JCO CRITICALITY ACCIDENT

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Advertisements

Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
History of Nuclear Safety Legislation in Pakistan
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Gauges and well logging
Regulatory Body MODIFIED Day 8 – Lecture 3.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency Cytogenetic Dose Estimation in the Criticality Accident in Tokaimura Lecture Module 13.
IAEA International Atomic Energy Agency EPR-Public Communications L-013 Roles and Coordination of Information.
IPEN : Ciencia y tecnología para la competitividad INSTITUTO PERUANO DE ENERGÍA NUCLEAR - IPEN FINDINGS AND PRELIMINARY RESULTS ON THE VENTANILLA ACCIDENT.
INCIDENT AND EMERGENCY CENTRE Department of Nuclear Safety and Security IECIEC.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 PREPAREDNESS AND RESPONSE FOR RADIOLOGICAL EMERGENCY IN JAPAN Masashi Kanamori Nuclear Emergency Assistance & Training Center Japan Atomic Energy Agency.
Emergency Exposure Situations Developing a National Capability for Response to a Nuclear Accident or Radiological Emergency Requirements for Infrastructure.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
Basic Survey: External dose estimation Radiation Medical Science Center for the Fukushima Health Management Survey, Fukushima Medical University The International.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Bulgaria.
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
1 The experience of the Republic of Belarus in the field of safe and secure transport of radioactive material. R. Astashka, Z. Kronava, A.Prykhodzka, I.Tkachonak.
IAEA School of Drafting Regulations Transportation regulations in Republic of Latvia Radiation Safety Centre (RSC) Marcis Slavinskis Vienna, 3-14 November.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
New safety and security requirements for the transport of nuclear and other radioactive materials in Hungary Tünde KATONA, Kristóf HORVÁTH, József SÁFÁR.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Technical Services.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Sr. Col. Van Mui Nguyen, Sr. Col. Xuan Kien Nguyen, Sr. Col. Van Cu Ho, Sr. Col. Trung Son Nguyen, Sr. Col. Minh Hieu Nguyen et al Military Institute of.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Department for Nuclear and Radiation Safety of the Ministry for Emergency Situations (Gosatomnadzor) Leading specialist Diana Rusakevich Belarus Department.
IAEA International Atomic Energy Agency Radiation protection of the public IAEA Regional Training Course on Radiation Protection of patients for Radiographers,
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
IAEA International Atomic Energy Agency IAEA Safety Standards and Public Exposure to Radon Trevor Boal Radiation Protection Unit - NSRW.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
„ZONE 2010“ Opening Exercise Col. Eng. Ivan Koleňák MoI-Directorate General of the Fire Rescue Service of the Czech Republic.
2011 Pan American Health Organization Módulo NUCLEAR EMERGENCY IN JAPON 30 March 2011 Pablo Jiménez Regional Advisor in Radiological Health NUCLEAR.
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Technical Services. Objectives To identify the technical services needed within the infrastructure for an effective implementation of regulatory programme.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Training Module Preparation for “AERB norms, licenses and signage”
Director, Environmental Assessment & Control Directorate
Civil protection system in Latvia (Munipalicity of Riga)
School of Drafting Regulations Transportation regulations in
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
Regional Workshop on Establishing a National Strategy for
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
Occupational Radiation Protection during High Exposure Operations
Vesa Tanner European Commission Directorate-General Energy
Training Courses for RPOs
Nuclear Power in Jordan
Communication and Consultation with Interested Parties by the RB
Director, Environmental Assessment & Control Directorate
USNRC IRRS TRAINING Lecture18
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Nuclear Emergency Planning and Preparedness
Legal and Regulatory Framework for Nuclear Installations in IRAN
Nuclear Emergency Planning Chinese Experience
Occupational Radiation Protection during High Exposure Operations
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

JCO CRITICALITY ACCIDENT Masashi Kanamori Nuclear Emergency Assistance & Training Center Japan Atomic Energy Agency 11601-13 Nishi-jusanbugyo, Hitachinaka, Ibaraki、JAPAN 311-1206 1

CONTENTS ■ Outline of the criticality accident ■ Criticality accident ■ Emergency environmental radiation monitoring ■ Criticality termination work ■ Countermeasures taken by the related organizations ■ Environmental radiation monitoring after the accident ■ Radiation doses ■ Lessons from the accident and re-arrangements of emergency  preparedness in Japan 2

