3 rd Quarter Contractor Business Meeting September 9, 2011 Mike Kehoe Plant Engineering Facilities Session.

Slides:



Advertisements
Similar presentations
Job Hazard Analysis I. Speaker’s Notes:
Advertisements

UCOP Incident Reporting April 2009 UCOP Safety Meeting.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
4th Quarter Contractor Business Meeting November 4, 2011 Mike Kehoe Plant Engineering Facilities Session.
1st Quarter Contractor Business Meeting March 9, 2012 Mike Kehoe Plant Engineering Facilities Session.
Child/Youth Protection Policies and Procedures. Let the little children come to me, and do not hinder them, for the kingdom of heaven belongs to such.
Assisting Passengers with Disabilities and Emergency Situation Training Course.
The Broken Arrow Chamber of Commerce Beautification Committee And The City of Broken Arrow.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Crane Operations Objective
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
4th Quarter Contractor Business Meeting December 14, 2012 Mike Kehoe Plant Engineering Facilities Session.
Crane and Hoist Training
Cranes, Hoists and Truck Hoists
109 Civil Engineer Support Equipment SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC.
1st Quarter Contractor Business Meeting March 13 th, 2015 Yesika L. Kain/Ben Mulherin Plant Engineering Facilities Session.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
4th Quarter Contractor Business Meeting December 5 th, 2014 Yesika L. Kain Plant Engineering Facilities Session.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
S-271 Helicopter Crewmember Slide 7D-1 Unit 7D Operational Safety - Lesson D: Parking Tender and Miscellaneous Roles and Responsibilities.
INDUCTION. WELCOME 1 st Call prides itself on the our quality of candidates and wants to ensure that all our people are safe in any environment that.
Safety and Loss Control
Contractor Safety Programs Ron Scholtz- REA, CHMM April 8, 2008.
1 Successful Compliance Reviews for Industry - First-hand perspective from a Safety Investigator Keith Kerns Member of CVSA International Safety Team Safety.
The most precious commodity in your organisation?
A basic knowledge of all laws and regulations pertaining to your exposure is a requirement for entering upon and working on a mine property. If you are.
Incident Reporting Procedure
3nd Quarter Contractor Business Meeting September 14, 2012 Mike Kehoe Plant Engineering Facilities Session.
Process Safety Management
Hazard Communication Training Program “Right-to-Know” Program.
Standard 29 CFR Part Hazard Communication.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
4th Quarter Contractor Business Meeting January 9th, 2014 Yesika L. Castro-Hernandez Plant Engineering Facilities Session.
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
4/1/20101 Contractor Management of Change: Implementation of Vehicle and Equipment Spotting Pre-Task Analysis Card Start Date: May 2010 Texas Operations.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Job Hazard Analysis.
Hazard Communication Presentation Presented by: Western Assurance Corp Desert Utility & Paving, LLC and Century Club Construction, LLC Design © 2005, 2012.
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
HunterDouglas VPP TRAINING.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
2nd Quarter Contractor Business Meeting June 8, 2012 Mike Kehoe Plant Engineering Facilities Session.
Facilities Incident Notification. Reporting Requirements All employees are required to report immediately any incidents, accidents, or major equipment.
NASA JSC David T. Loyd Safety and Test Operations Division
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Valley City State University Policies and procedures for reporting incidents that occur on campus or while working for VCSU and the State of North Dakota.
Lock out / Tag Out The Control of Hazardous Energy.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Emergency Action Plan What to do in the event of an emergency.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Incident Reporting And Investigation Program
Investigation Procedures
Maintaining Safety Standards
Weather Decision Procedure Director of Operations
Who is Responsible for Overhead Crane and Hoist Operations
Maintaining Safety Standards
Lifting & Rigging Continuing Education Fourth Quarter 2016
Assisting Passengers with disabilities
12 Passenger Van Safety Training
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Incident Reporting And Investigation Program
Safety is part of our culture at Halliburton
Union College Utility Cart Safety Program
Cranes and Hoists Standard 29 CFR Part
Golf Cart and Company Vehicle Training
Presentation transcript:

3 rd Quarter Contractor Business Meeting September 9, 2011 Mike Kehoe Plant Engineering Facilities Session

Agenda –OASIS Transition to Exostar – O55, Chris Goush –Yard Cleanliness –Requirements for reporting a spill –New process for submitting MSDS information – S-1032, Rev. A –Pre-task plans –Lift plans –Contractor crane briefing class - September 15 –Crane accident reporting, X36, Jimmy Shearn –Vehicle Safety – EH&S, O27, Rod Taylor 2

OASIS Transition to Exostar 3 Newport News Shipbuilding will be transitioning from the Northrop Grumman Oasis System to EXOSTAR. Target for transition completion is mid November.

