Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011.

Slides:



Advertisements
Similar presentations
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Advertisements

Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update.
Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
Land Use Program Septic System Overview Scott Weldon
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
1.  Consider objectives Control migration of gas Control emission Control odors Maximize gas collection fir energy recovery Comply with regulations 
May 2013 Tehachapi Renewable Transmission Project (TRTP)
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Using the Underground Traverse Calculator. Team #1 Begins a Traverse Luke Skywalker and Sandra Bullock begin an underground traverse as Team #1 There.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Forecast 10 years - Underground Space Technology - USHIJIMA Kunio (Civil) NOMURA Mitsugu (Civil)
Gauging Devices.
SPL Integration Layout Impact on cryo and vacuum sectorisation ◊ Underground obstacles, constraints on slope and length of the SPL ◊ Continuous cryostat.
Candor Construction Group & Alternative Energy Associates Presents Geothermal Heating & Cooling
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Maps.
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Differential Equations 7. The Logistic Equation 7.5.
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
TRENCHLESS TECHNOLOGY
Washington Metropolitan Area Transit Authority Voliya Arakkal Sr.GIS Analyst GIS in Public Transportation Conference September 15, 2011 Linear Referencing.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Wes Marshall, P.E. University of Connecticut March 2007
Preparing Foundations for Cylinders & ASME Tanks
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Underground Cost Analysis; Option 10 and 11 - TRTP Project Project Segment 8A Corridor October 21, 2012.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Stacking Footballs How many footballs can you fit in a classroom?
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Pioneering MUD RECOVERY SYSTEM Successfully Controls “Frac Outs” for Horizontal Directional Drilling projects Ron Halderman, PE Director HDD Division Mears.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Basic resistivity models 2 Layer 4 Layer 3 Layer Characteristic Curves.
Environmental and Exploration Geophysics I tom.h.wilson Department of Geology and Geography West Virginia University Morgantown, WV.
Now that I built it, How much did it Cost?
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
Aqueduct Vocabulary. covered trench--a long cut in the ground, a ditch Roughly four of every five miles of Rome's aqueducts run underground, many in covered.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
Characteristic curves and their responses. The method of Characteristic Curves (Two layer case) Summary of steps Set  1 =  a1 Construct the ratios 
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
1 Wide Area Network Project Information Technology Advisory Committee March 21, 2007.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Sanitary Engineering Lecture 10 Revision
Gauging Devices.
Civil Engineering for FCC-eh and LHeC
Middlebelt Transport and Storage Tunnel (MTST) Project
TRENCHLESS TECHNOLOGY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Local communities and municipalities
CLIC Civil Engineering Update
Volusia Virtual School
INDOOR BASEBALL / SOFTBALL FACILITY
Print Reading.
Scatter Plot 3 Notes 2/6/19.
Drawing of Sufficient Detail (DOSD)
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
ABC Company ABC Chemical Complex Engineering Specification
Presentation transcript:

Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011

SCE Partial Underground Alternative Analysis 2 In our opinion SCE has misrepresented the underground options known as Alternative 5 (Partial Underground Alternative) in the EIR, and therefore biased this alternative in favor of the overhead transmission. A short list of specific items from the EIR we believe are inaccurate or simply wrong. Key items that are in error or biased listed below. 1.Size of the transition station 2.Location of the transition station 3.Method of construction 4.Cost of construction 5.Construction schedule

1. Size of the Transition Station 3 SCE asserts the size of the transition station to be 220 feet wide and 320 feet long, thereby implying these structures would be too big and not fit in the current right of way. By arranging the transition in vertical configuration as oppose to horizontal configuration the width of the facility can be reduced The length of the configuration has less bearing on the footprint due to the fact that the constraint to the project is the 150 width of the right of way See attached sketches

SCE Configuration 4 Note: the 220 foot width

Alternative Configuration 5 Stack approach

2. Location of East Side Transition Facility 6 The East Side Transition Facility was show to be located.1 mile west of pipe line. By locating this facility east of Pipeline it makes the facility less intrusive and more viable. Location as indicated in the EIR Alternative locations of an East Side Transition Facility just east of Pipeline or east of the 71.

3. SCE Method of Construction 7 SCE proposes an 18 foot diameter deep tunnel with various systems, including vent systems, SCADA, power source, etc. In addition the tunnel is expected to be 100 foot deep on the eastern side and up to 420 feet deep on the western side. It is this depth in tunneling that is increasing the cost exponentially. SCE is proposing a using a TBM (Tunnel Boring Machine). The type of transmission line identified was gas insulated transmission line (GIL). TBM tunnel boring machine GIL transmission line

Method of Construction 8 An 18 foot diameter tunnel with various systems, including vent systems, SCADA, power source, etc. can still be used but in lieu of a deep tunnel, a shallow tunnel in the 50 to 60 foot depth range can be used. By taking this approach it eliminates the TBM, deep shafts, simplifies the constructions, reduces the cost, and reduces the schedule. The GIL transmission lines also have the added benefits of having the option of direct buried or placed above ground. Above ground TunnelDirect buried

Alternative Method of Construction 9 At 40 to 50 foot depth the construction method for a shallow tunnel can be cut and cover thereby, cutting the cost of construction. In addition, by using the GIL transmission lines it allows the contractor to follow the topography of the alignment. Sloped back trenchesShored trenches

4. Cost of Construction 10 SCE asserted that the cost of going underground can be as much as 30 times the cost of going overhead. Approximate estimate cost per linear foot for aerial installation = $450 per foot. Using the deep tunnel method as suggested by SCE, the approximate cost per linear foot = $13,500 per linear foot. Using the cut and cover (shallow tunnel) method as an alternative, the approximate cost per linear foot = $1,800 per linear foot. Therefore, SCE was off by their calculations by over 650%!

5. Construction Schedule 11 SCE asserted that a TBM will be required for a deep tunnel. Approximate time it takes to order and fabricate a TBM = 9-12 months If a cut and cover approach is used in lieu of a deep tunnel, no TBM would be required and the project can cut up to 12 months off the schedule

SCE Partial Underground Alternative Analysis - Summary 12 As shown many of the SCE key assumptions were wrong or exaggerated in order to be bias against the underground alternative. Size of the transition station can be smaller than show in the EIR and therefore, capable of fitting in the pre-existing ROW Location of the transition station was shown in a location that had the most adverse impact to the community. Method of construction selected (deep tunnel) was the most complicate and challenging raising a host of construction issues such as the acquisition of a TBM, deep shafts, dewatering, tunnel portals, etc… that would have been avoided if a cut and cover and shallow tunne approach was used. Cost of construction for a deep tunnel was the most expensive as oppose to the most efficient (cut and cover) thereby, creating an impression that it was too costly. Construction schedule can be cut by approximately one year by not requiring a TBM if a cut and cover tunnel approach was used. In summary, it appears that SCE had a built in bias against this alternative in order to select the aerial approach.