Outline of the criticality accident 3

Outline of the criticality accident ■ Criticality accident occurred on September 30, 1999, at the JCO   conversion facility at Tokai-mura. ■ The facility was in the operation for the re-conversion of enriched uranium. ■ The excursion continued for nearly 20 hours ,and the total number of fissions during the criticality accident was estimated to be 2 x 1018. ■ 167 residents were asked to evacuate , and about 310, 000 residents were asked not to leave their homes. ■ This accident was rated as level 4 on INES scale. 4

5

Criticality accident 6

Criticality accident ■ Criticality accident occurred on September 30, 1999, at 10:35 am, at the JCO conversion facility which was in the operation for the re-conversion of enriched uranium. ■ The three workers had used the powdered uranium (U3O8), which is 18.8%enriched-uranium, and dissolved them in the stainless steel container. Concentration of uranium nitrate solution is about 370gU / l. ■ On September 30, 1999, at 10:35 am, the 7th solution in a stainless steel container was poured into the precipitation tank and the solution exceeded the critical mass limit lead to the criticality accident. ■ The precipitation tank was not geometrically safe for criticality. So criticality accidents would occur if much more than the criticality mass was poured. 7

■The excursion continued for nearly twenty hours ,and the total number of fissions during the criticality accident was estimated to be 2 x 1018. ■ Exposures were mainly from direct radiations, some rare gases and radioactive iodine were released into the environment, but the effect was small. ■The two workers who received doses of 16 ~ 25GyEq and 6 ~ 9GyEq died. Another worker whose dose was estimated to be between 2 ~ 3GyEq is still living. ■ As the tank and the building were not damaged, most of the fission products were confined in the tank. ■167residents within a range of 350 meters from the criticality tank were evacuated. About 310, 000 residents within a 10km range were asked by the governor not to leave their homes. 8

Time series at the initial stage after the criticality accident (30 September,1999) 10:35 The 7th solution in a stainless steel container was poured into the precipitation tank and the solution exceeded the critical mass limit, so criticality accident occurred. 10:43 JCO notified to fire station of Tokai-mura, saying “This is JCO, 3 workers were down at the conversion facility (“facility”was abbreviated.), please take them to the hospital in ambulances immediately.” (In Japanese, the pronunciation of “conversion” is the same as that of “epilepsy”.) 10:46 The rescue team(3persons) arrived at JCO, but they did not know the situation of the accident, so they had any protective measures for radioactive materials. 11:15 JCO notified to STA, saying “Criticality accident possibly occurred.” 9

11:34 JCO notified to Tokai-mura government. 11:40 JCO detected 0.84mSv/h(γ) at the site boundary and informed to STA. 11:52 Sufferers(3 workers) were moved to the hospital by the ambulances. 12:15 Tokai-mura government set up Accident Response Headquarters. 13:55 STA recommended Ibaraki-ken, government that residents near the site remain indoors . 14:30 STA set up Accident Response Headquarters. 15:00 Central government set up Accident Response Headquarters. 15:00 The Mayor of Tokai-mura recommended that residents living within a 350 m of the JCO plant evacuate. 10

JCO Co Ltd. Tokai-mura Criticality accident JAEA 1km Joban Freeway National Route 6 JR Tokai Sta. JAEA 1km 30km Tokai-mura 11 11

JCO Tokai works JCO Tokai Works National Route 6 12 12

13 13

Precipitation tank 14 14

Precipitation tank 15 15

Situation of work near the tank 6-9 GyEq 2-3 GyEq When the criticality occurred, one of three workers engaged saw a “blue-white glow” and were seriously exposed to radiation. Average dose to the whole-body for workers, Worker-A: 16-25 GyEq Worker-B: 6-9 GyEq Worker-C: 2-3 GyEq 16-25 GyEq 16 16

Sketch of precipitation tank drawn at initial stage of the accident JNC TN8440 2001-018 JCO臨界事故の終息作業について より引用 17 Sketch of precipitation tank drawn at initial stage of the accident 17

Memorandum based on the hearing results of operator(8:30~10:00p.m.) 18 18

Emergency environmental radiation monitoring 19

Radiation dose around the site ● : neutron   ○: γ 20 20

Radiation dose around the site (Sep.30,10:00 ー Oct.1,7:00) 9/30 10/1 1.0 空間線量の時間変動from安全委 0.1 0.01 21 21

