Firming For Indian Settlements OVERVIEW OF WATER SETTLEMENT ELEMENTS.

Slides:



Advertisements
Similar presentations
Recovery of Long-Term Storage Credits: ICUA, On-River, & M&I Firming Status & Update: AWBA Commission December 20, 2006 Chuck Cullom, CAP Resource, Planning,
Advertisements

1. 2 Montlhy and biannually, USA provides information about forecast and status of Colorado River Basin. Since 2000, drought in the basin caused low levels.
Colorado River Basin Water Supply and Demand Study December 10, 2010.
Responses to the New Normal Creative Partnerships for Innovative Water Solutions Colorado Water Workshop – July 17, 2013.
Groundwater Management Districts Association Chuck Cullom Colorado River Manager CAP January 7, 2015.
Groundwater Management Districts Association
The Colorado River: Interim Guidelines for Lake Powell and Lake Mead National Integrated Drought Information System Workshop October 1, 2008.
1 CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
Central Arizona Project Thomas W. McCann January 7, 2015.
Arizona Water Banking Authority December 3, 2014.
Balancing Surface and Groundwater Supplies
Water Resources Issues in the Lower Rio Grande June 3, 2005 J. Phillip King, P.E. Assc. Professor/Assc. Dept. Head Dept. of Civil Engineering, NMSU Consultant,
To Kill a Shortage: Targeting Augmentation and Conservation 2014 Colorado River Water Users Association Annual Conference December 11, Gregory J.
AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting.
Colorado River Water Supply and 7 State Drought Plan Don Ostler Upper Colorado River Commission.
Managing Arizona’s Water Resources Today and Tomorrow Rita P. Maguire, Esq. Maguire & Pearce PLLC Rita P. Maguire, Esq. Maguire & Pearce PLLC ACMA Water.
Arizona Water Banking Authority December 4, 2013.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
Colorado River Basin Water Supply Out look Lake Powell Lake Mead.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
Responding to Drought (and other) Conditions on the Colorado River Urban Water Institute’s 21 st Annual Conference August 14, 2014.
August 23, 2012 Urban Water Institute August 23, 2012 Can the Colorado River meet our Region’s Future Water Supply Needs? Bill Hasencamp Manager, Colorado.
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
Joint Recovery Plan Update ADWR, AWBA & CAP AWBA Quarterly Meeting September 4 th, 2013.
Arizona’s Water Situation Arizona League of Cities and Towns August 20, 2015 Thomas Buschatzke, Director Arizona Department of Water Resources.
Southern California Water Dialogue
AVAILABILITY OF EXCESS CAP WATER. Colorado River Allocations Upper Basin – 7.5 MAF Lower Basin MAF CA – 4.4 MAF AZ – 2.8 MAF On-river users ……….
Introduction to Water Law & the Central Arizona Project (CAP)
AWBA Quarterly Meeting June 20, Annual Report Requirements Accounting of AWBA transactions and proceedings for previous year All monies expended.
Colorado River Sustainability, Drought Response & Central Arizona Project Urban Water Institute August 27, 2015.
Arizona Water Banking Authority December 19, 2012.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
Water Resources 101 Arizona’s Institutional : Boundaries and Regulations.
Arizona Water Banking Authority 2014 Annual Report and Ten-Year Plan AWBA Quarterly Meeting June 17, 2015 Presented by Virginia O’Connell, AWBA Manager.
Water Resources 101 Arizona’s Water: Supplies and Usage.
1 Certainty in Uncertain Times? Policy Implications of the Colorado River Compact Eric Kuhn, General Manager.
COLORADO RIVER WATER SUPPLIES AND THE QSA ACWA’S 2011 SPRING CONFERENCE THE NEW REALITIES OF WATER SUPPLY RELIABILITY.
Colorado River Update Terry Fulp Deputy Regional Director
1 Greg Walch, General Counsel Southern Nevada Water Authority Collaborative Efforts on the Colorado River.
“Access to Excess” Procedures for Distributing Excess CAP Water, 2010 to 2014 AWBA Quarterly Meeting June 17, 2009.
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
A Reconsideration of the Law of the River in an Era of Scarcity Lawrence J. MacDonnell Attorney and Consultant Boulder, Colorado.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Urban Water Institute Colorado River Lower Basin Issues Tanya Trujillo Colorado River Board of California February 10, 2016.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Overview of 4-cent tax 10 -Year Forecast Central Arizona Water Conservation District Gary Given April 24, 2013.
An Economist’s Law of the River Lesli Kirsch-Burke Economist, Boulder Canyon Operations Office Lower Colorado Regional Office April 8, 2016.
Yuma Agriculture Water – Rights and Supply Yuma’s Agriculture Water: What You Need To Know Yuma Agriculture Water Conference January 13, 2016 Thomas Buschatzke,
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Arizona Contributions to Address Lake Mead’s Structural Deficit 2016 Martz Summer Conference | June 9, 2016 Amy McCoy, Director Aylward + McCoy & Pilz.
Central Arizona Project
Tom Buschatzke Director Arizona Department of Water Resources
Colorado River Commission of Nevada (CRCNV)
The Future of the Colorado River – Business as Usual or ???
Drought on the Colorado River System: Impacts and Response
WESTCAS 2018 Fall Conference October 24, 2018
PILOT SYSTEM CONSERVATION PROGRAM
American Council of Engineering Companies
Drought Contingency Planning Efforts
SAN LUIS REY RIVER WATER RIGHTS SETTLEMENT
Water Planning: Scarcity and Collaboration Arizona and the DCP
Colorado River Update – What does the Drought Contingency Plan mean for Arizona? Alexandra M. Arboleda (602)
AZ LBDCP Mitigation Program Summary
Presentation transcript:

