipur for Payment of Compensation for land & Buildings. Shifting of utilities such as:- (a) Water supply lines shifting are still in process (b) Electric poles are still in process (c) Removing of trees- Application for permission submitted by UIT, Alwar (d) The traffic is not diverted till date from LC No. 111 Agitation by local citizens for land and building compensation since to
CFC BUILDING AT GOLA KA BAS
CFC BUILDING AT GOLA KA BAS
PROJECT AT A GLANCE 1.Name of Work :- Construction of Common Facility Center for Murtikala Cluster Gola ka Bas, Tehsil-Rajgarh District- Alwar (Raj.) 2. Name of Client :- DIC, Alwar 3. A & F Sanction :- Rs Lacs 4. Technical Sanction (Revised) :- Rs Lacs 5. St. date of start : St. date of completion : Funds received from client as on 31 th Oct :- Rs Lacs 8. Expenditure as on 04 TH Dec :- Rs Lacs. 9. Bottlenecks:-Revised funds received late as on – Plate form Drawing received as on – Encroachment on land for Culvert and approach road has not yet been cleared till today as on
PROPOSED ROAD
WIDENING OF ALWAR –BHIWADI ROAD (SH-25)KM 146/0 TO 225/0 FROM 2 LANE TO 4LANE DEVIDED HIGHWAY LENGTH :79.00KM PROJECT COST: Crores PERIOD OF CONSTRUCTION: 18 Months PERIOD OF CONCESSION : 19 YEARS Total Period: 20 Years 6 Mths Toll Booth:2 Nos. Booth 1. on KM on KM 211