Points of monitoring posts 10 km 8 km 6 km ● 4 km ● 2 km ● ● JCO ● ● ● ● 22 22

23 23

γ-ray measurement results (10:45a.m.) The installation place of 60Co irradiation institution 24 24

The 4th γ-ray measurement results The installation place of 60Co irradiation institution 25 25

Dose measurement results The site boundary and circumference surveillance zone of processing plant 26 26

Neutron measurement results (17:05p.m.) 27 27

Neutron measurement results 28 28

Criticality termination work 29

Stages of criticality termination work The termination work was performed in three stages: [1] Polaroid photography and preparation, [2] water drainage, [3] addition of boron solution. 30

in criticality termination work  Policy of dose control in criticality termination work ■The basic concept was prepared based on the ICRP recommendations and  Japanese regulations. ■Based on the Japanese regulations, the radiation dose limit for employees is 50mSv and the dose limit for emergency exposure situations is 100mSv. ■ It seemed difficult to manage doses under 50mSv, so doses up to 100mSv were considered acceptable. ■The Nuclear Safety Commission agreed with this policy of doses objectives. 31

View of conversion-building (about 11:00p.m.) 33 33

Progress of the accident 0.001 0.01 0.1 1 10 12 14 16 18 20 22 2 4 6 8 Time  γ- Dose Equivalent Rate (mSv/h) at γ area monitor in 1st fac. 9/30 10/1 Draining Ar Pursing B Pouring Accident occurred. 34 34

35 35

Draining of the cooling water from the tank 36 36

Route of boric acid to the precipitation tank 37 JNC TN8440 2001-018 Route of boric acid to the precipitation tank 37

Pouring of boric acid to the precipitation tank 38 38

Piling up sandbags for shielding 39 39

Countermeasures taken by the related organizations 40

Time series of criticality accident including countermeasures taken by the related organizations (30 September,1999) 10:35  Criticality accident occurred. 10:43  JCO notified to fire station of Tokai-mura 11:15  JCO notified to STA. 11:34  JCO notified to Tokai-mura government. 11:40  JCO detected 0.84mSv/h(γ) at the site boundary and informed to       STA. 11:52  Sufferers(3 workers) were moved to the hospital by the       ambulances. 41

12:15 Tokai-mura government set up Accident Response Headquarters. 14:30  STA set up Accident Response Headquarters. 15:00  Central government set up Accident Response Headquarters. 15:00  The Mayor of Tokai-mura recommended that residents living within a 350 m of the JCO plant evacuate. 17:05  Radiation dose (n) of 4.0mSv/h was detected near the site boundary. 20:30  Central government set up Local Accident Response Headquarters at JAERI site. 21:00  Accident Response Headquarters(Head: Prime Minister) was       established. 42

22:30 Ibaraki-ken, government recommended that residents within       a 10 km of the site remain indoors . 23:15  It was concluded that the cooling water was drained from the jacket surrounding the precipitation tank. ( 1 October,1999) 2:35~6:04  The work to drain the cooling water from the jacket of the precipitation tank was carried out. 6:15  The removal of the cooling water from the jacket of the precipitation tank was carried out by forcing the Argon gas. 6:30  The radiation dose (n) was lowered to the undetectable level. 8:19~8:39  Boric acid was poured to the precipitation tank. 43

44 44

Countermeasures for residents Evacuation: ■On September 30, at 3:00PM, the Mayor of Tokai-mura recommended that residents living within a 350 m of the JCO plant evacuate. ■The number of persons to evacuate is 161persons(Tokai-mura) and 6persons(Naka-machi). ■Evacuation continued till October 2, at 6:30PM. Sheltering: ■On September 30, at 10:30PM, Ibaraki prefectural government recommended that residents within a 10 km of the site remain indoors . ■The number of persons to remain indoors is about 310,000persons(Tokai-mura, Cities and towns near Tokai-mura) ■Sheltering continued till October 1, at 2:30PM 45

Evacuation for residents (Sep.30 ,15:00 - Oct.1,18:30) Evacuation 161Persons (Tokai-mura) 46 46