Firming For Indian Settlements OVERVIEW OF WATER SETTLEMENT ELEMENTS

Firming For Indian Settlements Firming For Indian Settlements What Is “Firming?” Background Section 105 of Arizona Water Settlements Act (S.437) Un-contracted 65,647 of M&I priority water was relinquished for use in settlements in early versions of settlement State parties proposed compromise using firming of NIA concept Agreement reached on split responsibility between Fed and State.

Firming For Indian Settlements Firming For Indian Settlements “In the same manner” State perspective – firm only if NIA supply falls below target level Federal perspective – firm based on assumption that target amount should have been M&I priority.

Firming For Indian Settlements Firming For Indian Settlements Examples #1 – Full supply – no difference #2 – 33% shortfall State – no obligation Fed – 4,600 af obligation #3 – 50% shortfall State – no obligation Fed – 7,500 af obligation

Firming For Indian Settlements Firming For Indian Settlements Examples #4 – 90% shortfall State – 3,000 af obligation Fed – af obligation #5 – 100% shortfall Both State and Fed – 15,000af obligation #6 – 20% M&I shortfall Both Fed and State – 11,250 af obligation

SOUTHSIDE REPLENISHMENT PROGRAM

STATE LEGISLATION REQUIRED Southside Protection Program must be enacted by Arizona Legislature in order for GRIC Settlement to take effect--minimum requirements: Establish the Protection Zones Establish Southside Replenishment Bank Provide export prohibitions Provide replenishment obligations of State Provide for enforcement of Program by ADWR Southside Replenishment Program

PROTECTION ZONES Western Protection Zones M&I Zone Industrial Zone Eastern Protection Zones North South Central Protection Zone Southside Replenishment Program

PROHIBITION ON UNDERGROUND WATER EXPORTATIONS No Exportation From A Protection Zone For A New Use No Exportation From A Protection Zone For Use In Excess Of The Highest Historic Non-irrigation Use In 1999, 2000 Or 2001 Southside Replenishment Program

SOUTHSIDE REPLENISHMENT BANK State To Deliver 1,000 af each year to Reservation for 15 Years create a 15,000 af Bank When Balance In Bank Falls Below 5,000 af, State Obligated To Replace The Balance To 5,000 af Southside Replenishment Program

