Perspectives on the further safety enhancement of the NPPs with WWER reactors in response to Fukushima Daiichi accident Presented by SNRIU|SSTC NRS (Ukraine)

Slides:



Advertisements
Similar presentations
1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
CRP on Natural Circulation Phenomena, Modelling and Reliability of Passive Safety Systems that Utilize Natural Circulation September, 2007, IAEA,
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
ACADs (08-006) Covered Keywords Components, functions, operation, Auxiliary feedwater, Startup, hot standby, plant cooldown, emergency. Description Supporting.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
Safety Features at KKNPP Insight of. Location: The Kudankulam is located on the coast of the Gulf of Mannar, at 25 kM to the north- east from Kanyakumari,in.
IAEA International Atomic Energy Agency Lessons Learned from the Tailored IRRS Module on Regulatory Implications of the Fukushima Accident Presentation.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Energy for the Future Belene NPP Design Features May, 2008 Riviera Holiday Club, Varna, Bulgaria Jordan Georgiev BNPP Manager.
ROSATOM STATE ATOMIC ENERGY CORPORATION “ROSATOM”
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
SAFETY OBJECTIVES FOR GENERATION III NPP APPLIED TO EPR DESIGN OPTIONS PRESENTATION 26 – 29 September 2010, Nesebar, Bulgaria WATTELLE Emmanuel IRSN, France.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
How they work and what happened at Fukushima Daiichi Plant.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June 2011 LICENSING PROCESS FOR BELENE NPP: CURRENT STATUS AND NEXT STEPS Tinko Ganchev Head of Department.
AREVA: Steps towards a global leadership in the energy industry
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
Improve nuclear safety and reduce environmental impact – international and national practice Roundtable “Environmental Safety: Scientific and Technical.
Nuclear Thermal Hydraulic System Experiment
V. Kim, V. Kuznetsov, G. Balakan ‑ South-Ukraine NPP, Ukraine G. Gromov, A. Krushynsky ‑ Analytical Research Bureau of SSTC NRS S. Sholomitsky, I. Lola.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Long-term loss of all AC power supply sources for Belene NPP November 1, 2015 Reliability, Safety and Management Engineering and Software Development Services.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Natural Convection as a Passive Safety Design in Nuclear Reactors
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT OF NEW NUCLEAR POWER PLANTS 1.IRSHAD NURHAKIM BIN NORAHIM (ME088151) 2.LEE SZE TENG (ME087909)
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
I Overview of EU-APR1400 II Design Concept of Safety Systems III
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
Plant & Reactor Design Passive Reactor Core Cooling System
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
T. Steinrötter, M. Kowalik, H. Löffler, M. Sonnenkalb, I. Bakalov
Approach to Practical Elimination in Finland
The Revision of WENRA Reference Levels and their Implementation
Complementarity of deterministic and probabilistic approaches
Practical experience of the Russian VVER design organization in the use of PSA for verification of compliance with single and double failure criteria.
IVR Design and Safety Demonstration of Advanced NPPs in China
Review of the upgraded severe accident mitigation strategies for the generation II PWRs in France foreseen in the framework of plant life extension International.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Presentation to the EPREV Lessons Learned Workshop
Federal Environmental, Industrial and Nuclear Supervision Service
Session Name: Lessons Learned from Mega Projects
Severe accident management at Paks NPP
IAEA International Conference on Topical Issues in Nuclear Installation Safety, 6-9 June, 2017 Investigation of performance of Passive heat removal system.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
New Regulatory Requirements in Japan
Presentation transcript:

Perspectives on the further safety enhancement of the NPPs with WWER reactors in response to Fukushima Daiichi accident Presented by SNRIU|SSTC NRS (Ukraine) on behalf of the Forum WWER at Convention on Nuclear Safety 2012 Extraordinary Meeting Forum of the State Nuclear Safety Authorities of the Countries Operating WWER Type Reactors

2 Key facts about WWER Forum WWER Forum established in 1993, 11 members and observers from GRS and IAEA Objectives:  to provide the network of chief nuclear safety regulators with WWER for exchanging experience  to discuss, harmonize and develop the common approach for relevant safety issues

3 WWER Forum combines regulators supervising:  54 WWER units in operation (39,59 GWe)  14 under construction Working methods: annual high level meetings supported by topical Working Groups IAEA. Reference data series No. 2, Nuclear Power Reactors in the World (31 DEC. 2011) Key facts about WWER Forum

4 Targeted safety re-assessment (stress tests) All WWER-operating countries re-assessed NPP robustness as a short-term measure in response to Fukushima event:  EU WWER countries (Bulgaria, Czech Republic, Finland, Hungary, Slovak Republic) and Ukraine performed stress tests in compliance with ENSREG specifications and participated in respective peer review process  Russian Federation performed stress tests in compliance with ENSREG specifications and Armenia is in the process  China and India performed comprehensive targeted safety re-assessment in a stand alone manner (in India scope has been similar to EU stress tests)