Sheltering (Sep.30, 22:30 - Oct.1,14:30) Sheltering 310,000persons 47

Environmental radiation monitoring after the accident 48

Radiation doses(n,γ) after the accident μSv/h 49 49

Environmental radiation monitoring Neutron, γ-ray (described above) γ-dose rate by released radioactive materials: 0.24 μGy/h (West 8km) Detected activated products (AP) and fission products (FP) : Na-24, Mn-56, Sr-91, I-131, I-133, I-135, Cs-138 AP/FP concentration in environmental samples:    negligible value - maximum concentration of I-131 at the site boundary:     (1.6-44)x10-9 Bq/cm3 << 1x10-5 Bq/cm3 (limit value) - maximum concentration of I-131 in Vegetables (excluding root crop and potato) :                  0.037 Bq/g <<2 Bq/g (Indices about ingestion restrictions of food and drink prescribed by nuclear safety commission) 50 50

Environmental monitoring 51 51

Radiation survey of residents 52 52

2) Exposures were mainly from direct radiations.) Results of monitoring 1) Some rare gases and radioactive iodine were released into the environment, but the effect was small. 2)  Exposures were mainly from direct radiations.) 53 53

Radiation doses 54

Estimation of radiation dose ・Estimation of radiation dose of 3 workers   - premonitory symptom (vomiting, diarrhea, nausea, trouble of consciousness) - decrease of lymphocyte - check of chromosome - measurement of Na-24 value in blood ・Estimated radiation dose of 3workers Worker-A: 16-20 GyEq Worker-B: 6-10 GyEq Worker-C: 1-4.5 GyEq 55 55

Employees whose dose was actually measured Doses results (1) November 8, 2000 Category People Notes Employees 172 Employees whose dose was actually measured Employees involved in tasks when the accident occurred 3 16~25GyEq or more(Died on December 21, 1999) 6.0~9GyEq(Died on April 27, 2000) 2~3GyEq(Discharged from the National Institute of Radiological Sciences on December 21, 1999) Employees involved in drainage of water, etc. 18 Detected by whole-body counters, individual dosimeters, etc. Their collective range was 3.8~48mSv(effective dose equivalent). Employees involved in injection of boric acid into the tank 6 Detected by dosimeters, etc.  Their collective range was 0.7~3.5mSv(effective dose equivalent). Other employees at the site during the accident 49 Detected by whole-body counters and film badges. Their collective range was 0.6~48mSv(effective dose equivalent). Employees whose dose was estimated 96 Estimated according to location-based radiation dose evaluations and the individual behavior survey conducted by JCO.  Their collective range was 0.06~17mSv(effective dose equivalent). 16~20 or more 6.0~10 1~4.5 0.6~47.4 0.06~16.6 56 56

Doses results (2) Persons involved in disaster-related tasks November 8, 2000 Category People Notes Persons involved in disaster-related tasks 260 Persons whose dose was actually measured Government-related organizations(Staff of JAERI and JNC) 57→56 Of 206 whose dose was measured by film badges or TLD, exposure was detected on 56. Their collective range was 0.1~9.2mSv(effective dose equivalent). Fire-fighters (involved in rescue tasks related to the accident) 3 Detected by whole-body counters. Their collective range was 4.6~9.4mSv(effective dose equivalent). Persons whose dose was estimated Self-government bodies related persons 167 Estimated by the behavior survey.  Their collective range was 0.0002~7.2mSv(effective dose equivalent). State related persons 8 Estimated by the behavior survey.  Their collective range was 0.49~2.1mSv(effective dose equivalent). Information medium related persons 26 Estimated by the behavior survey.  Their collective range was 0.014~2.6mSv(effective dose equivalent). 57 57 57

Doses results (3) Residents Category People Notes 234 November 8, 2000 Category People Notes Residents 234 Persons whose dose was actually measured 7 Detected by whole-body counters. Their collective range was 6.7~16mSv(effective dose equivalent). Persons whose dose was estimated Living or Working persons 199 Estimated by the behavior survey.  Their collective range was 0.01~21mSv(effective dose equivalent). Momentary staying persons 28 Estimated by the behavior survey.  Their collective range was 0.01~3.8mSv(effective dose equivalent). 58 58

Lessons from the accident and re-arrangements of emergency preparedness in Japan 59

Lessons learned from the criticality accident ■ Initial responses and communications ■ Authority, responsibility and decision making ■ Radiation measurements and medical responses ■ Regulatory Systems 60