STATE REPLENISHMENT OBLIGATION WESTERN ZONE The amount by which non-irrigation pumping in M&I Zone exceeds 2.0 af per acre The amount by which pumping for municipal purposes in Municipal Zone exceeds 2.0 af per acre Southside Replenishment Program

STATE REPLENISHMENT OBLIGATION EASTERN ZONE The amount by which non-irrigation pumping in the Eastern Zone North Zone exceeds 2.33 af per acre The amount by which non-irrigation pumping in the Eastern Zone South exceeds 2.33 af per acre Southside Replenishment Program

STATE REPLENISHMENT OBLIGATION ARIZONA WATER COMPANY In years before 2024, pumping in excess of 1,275 af/yr from Eastern Zone South transported to outside Eastern Zones After 2023, AWC shall replenish any such excess pumping AWC to assign to State unused CAP for AWC Coolidge system Southside Replenishment Program

STATE REPLENISHMENT OBLIGATION IRRIGATION PUMPING Pumping in excess of cumulative IGFR allotments under TMP Base Ag Conservation Program Western zones treated as a single zone Eastern zones treated as a single zone Imported water used for irrigation excluded Southside Replenishment Program

OPTIONS FOR REPLENISHMENT Debiting the Southside Replenishment Bank Direct Delivery Extinguishment of Long Term Credits In Western Zones, must be earned under state law within 5 years prior to extinguishment In Eastern Zones, must be earned under state law within 7 years prior to extinguishment Southside Replenishment Program

Firming For Indian Settlements SHORTAGESHARINGAGREEMENT

Firming For Indian Settlements Firming For Indian Settlements Shortage Sharing Agreement Background Shortage potential recognized Differences in methodology emerged as contracts were written New agreement in paragraph 8.16 of GRIC Settlement Non-Indian Ag priority Change from % basis to fixed volume Shortages shared on pro-rata basis

Firming For Indian Settlements Firming For Indian Settlements Shortage Sharing Agreement M&I/Indian Priorities Fixed maximum pools Change in M&I pool after2044 to reflect Cliff Dam replacement contract New agreement Neither side must reduce first – steps eliminated Formula will establish split for any value of CAP available supply Separate formulas to split shortage among like pool contractors

Firming For Indian Settlements WATER AVAILABILITY

Firming For Indian Settlements WATER AVAILABILITY Colorado River Operations Water Operation Model & Model Assumptions Calculation of Firming Requirements Estimated Firming Obligation Current Commitments

“Law of the River” 1922 Colorado River Compact 1929 Boulder Canyon Project Act 1944 Treaty with Mexico 1964 AZ v. CA Supreme Court Decree 1968 Colorado River Basin Project Act 1974 Minute 242 & Salinity Control Act 2000 Interim Surplus Guidelines Firming For Indian Settlements Colorado River Operations

1922 Colorado River Compact Allocations Upper Basin – 7.5 MAF Lower Basin MAF CA – 4.4 MAF AZ – 2.8 MAF NV – 0.3 MAF AZ 50 KAF Upper Basin Lee Ferry MX – 1.5 MAF

Hoover Dam Parker Dam Imperial Dam

1964 AZ v. CA Supreme Court Decree Charged the Secretary with determining “surplus”, “shortage”, “normal” flows Secretary enjoined from delivering more than 7.5MAF to Lower Basin during “normal water supply conditions” Provided for use of unused apportionment between Lower Basin states Firming For Indian Settlements Colorado River Operations

1968 Colorado River Basin Project Act Requires the Secretary to develop coordinated long- range operating criteria for the operation of storage reservoirs in the Upper Basin and the Lower Basin. Requires the Secretary to develop criteria for determining normal, surplus and shortage conditions. Annual Operating Plan – annual declaration of supply conditions. Firming For Indian Settlements Colorado River Operations

