Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Nuclear Accident in Japan: A Summary
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Assessing the Challenges Resulting from the Events at Fukushima Daiichi Nuclear Power Station A Preliminary Discussion March 25, 2011 Walter L. Kirchner.
FUKUSHIMA, DESCRIPTION OF THE ACCIDENT AND CONSEQUENCES TO THE ENVIRONMENT Dragoslav Nikezic Faculty of Science, University of Kragujevac, Serbia
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Incorporated Administrative Agency Japan Nuclear Energy Safety Organization 1 Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa.
Nuclear Accident at Fukushima Daiichi NPP A collection of images and data by Toro Laszlo Member of the Council of the RSRP National Institute of Public.
Safety Features at KKNPP Insight of. Location: The Kudankulam is located on the coast of the Gulf of Mannar, at 25 kM to the north- east from Kanyakumari,in.
Module 08 Module 08Fukushima Dai-ichi Accident Vienna University of Technology Atominstitute Stadionallee 2 A-1020 Vienna,
Sea Fukushima Dai-Ichi: Status before the Earthquake Units 1, 2, and 3 operate at full power. Steam produced by water boiling in the reactor vessel flows.
ACADs (08-006) Covered Keywords BWR, main steam, piping and instrument drawing, functional operating sketch, flowpath, interrelationships, safety relief.
Jed Harrison Office of Radiation & Indoor Air.  Review the Incident – What Happened  Describe the EPA Response  Review EPA’s RadNet Monitoring System.
Nuclear Plant Systems ACADs (08-006) Covered Keywords
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
How they work and what happened at Fukushima Daiichi Plant.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Nuclear Accident at the Fukushima Dai-ichi NPP June 2, 2011 Embassy of Japan in Bulgaria.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
Kevin Burgee Janiqua Melton Alexander Basterash
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Thermal Hydraulic System Experiment
Nuclear Power Plant Accidents Reporters: Uyangurin, Mareinne L. Suico, Monica Sharlyn L. Waresa, Daryl Mae B.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Nuclear Power Plant Meltdown Zach, Luke, and Nick.
Nuclear Power. Fission Uranium-235 Plutonium-239 Neutron 10n10n 10n10n 10n10n Strontium-90 Xenon-144.
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Nuclear Power Plant Orientation
Fukushima Power Plant – Japan Post March 11, 2011
Agenda Background Update on Fukushima Daini Update on Fukushima Dai-ichi – Summary of Events at Fukushima Dai-ichi Summary of Radiation and Reports.
0 Overview of Fukushima-Accident Analysis ERMSAR 2012, Cologne (Germany) March 21 – 23, 2012 JNES Masanori FUKASAWA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Workshop Information IAEA Workshop City, Country XX - XX Month,
Ta’Juan Dutrieuille November 4, 2009 Period 1
Nuclear Power Plant How A Nuclear Reactor Works.
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
IAEA International Atomic Energy Agency Occupational Radiation Protection during High Exposure Operations Lecture 2-2 Lessons Learnt from Occupational.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Coal-Fired Plant Coal is conveyed to boiler In primary water loop, water is boiled into steam Steam is sent through turbine Turbine spins the generator,
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
Plant & Reactor Design Passive Reactor Core Cooling System
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
The March 2011 Earthquake and Tsunami in Japan: A Nuclear Perspective Mary Lou Dunzik-Gougar, PhD Associate Chair of Nuclear Engineering and Health Physics.
INTRODUCTION TO NUCLEAR TECHNOLOGY MEHB513 SEM 2,2014/2015 GROUP PROJECT : EVALUATE THE IMPACTS OF THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT.
Generator Operation. Video of Generator synchronizing.
BASIC PROFESSIONAL TRAINING COURSE Module XV In-plant accident management Case Studies Version 1.0, May 2015 This material was prepared by.
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
The Fukushima Daiichi Incident – Dr
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
NRC Event Number – Event Date
Session Name: Lessons Learned from Mega Projects
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
The Fukushima Daiichi Incident – Dr
The Fukushima Daiichi Incident – Dr. Matthias Braun - 05 April p.1
Japanese Nuclear Accident And U.S. Response
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
The Fukushima Daiichi Incident – Dr. Matthias Braun - 22 April p.1
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
The Fukushima Daiichi Incident – Dr. Matthias Braun - 01 June p
New Regulatory Requirements in Japan
Presentation transcript:

Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011

Operating condition before the Earthquake Unit 6 Type : BWR-5 (GE/Toshiba) Out Put : 1100MWe Commercial operation :1979 Plant Condition : Outage Unit 5 Type : BWR-4 (Toshiba) Out Put : 784MWe Commercial operation :1978 Plant Condition : Outage Unit 2 Type : BWR-4 (GE/Toshiba) Out Put : 784MWe Commercial operation :1974 Plant Condition : Operating Unit 3 Type : BWR-4 (Toshiba) Out Put : 784MWe Commercial operation :1976 Plant Condition : Operating Unit 4 Type : BWR-4 (Hitachi) Out Put : 784MWe Commercial operation :1978 Plant Condition : Outage Unit 1 Type : BWR-3 (GE) Out Put : 460MWe Commercial operation :1971 Plant Condition : Operating