Establishment of the various systems ■ The Special Law of Emergency Preparedness for Nuclear Disaster was enacted in December 1999. ■ The Basic Plan for Emergency Preparedness was revised clarifying roles and responsibilities of the related organizations. ■ An OFC would be designated in a case of emergency as the base for implementing responses. ■ JAEA/NEAT is expected to assist the staff of the OFC as the designated public organization. 61

Legislation in the Special Law of Emergency Preparedness for Nuclear Disaster ■ Assignment of Off-site center ■ Designation of the special nuclear disaster preparedness officer ■ Implementation of nuclear emergency exercises ■ Nuclear emergency plans for nuclear industries ■ Establishment of adequate radiation monitoring systems 62

Actions defined by law Article-10: Disaster preparedness manager shall inform the competent minister, governor and local authorities of the defined incidents. Article-15: In the case of a nuclear disaster the competent minister shall report the situations to the Prime Minister who will in turn declare a disaster. Article-15 Article-10 0.05-0.1 μSv/h (normal dose rate) 5 μSv/h 10 min 500 μSv/h 10 min 63

Organizational arrangements for nuclear emergency response ■ The organizational arrangements in nuclear emergency preparedness in Japan are provided by the Laws. ■ OFC would play an important roll in the negotiations with the related organizations. ■ The government have established the NEAT to fulfill these activities effectively for assisting the OFC. 64

Organizational arrangements for nuclear emergency response Nuclear Emergency Response Headquarters Chairman: Prime Minister Cabinet Office METI MEXT Ministry of Defense Fire and Disaster Management Agency National Police Agency Nuclear Safety Commission ● ● Organization related to disaster preparedness       Police           JNES       Fire Station      NIRS       Self-Defense Forces NUSTEC Local Nuclear Emergency Response Headquarters ● ● Off-site Center The Joint Council of Nuclear Disaster Countermeasures Technical support NEAT Center Headquarter of prefecture Headquarter of cities, towns, villages License Holder 65

Off-site center information Local Government Evacuation Sheltering   Central Government Specialists Radiation Protection advice Public advice information information instruction Nuclear Safety Commission Nuclear Company Monitoring Specialists NEAT 66

Off-site center and NEAT center Off site center(22 places in Japan)   Fukui branch office of NEAT Center (Fukui Prefecture) NEAT Center(Ibaraki Prefecture) is technical assistance base of JAEA 67

Exercises planned by central and local governments ■ Many kinds of exercises and drills are conducted by the related organizations. ■ These exercises are integrated as a full-scale national exercise which is planned and carried out every year. ■ This scheme is shown in the figure on next page . ■ The staff of NEAT attends these exercises and provide technical support by dispatching specialists and providing special vehicles, etc. 68

Over view of annual exercises in Japan Purpose and Feature Cabinet Ministries NISA OFC Local Gov. Annual exercise for all the relevant parties One selected prefecture, with evacuation of residents, Decision maker (utterance based) Full-scale National Exercise Scenario, narrative based stimulated Partial National exercise Prefectural Exercise Annual Prefectural Exercise (one prefecture a year, organized by the prefecture) OFC Drill Mainly decision making process in the Off Cite Center, partial exercise Disaster specialist Drill Disaster specialists drill who have to lead OFC activities Drill for the relevant transport groups Transport Accident Drill Exercises for the facilities regulated by MEXT MEXT Exercise MEXT Exercise Basic training for every function of the full scale National Exercise Basic Training, 69 Exercise for large scale earthquake on DP Day DP Day government exercise DS:Disaster specialist

Legal role of JAEA at nuclear emergency  ■ Designated Public Organizations - Basic Law on Emergency Preparedness  ■ Dispatch of experts and Supplying special equipments   ‐Basic Plan for Emergency Preparedness  ■ NEAT Center is the disaster response support base facilities of JAEA-Nuclear Disaster Countermeasures Manual 70

■ We are continuing to improve the systems in emergency Future issues ■ Functions of Emergency related organizations will continue to be tested in emergency exercises. ■ We are continuing to improve the systems in emergency preparedness and response in Japan. ■ The knowledge gained by the various organizations mentioned above can then be shared with other Asian counties. ■ The IAEA plays an important roll in providing funds and opportunities. ■ It is also important to further our research on such issues as RDD and consolidate our recovery phase programs. 71

Thank you for your attention. 72