Firming For Indian Settlements Water Operation Model Computer Model developed by US Bureau of Reclamation ADWR uses model output to identify the potential future water supply conditions and availability. ADWR quantifies the potential shortages - - representing the amount of water that will need to “firmed”

INFLOW LOWER BASIN STATES UPPER BASIN USES PROJECTING WATER SUPPIES EVAPORATION MEXICO 7.5MAF 1.5MAF NORMAL SUPPLY

INFLOW LOWER BASIN STATES UPPER BASIN USES PROJECTING WATER SUPPIES EVAPORATION MEXICO 8+ MAF 1.7MAF SURPLUS SUPPLY

Firming For Indian Settlements Model Assumptions Upper Basin Water Demand Build-Up Lake Mead Protect Levels (Shortage Strategy) Surplus Strategy (Interim Surplus Guidelines) AZ Water Demand – Shortage Strategy Operation of the Yuma Desalter Other (Hydrology, LB Water Demand, Mexican Surplus)

Firming For Indian Settlements Model Assumptions Upper Basin Water Demand Build-Up AWBA Study Commission Projections USBR Projections

1000’ 895’ Normal (2.8 MAF) Begin Shortages (2.3 MAF) Shortage (2.3 MAF or less) Minimum Pool Surplus or Flood Control Releases Firming For Indian Settlements Firming For Indian Settlements Lake Mead Protect Levels

1145’ (62% full) 1125’ (54% full) 1000’ (17%) 895’ / Full Domestic Surplus (2.8+ maf) / Partial Domestic Surplus (2.8+ maf) Normal (2.8 maf) Begin Shortages MWD of CA takes first 1 MAF of shortages to AZ Minimum Pool Surplus or Flood Control Releases Firming For Indian Settlements Firming For Indian Settlements Interim Surplus Guidelines

When the Sec. of DOI determines that insufficient water is available to deliver 7.5 MAF, then water will be delivered to: First priority – pre-1929 rights in order of priority (Pre-Hoover Dam/Boulder Canyon Project Act) Then, delivery to other pre-1968 contractors in CA up to 4.4 MAF, and similar contracts in other states. In Arizona, most of the contracts on the river are either pre-1929 or pre Then, post 1968 contracts, or the CAP and 165,000 acre-feet of use on the mainstream Firming For Indian Settlements Firming For Indian Settlements Arizona Water Rights

Firming For Indian Settlements Model Assumptions Water Demand – Priority 4 Users Shortage Strategy Mainstream & CAP CAP M&I Subcontractors & CAP Indian Contractors

Firming For Indian Settlements Model Assumptions Operation of the Yuma Desalter Early Start Date (2004) Delayed Start (2030)

Firming For Indian Settlements Model Assumptions Projections of CAP and Mainstream Water Use LOW SHORT Mainstream AG M&I & Indian Tribes AWBA Losses Increasing GRD

Firming For Indian Settlements Calculation of Firming Requirement Assumption ComponentScenario AScenario D Hydrology Start Year 1906 Starting Reservoir Levels Jan. 1, 2003 Yuma Desalinization Plant Begin Operation 2004Begin Operation 2030 Upper Basin Demands 4.8 MAF5.4 MAF Surplus Strategy 70RISG Shortage Strategy 80P100080P1083 Hydrology 100 Year Analysis (1906 – 2002) using 96 traces 100 Year Analysis (1906 – 2002) using 96 traces

Firming For Indian Settlements Estimated Firming Requirement Firming ComponentScenario AScenario D GRIC (15,000AF) NIA 6,00067,000 M&I 272,000533,000 TOTAL 278,000600,000 GRIC (15,000AF) + Unallocated (8,724AF) = 23,734 AF NIA 9,000120,000 M&I 430,000843,000 TOTAL 439,000963,000

Firming For Indian Settlements CURRENT COMMITMENTS FOR CAP WATER

Firming For Indian Settlements Current Commitments for CAP M&I Subcontractors Indian Contractors Agricultural Incentive Recharge CAGRD Obligation Others CAGRD Reserve AWBA Intrastate AWBA Interstate