Yard Cleanliness Great effort was made in preparation for Hurricane Irene. Much appreciated. Clean worksites are safer. Expectations are high that we will maintain level of cleanliness. NAVSEA 08 audit begins September 11,

Requirements For Reporting a Spill All spills are to be immediately called in to the Communications Center. The Communications Center phone number is IMMEDIATE notification is required to avoid Notice of Violation (NOV) or fine. 5

Submitting MSDS Information Newport News Shipbuilding Procedure S-1032, Rev. A – Approval and Use of Hazardous Materials Submittal process of MSDS has changed. –PAST: Contractors submitted information directly to EH&S, Dept. O27 –CURRENT: NNS Contractor Coordinators shall submit the appropriate material requests (NN Form 9453) to EH&S, Dept. O27 on behalf of the contractor 6

Pre-Task Planning All projects are to have pre-task plans. Review plan with work crew before commencing the work Important to evaluate your work area Identify potential hazards Review required PPE (Personal Protective Equipment) Describe work to be performed, hazards associated with each step, and how to eliminate or control the hazard Work crew sign off Contract Coordinators/Field Engineers should audit pre-task plans. 7

Pre-Task Planning 8

Lift Plans Yard-wide Lifting and Handling Requirements for Departments working with contractors. Lift plans are required for all suspended loads. This includes loads suspended from forklifts, backhoes, etc. Lift plan issues and accident reporting apply to rigging applications as well as crane work. Take two. Take time to review the lift plan, equipment and rigging. After the job is hooked up and the rigging is snug, stop before you lift and do a second check or a ‘take two’ to ensure everyone is really ready and the travel path is clear. Remember: ANYONE is authorized to stop the lift when conditions are questionable. 9

Contractor Crane Briefing Class Mandatory for all contractor crane operators before performing lifting and handling operations. Attendance of riggers is recommended but optional. Scheduled only 1 day each month in B Class size is limited to 15. Next class is scheduled for September 15, 2011 E- mail to to sign up for Attendance records are maintained. Not required to attend more than once. 10

Crane Accident Reporting CRANE ACCIDENT DEFINITION: –An accident occurs when any one or more of the six elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in the following. a) Personnel injury or death. Minor injuries that are inherent in any industrial operation, including strains and repetitive motion related injuries, shall be reported by the normal personnel injury reporting process of the activity in lieu of these requirement. b) Material or equipment damage c) Dropped load d) Derailment e) Two-blocking f) Overload g) Collision/including unplanned contact between the load, crane and/or other objects. 11

Crane Accident Reporting In the event of a crane accident, as a contractor you must: –Stop work immediately and secure the site! Do not alter the scene of the accident unless it is necessary for the safety of personnel or property!!!! –Call *911 (from Shipyard phones) or (from cell phones) for emergency assistance, if needed. –Call to report the accident to the Facilities Service Desk. The Facilities Service Desk will notify the Newport News Crane Accident Response Team. –Keep all persons not involved with the accident away from the area. Make sure that anyone who was involved or has knowledge of the accident remains near the area. Involved personnel must remain on-site until released by the Crane Accident Response Team, even if it means working past the end of their shift. –Wait for the Crane Accident Response Team to arrive. 12

Contractor Crane Operator Requirements The crane operator is responsible for ensuring a safe lift and shall never make a lift that he or she feels is improperly or insufficiently rigged. The operator must confirm that any personnel hooking on to the crane or signaling the operator are qualified. 13

Safety Mandatory compliance to Shipyard regulations. Pedestrians must use available crosswalks, sidewalks, designated walkways. Effective August 1, 2011 the following requirements apply to all motor vehicles, including personal vehicles when operated on shipyard property: –Motor vehicles used to transport personnel, such as cars, trucks and Mules, must have firmly attached, designated seats for all passengers. –Anyone operating or riding in/on a motor vehicle must use a seatbelt if one was provided by the manufacturer. If seatbelts have been removed, for whatever reason, they must be reinstalled. –Employees are no longer allowed to ride in the back of a pickup truck or any other type of motor vehicle. All materials must be secured to prevent them from falling off or dragging from the vehicle. 14

QUESTIONS???? If you have questions regarding this presentation, please contact your Contract Coordinator or: Mike Kehoe O41 – Plant Engineering