Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
How e-cloud effect affects the ILC DR Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Progress of the BEPCII Injection System Kang Wen.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
18-20/12/2007 ILC Damping Ring R&D Mini-workshop, KEK, Japan Vacuum Design vs. e-cloud Oleg B. Malyshev ASTeC Daresbury Laboratory.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
SR Vacuum Systems and Front Ends
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
1.3GHz Input Coupler for ILC
Plans for in-situ coating with a robotic mole at BNL Ady Hershcovitch 1, Michael Blaskiewicz 1, Wolfram Fischer 1, H. Joseph Poole 2, Mark Erickson 2,
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
SPS coating studies 28 February, 2016TE-VSC1 Present situation of the development of e-cloud mitigation methods -MD 2011 results -Carbon coating of dipoles.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
Development of X-band 50MW klystron in BVERI
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
R. Kersevan, TE-VSC-VSM 30/06/2016
CEPC Vacuum System Dong Haiyi 2017/11/5.
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
XFEL Collimation and Beam Switchyard Vacuum Issues
Electron Clouds at SLAC
CEPC Vacuum Systems Design Consideration
Presentation transcript:

Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006

Contents 1. Characteristics of BEPCII Vacuum System 2. Vacuum Chamber 3. TiN Coating of Vacuum Chambers 4. RF Shielding Bellows 5. Photon Absorbers 6. Installation and Leak detection of Vacuum System 7. In-vacuum wiggler 8. Summary

1.Characteristics of BEPCII Vacuum System To meet the need of beam lifetimes more than 10 hours, the dynamic pressure is lower than 5  Torr; To reduce the interaction of photoelectrons and secondary electrons with positron beam, the chambers of positron ring will be made into antechambers and coated by Titanium nitride on its inner surface; Copper absorbers and masks are used to prevent synchrotron radiation from falling on vacuum chambers,bellows and welding;

Distribution of the vacuum devices in a quadrant

2.Vacuum Chamber  Aluminum alloy 5083-H321 is chosen as the arc vacuum chamber material.  In the straight sections, the vacuum chambers are fabricated from 316LN stainless steel, Al-alloy(Al-5083-H321) and Al- alloy(Al-6061).  Standard stainless-steel conflat flanges with copper gaskets are used due to its reliability.

The vacuum chamber consists of the upper and lower pieces. The two pieces made by an oil-less machining process to improve the contour precision and reduce the outgassing rate, are welded together. Half of Arc Chamber

Leak Detecting and Baking Test for Antechambers

Pumping Down for Antechamber (Thermal Outgassing Rate: 3.3  Torr·I/s·cm 2, Ultimate Pressure : 5  Torr)

Vacuum Testing for Straight Vacuum Chamber (316LN stainless steel)

Vacuum Testing for Straight Vacuum Chamber (Al-6061) Pumping Slot

2.Vacuum Chamber (cont.)  All the arc chambers(80 units) have been tested, which ultimate pressure is less than 5  Torr.  10/40 straight chambers(s.s.), 19/25 straight chambers(Al-6061) and 16/52 straight chamber(Al-5083-H321) have been pumped down and reached the design pressure.

3.TiN Coating of Vacuum Chambers  The inner surface of the positron ring vacuum chambers will be coated with  100 nm of Titanium Nitride (TiN) in order to minimize the secondary electron yield (SEY) and thus avoid the so-called electron clouds instability caused by electron multipacting.  TiN coating of the positron vacuum chambers has been done by using DC sputtering, and all the arc chambers(40 units) of positron ring have been coated TiN, TiN-coating of the straight chambers is being prepared.

The Vacuum Chamber Bakeout Before TiN Coating

Discharge Characteristics of DC sputtering Cathode Potential: 1250 ~ 1300 V Process Pressure: 1.5 ~ 1.7 × mbar Gas Composition: 70% Ar — 30% N 2 Current Density: 1.0 ~ 1.1 × A/cm 2 Time to Discharge: 6 ~ 8 hours

Color is due to three factors: Thickness, stoichiometry, and structure. Films deposited at low energy tend to have porous columnar structure, which traps light and water. These appear dark gray or black. This is not necessarily a problem, except that the film may be somewhat gassy. Gold color does not guarantee low yield. BEPCII TiN-coated Samples

SEY measured in KEK

SEY of BEPCII TiN-coated samples measured in SLAC

Electron Energy (eV) SEY SEY of BEPCII TiN-coated samples measured in Shanghai Fudan University

Analysis of TiN Coating Property The measurement results of BEPCII TiN-coated samples Ti/N ratio: SEY: <1.95 TiN film thickness: nm Coating adhesion: good

4. RF Shielding Bellows All the RF bellows including 9 kinds of types have been sent to IHEP. There has been a leak detection for every RF bellows, only one of 180 RF bellows had a leak. Heating tests for RF bellow prototypes have been done by using microwave power. Expansion and contraction of RF bellows, hydraulic pressure test of cooling channels have also been done for a part of RF bellows. Four RF bellows have been connected to vacuum chambers in situ.