Firming For Indian Settlements Current Commitments for CAP

Firming For Indian Settlements POTENTIAL OPTIONS

Payment In-Lieu of Damages Demand Reduction - Water conservation - Minimizing waste of all water supplies - Maximizing efficiency in indoor and outdoor watering - Encouraging reuse of water supplies - Forbearance/Land Fallowing Firming For Indian Settlements OPTIONS FOR NON- AWBA PARTICIPATION

On-Reservation Recharge & Recovery Off-Reservation Recharge/On- Reservation Recovery Off Reservation Recharge/Off- Reservation Recovery Lease/Exchange Recovery of Existing Credits Groundwater Transfers Various Combinations Firming For Indian Settlements OPTIONS FOR AWBA PARTICIPATION

Firming For Indian Settlements FUNDING AVAILABILITY

Firming For Indian Settlements FUNDING AVAILABILITY Estimated Cost Funding Sources Current Statutory Restrictions Historic Use

Firming For Indian Settlements FUNDING AVAILABILITY Cost to Meet Obligation Firming In-Lieu USF Southside Replenishment Bank Direct Delivery of Water

Firming For Indian Settlements Estimated Costs ComponentScenario AScenario D GRIC (15,000AF)278,000AF600,000AF In-Lieu$9,452,000$20,400,000 USF$18,626,000$40,200,000 GRIC (15,000AF) + Unallocated (8,724AF) = 23,734 AF 439,000AF963,000AF In-Lieu$14,926,000$32,742,000 USF$29,413,000$64,521,0000 Southside Replenishment Bank15,000 AF Delivery$900,000

Firming For Indian Settlements FUNDING AVAILABILITY General Fund Appropriation Source Limitations on Use Historic Income/Use

Firming For Indian Settlements FUNDING AVAILABILITY Ad-Valorem Tax Source Limitations on Use Historic Income/Use

Firming For Indian Settlements FUNDING AVAILABILITY Groundwater Withdrawal Fees Source Limitations on Use Historic Income/Use

Firming For Indian Settlements SUMMARY

What Do We Know Why and What the Firming Obligation means; What the Southside Replenishment Program requires; The range of modeling assumptions that can be used to project the volume of water needed to meet the firming obligation; Approximate range of firming obligation volume; Firming For Indian Settlements SUMMARY

What Do We Know The variety of methods that can be used to meet the firming obligation; Current cost of excess CAP water supplies and cost to recharge; Current funding sources available; and Current statutory authorities. Firming For Indian Settlements SUMMARY

Why AWBA?? AWBA has existing authority and has performed a similar role for M&I Existing Funding Authority - General Fund - Withdrawal Fees Can Integrate Needs Into AWBA Plan Firming For Indian Settlements SUMMARY

Form an AWBA Technical Advisory Committee to Develop Alternatives that Benefit the State and the Tribes. Firming For Indian Settlements RECOMMENDATION

Technical Advisory Committee Objectives Determine the modeling assumptions that are most appropriate to estimate the volume of water needed to meet the firming obligation; Determine the projections necessary to maintain or replenish the Southside Replenishment Bank; Develop options for meeting the firming obligations; Develop options to build the Southside Replenishment Bank; Firming For Indian Settlements RECOMMENDATION

Technical Advisory Committee Objectives Determine cost components for each of the firming options; Determine cost components to develop the Southside Replenishment Bank; Develop criteria for ranking the options; Determine the funding sources appropriate to finance the options; Firming For Indian Settlements RECOMMENDATION

Technical Advisory Committee Objectives Determine the necessary changes to statute to meet the obligations; and Determine the impacts to other AWBA functions. Firming For Indian Settlements RECOMMENDATION

Technical Advisory Committee Objectives Firming For Indian Settlements RECOMMENDATION Develop alternative approaches for the Authority to review in order to make a recommendation to the Director of the Department of Water Resources including the ranked options, the estimated costs, and an identification of changes to statute.

QUESTIONS??? Firming For Indian Settlements