LESSONS LEARNT ON THE BASIS OF ACCIDENT INQUIRY REPORTS OF COMMISSIONER OF RAILWAY SAFETY (ENGINEERING CASES)

Slides:



Advertisements
Similar presentations
FOCUS POINTS FOR SITES TO IMPLEMENT TOWARDS BOILER TUBE FAILURES PREVENTION (Actionable points for site based on failure analysis ) SCOPE: BOILER PRESSURE.
Advertisements

MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
SUPERVISOR RESPONSIBILITIES Who’s Accountable For Employee Safety And Health? THE SUPERVISOR!
Co-Teaching as Best Practice in Student Teaching Conclusion 1.
Drawings for an Oyster Strainer and Drain Pan This design of strainer is required in AOAC International (953.11) for use in determining the drained.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Environmental Assessment Survey of School Building.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
Fire Protection Upgrades at New Brunswick Laboratory Lessons Learned on an ASME NQA-1 Design Build Project Alexander C. Smith, PE.
2014 WEA Conference Seismic Design of Wine Tanks.
ACCIDENTS SITE MANAGEMENT AND ENQUIRIES. AUTHORITY The ACCIDENT MANUAL notified by the Zonal Railway Administration.
Great Lakes Dredge & Dock Company, LLC Improving Safety & Health
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
DENT 1200 Dental Materials I
Important considerations & contributions of flourishing shipbuilding industries in Bangladesh Khairul Hassan Doctoral student Maritime Engineering, Kyushu.
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
CONSTRUCTING A FIVE CABIN LATRINE
1-1. Key Sanitation condition No. 1:  Safe supply for water that contacts food and food contact surfaces;  Safe water supply for production of ice; and.
Accident Train 61 Passengers 12 Amtrak employees 1 Fatality 3 Serious injuries 43 Minor injuries.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
How to sustain Quality Improvement activities over time
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
Safety & Health Programs.
Pre Incident Planning and Related Loss Reduction Strategies
SAFETY AND LICENSING OF SPENT FUEL STORAGE AND TRANSPORT-Safety issues within spent fuel transport by AREVA Stéphane BRUT François DERLOT Laurent MILET.
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
Maintenance of LWR/CWR
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
G. Wehmeier EHS Lampertheim Loss Prevention and Safety Promotion in the Process Industries Praha 2004 Evaluation of safety instruction system.
LESSONS LEARNT ON THE BASIS OF ACCIDENT ENQUIRY REPORT OF CRS ( LEVEL CROSSINGS )
Mohammed Al-khwyldi  Introduction Safety is the condition of being protected against physical, social, political, emotional, educational or other.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Quality and Operations Management “Guiding Philosophies of Deming, Juran, and Crosby”
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
KEYS Keys to Enhance Your Supervisory Success Taking Disciplinary Action.
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
MCM#6 Pollution Prevention/Good Housekeeping Part 1 Municipal Facility Management.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Protective Clothing. Objectives To understand the proper protective equipment to be used in the Ag mechanics Lab.
Click to edit Master title style Click to edit Master title 1 1 ISM Best Practices Workshop September 12, 2006 David Smith Office of Corporate Safety Analysis.
OSHA Office of Training and Education
Excavation & Trench Safety
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Flash penetrations through roofs and walls.
CLEAN UP & INSPECTION.
Monitoring, Review and Audit of OHS&E
EAG346-Sem II 2014/2015 Lesson 2.
Residential Wall Systems
Who is Liable for a Construction Accident?
Who is Liable for Crane Accidents at Construction Sites?
CONCRETE FORMWORK Formwork.
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
تكملة الوحدة الاولى الفصل الثاني بالكتاب للاطلاع ثم الفصل الثالث التخطيط لبناء الاختبارات التحصيلية الفصل الثالث من الكتاب (87-164)
Residential Wall Systems
Please read this before using presentation
STEEL PLATES.
IMPORTANT NOTE TO CONSTRUCTION MANAGERS
Power Point Presentation Courtesy By: Association of Railway P
Presentation transcript:

LESSONS LEARNT ON THE BASIS OF ACCIDENT INQUIRY REPORTS OF COMMISSIONER OF RAILWAY SAFETY (ENGINEERING CASES)

INTRODUCTION WHY STUDY ACIDENT REPORTS? CAUSE - EFFECT RELATIONSHIP

ACCIDENT TYPES LWR DISTORTION RAIL/WELD FAILURES TURNOUT/SEJ FAILURE ACCIDENT AT CONSTRUCTION SITE SLOPE FAILURES/OTHERS

LESSONS LEARNT FROM LWR/SWR DISTORTION UPKEEP OF FITTINGS GAP SURVEY AND ADJUSTMENT TRACK CONSOLIDATION S/R AT FISH PLATED JOINTS IN LWR DFFICIENT BALLAST DESTRESSING

LESSONS LEARNT FROM RAIL/WELD FAILURES EFFECTIVE USFD TESTING ZERO MISSING FITTING CHECK MOULD DIMENSIONS PRESENCE OF WELDING SUPERVISOR DEFECTIVE WELDS R ails manufactured only with clean steel, vacuum degassing and hydrogen content limited to 3 ppm to be accepted by railway.

LESSONS LEARNT FROM TURNOUT/SEJ FAILURE SEJ layouts USFD testing Procurement of components/fittings from one source only Renewal/Reconditioning of points and crossings

LESSONS LEARNT FROM ACCIDENTS AT CONSTRUCTION SITE Suitable strong barrier Night working Controlled access to work site Caution order Site order book

LESSONS LEARNT FROM ACCIDENT DUE TO SLOPE FAILURES Meteorological department Proper slopes, berms, catch water drains, toe walls to be ensured Adequate monsoon patrolling SR in case of deficiency noticed

CONCLUSION Climate of safety based on knowledge, competence, discipline and ethical conduct