Fingers: Shield-Finger + Spring-Finger Spring-Finger : Inconel alloy Contact-Finger: CuBe (C1720) Max. Contraction : 18 mm Max. Expansion : 6mm Offset : ±2 mm Bend: ±50 mrad Tilt: 0 Double-Fingers RF Bellows (VALQUA LTD.)

“ PLS ” type RF Bellows (AnZ Corp.) 1.Structurally strong and flexible (offset: ±5 mm) 2. Functionally stable and reliable 3. Smooth inner surface 4. Low broad band impedance 5. Long operation

Setup of Heating Test for RF shielding Bellows We carried out the heating test using a MHz microwave which are used for the BEPC RF cavities. The TEM mode of the coaxial transmission line is very suitable for the test because the wall current has only an axial component, in principle, just like a real wall current.

Temperature rise of contact fingers as a function of input powers for two kinds of RF shielding Bellows Peak wall currentRMS wall currentPeak wall current density RMS wall current density Peak electric field at wall 58.1 A6.1 A355.8 A/m37.4 A/m 1.34  10 5 V/m BEPCII

RF Bellows

5. Photon Absorber The absorbers are made of oxygen free copper and have a direct cooling water system. According to the shapes of the cross section, the absorbers had been divided into 10 serials which include 49 kinds of types. The hydraulic pressure difference and flow quantity is measured for one of every kind of type absorber. There are the hydraulic pressure test and leak detection for every absorber. 132/175 absorbers have been produced, most of which have been installed inside the vacuum chambers.

Photon Absorbers As there will be the dedicated SR mode and the colliding mode in double rings, the absorbers will be designed with two faces to accept the synchrotron radiation produced by the electron and the positron, respectively. In addition, in order to reduce the synchrotron radiation density of impinging on the face of the absorbers, the face is sloped at 22.5°grazing incidence angle. The rectangular absorber is located near BPM to increase the cutoff frequency.

Max. temperature:192 ℃, Max. temperature on cooled wall:111 ℃, Max. thermal stress: 85Mpa, Max. distortion: 0.69mm.

Milling V-shape Groove of Absorber

Preparation of Absorber Brazing in the hydrogen furnace

Testing of the hydraulic pressure difference and flow quantity

6. Installation and Leak detection of Vacuum System 70/80 arc vacuum chambers have been installed with ion pumps, NEG pumps, TSP,BPM and photon absorbers. All the components on the arc chamber have been detected for leak and preserved in a vacuum condition. The rectangular conflat flanges with copper gasket have been connected in situ.

TSP NEGP The pumping system of Half Cell

Rectangular Flanges Connection

7. In-vacuum wiggler One of the main difficulties for fabricating in- vacuum wiggler is how to achieve the ultra-high vacuum in the situation of the large outgassing rates produced by the permanent-magnet blocks. The static pressure of 4  Torr has been achieved by coating TiN on the permanent-magnet blocks and the reasonable pumpdown techniques.

The Pumping Configuration of In-vacuum Wiggler

In-vacuum Wiggler Bakeout

Pumpdown Process of In-vacuum Wiggler

Overall Vacuum Quality Control Each components that will be installed in vacuum system are cleaned strictly and detected for leak, which leak rate is less than 2  Torr · L/s. The special vacuum devices such as injection kickers, RF superconducting cavities and beam monitors, have been tested due to vacuum requirements, and a pressure of less than 5  Torr has been achieved. A detailed installation procedure of vacuum devices has been established, especially be careful of anything that did not belong to the vacuum system were left inside the vacuum chambers.

8. Summary All the arc vacuum chambers have been fabricated and tested, and TiN coating of the arc chambers had also been completed. SEY of all the TiN-coating samples is less than 2.0. The mass production of straight vacuum chambers is still critical path. All kinds of vacuum pumps, gauges, valves and RF bellows have been sent to IHEP and tested. Most of photon absorbers have been produced and tested, the progress of fabrication of absorbers may match with that of installation of vacuum chambers. Installation of vacuum system is smooth, 70/80 arc vacuum chambers have been installed with pumps,BPM and photon absorbers. 4 RF bellows and 6 rectangular flanges have been assemblied in situ.