5 Overview of the stress-tests results  Stress-tests have not revealed any significant external hazards or their combinations that have not been considered in the initial design and/or in SARs/PSRs  WWER plants are reliable to ensure safety functions:  WWER-440, very large design safety margins, robust components, high redundancy of safety systems, large water inventory in primary and secondary sides  WWER-1000 (Gen II), design and safety systems comparable to PWR’s of the same generation  WWER-1000/AES-92, AES-2006 (Gen. III+) new designs with enhanced inherited safety features, wide use of passive safety tools  Since their first start-up, all operating WWER plants have implemented a number of safety measures that have further increased reliability of the safety functions  Additional prompt measures have been implemented immediately after Fukushima accident

6 Safety functions Three main safety functions have to be provided for an extended time under all hazardous conditions  reactivity control  decay heat removal  containment of radioactive material Enhanced back-up to the original power supply systems has to be provided for safety functions at operating WWERs

7 Reactivity control Original design features Implemented measures Further upgrades (SBO conditions) Gen II WWER designs (ref. WWER-1000) scram (control rods) high boron concentration HPIS ( 3x100%, 40 g/kg) HPIS ( 3x100%, 16 g/kg ) make up system after containment isolation (HPIS back up) high boron concentation HPIS + small DG ( boron water injection to primary circuit to compensate LOCA through pump seals and prevent re-criticality on long term heat removal) New WWER designs increased number and efficiency of the control rods ensure subcriticality in long term also at low temperatures (< 100 °C) passive high concentration boron injection system

8 Decay heat removal Original design features Implemented measuresFurther upgrades (SBO or/and HS loss) Gen II WWER designs primary heat removal by same system as in LB LOCA (3x100% ECCS) secondary heat removal (2x100% AFWS, 3x100% EFWS) primary F&B secondary F&B “super” EFWS using diesel driven pumps (WWER-440) passive SG make up (after pressure relief) from FW tank SG make up from fire-fighting trucks SG make up from mobile sources New WWER designs Passive core flooding system (HA-II), additional closed-loop SG cooldown system (2x100%), passive system in secondary circuit (4x33%), steam condensing by air flow

9 Examples of the implemented measures (Rivne 1&2, South-Ukraine NPP)

10 Containment of the radioactive material Original design features Implemented measures Further upgrades Gen II WWER designs large containment with spray system containment with bubble condenser (WWER-440) Severe accident management tools were not considered in the original plant design special system for large primary to secondary leak management hydrogen management containment filtered venting instrumentation for severe accident conditions RPV ex-vessel cooling (WWER-440) measures on severe accident management at ex- vessel phase (WWER-1000 under consideration) New WWER designs Double containment, annulus passive filtering system, passive containment heat removal system, containment hydrogen monitoring and catalytic recombination systems, core catcher with passive heat removal

11 Examples of the implemented measures (Loviisa 1 & 2) 1. Primary system depressurisation 3. Hydrogen control Ice condenser doors Recombiners Glow plug improvement 4. Containment pressure control External spray 2. Melt retention within pressure vessel Inlet valves Steam outlet Lowering the neutron shield Debris removal 5. Containment isolation Manual actuation as back-up Monitoring of leak-tightness Leakage control 6. Severe accidents instrumentation & control

12 AC power as support for safety function Original design features Implemented measures Further upgrades (SBO conditions) Gen II WWER units emergency power supply system ( 3x100% or 4x100%) common-unit DGs at site increase of the battery capacity, optimizations of the consumers list interconnection between on-site power supply sources various off-site power supply options mobile power sources (small portable DGs, powerful mobile DG station – already implemented at some plants) improving reliability of fixed on-site power supply (diverse cooling of DGs)

13 2 MW MDG in Novovoronezh NPP MDG in Kozloduy NPP Examples of the implemented measures

Advanced systems in new WWER plants New WWERs have adequate built in systems to withstand prolonged loss of power as well as loss of UHS: long term cooling of the reactor core without AC power, long term decay heat removal that is not relying on primary ultimate heat sink, and protection of reactor containment integrity after potential core meltdown accident Safety systems (passive HAs + passive heat removal system) allow to avoid core damage even in case of Large Break LOCA in coincidence with SBO

Atmospheric air Hot air Reactor Steam generator Filters PHRS Hydrogen recombiners Annulus Passive filtration draft pipes Separate passive system maintains vacuum in the annulus and filters possible radioactive leaks from inner containment The passive heat removal system is intended for long- term removal of the reactor residual heat when there are no sources of power supply; it can operate both with the intact reactor coolant system and when leaks of reactor coolant occur The system consists of four independent (4x33%) loops for natural circulation of the secondary coolant Each loop has air ducts for passive removing of decay heat to the atmosphere, and direct-action passive devices that control the air flow rate Passive decay heat removal from SGs (NVNPP-2)

16 Further challenges from regulatory point of view reinforcement of current regulations to extend the design basis with severe accident management provisions improvement of the technical features and infrastructure to respond effectively to severe accidents that may affect multiple units for extended periods ensuring synergy between safety and security

17 Conclusions Fleet of WWER units has a robust inherent design features which have been further substantially improved during last two decades. Additional ‘immediate’ actions have been implemented shortly after Fukushima event. Fukushima accident provides insights for further safety strengthening of old WWER plants and for extending the scope of issues to be addressed in new designs Extended measures should be continually taken to encourage all countries to improve their compliance with IAEA standards and follow transparency and openness principles