Summary of Tohoku-Kantou Earthquake ② Pacific Ocean plate ④ Philippine Sea Plate ① ③ ④ ② 11 th March 15:08 After shock (M 7.5) ③ Eurasian plate ① North American plate 11 th March 15:25 After shock (M 7.4) 11 th March 14:46 Main shock (M 9.0) Estimated Epicentral Erea 11 th March 15:15 After shock (M 7.3) Fukushima 1st NPP Tokai 2nd NPP

Overview of Incident Sequence (Initial phase) 11 th March Turbine was tripped and Reactor(Unit 1, 2 and 3) was Scram due to Earthquake Transmission Lines were failed due to Earthquake LONP(Loss of Normal Power ) was happened (Emergency Diesel Generators Automatically Started ) 14:46 All of Emergency Diesel Generators were tripped (due to Tunami??) SBO(Station Black Out -Loss of All Alternative Power) was happened 15:41 Declared Site Alert due to SBO15:42

Significant Damage of Intake Structures due to Tumami Before Tunami Attack Unit 1 Unit 2 Unit 3 Unit 4 Unit 1 Unit 2 Unit 3 Unit 4

Schematic Diagram of BWR4’s Core Cooling Systems Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

Immediately after the earthquake (Under Loss of Normal Power) Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

After The Tumami Attack (Under the Station Black Out) Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

Under the Station Black Out (Primary Containment Vessel Venting) Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

Completely Loss of Coolant Injection Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

Sea Water Injection from Fire Protection System Feed Water Line Main Steam Line Containment Cooling Pump Core Spray Pump Sea Water Pump High Pressure Core Injection Pump Condensate Storage Tank SRV Emergency Bus Emergency Diesel Generator Hx Fire Protection Sys From Normal Supply Vent Line Stack

Overview of Incident Sequence (Progress phase) 1/2 11 th March Unit 1 Unit 2 Unit 3 Unit 4 16:36 Declared Loss of ECCS 01:20 PCV *1 Pressure Abnormal Rising 12 th March 14:30 PCV Venting 15:36 Reactor Building was destructed due to hydrogen explosion 20:20 Started Sea Water Injection to Reactor Core Reactor water level was maintained by HPCI * 2 system powered DC battery *1 PCV : Primary Containment Vessel *2 HPCI : Hi Pressure Core Injection System During Maintenance Outage Fuel Assemblies were in Fuel Pool

Overview of Accident Sequence (Progress phase) 2/2 Unit 1 Unit 2 Unit 3 Unit 4 13 th March 05:10 Declared Loss of ECCS 09:20 PCV Venting 13:12 Started Sea Water Injection to Reactor Core 11:01 Reactor Building was destructed due to hydrogen explosion 14 th March ~11 Reactor Building Blowout Panel was 0pened due to hydrogen explosion 13:25 Completely loss of coolant injection (Failed HPCI sys) 17:17 Started Sea Water Injection to Reactor Core 06:10 hydrogen explosion at near by S/C under PCV Venting?? 06:14 Reactor Building was destructed due to hydrogen explosion 15 th March

Significant Damage of Reactor Buildings due to hydrogen explosion Unit 1 Unit 2 Unit 3 Unit 4

Bird‘s Eye View of Typical BWR-4 Rector Building Fuel Pool Spent Fuel Primary Containment Vessel (PCV) Reactor Pressure Vessel (RPV) Suppression chamber Spent Fuel Main Steam Tunnel

Trend of Radiation Dose ① Fukushima City ② Koriyama City ③ Shirakawa City ④ Aizuwakamatsu City ⑤ Minami Souma City ⑥ Iwaki City ⑦ Tamura City ① ② ⑥ ④ ⑤ ③ ⑦ 30km 50km 100km /143/153/163/173/183/193/20 3/213/223/23 3/24 3/25 3/263/273/293/283/303/314/01 Radiation Dose Rate (μSV/h) Date Fukushima 1 st NPP Tokyo ~200km

The current situation and near future measures in Fukushima 1 st NPP -Reactors and spent fuel pools are continuously cooled by cooling water injection from the outside. -Radiation dose levels in outside of the NPP tends to decrease. -However, the contaminated water overflowing from the reactors and spent fuel pools have been leaking through Turbine Buildings and piping trench to the sea. -Continuous cooling of Reactors and Spent fuel pools -Reduce the additional release of radioactivity -Transfer to the contaminated water from Building and Structure to the existing or temporary storage tanks -Establishment of a closed loop Reactors and Spend fuel pools cooling system by the existing or temporary systems