12 Month Report on WP2: Tsunami source characterisation Nearest 12 Month Meeting Marrakech, October 25-26, 2007 WP Leader:

Slides:



Advertisements
Similar presentations
Work Plan Development Guidelines and Schedule.
Advertisements

TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
Seismic Stratigraphy EPS 444
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MARSITE - ISTANBUL. MARSITE started on November 1 st, It is a three-year project. MARsite has been funded for about 6M€. The first months are dedicated,
Monthly Composites of Sea Surface Temperature and Ocean Chlorophyll Concentrations These maps were created by Jennifer Bosch by averaging all the data.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Work on GEOSTAR included ESONET LIDO - Demo Mission: the Cadiz node INGV activities D. Embriaco, G. Marinaro, G. Giovanetti, S. Monna, G. Cianchini, M.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Copyright © Optim Inc. and University of Nevada John N. Louie University of Nevada, Reno Satish Pullammanappallil Bill Honjas Optim Inc.
NEAREST kick-off Meeting 9-11 October, Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali.
PROMESS 1 PARTNERS 1- Institut Français de Recherche pour l’Exploitation de la Mer (Ifremer)France 2- Istituto di Geologia Marina – CNR-IGMItaly 3- British.
FFCUL, PORTUGALBologna Oct 2006 NEAREST Coordinator: Maria Ana V Baptista NEAREST PARTNER - FFCUL PORTUGAL.
Welcome Juanma Ormazabal (entrepreneur) from Aceros Ormazabal company (steel)
NEAREST WP5.- Data Integration/ Integrated Tsunami Detection Network: LEADER: UGR PARTNERS INVOLVED: FCCUL, IM, CNRST, UGR Marrakech Meeting 25 and 26.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
NEAREST 2nd year Meet ing – Berlim 8 -9oct 08 WP7 Modelling of tsunami impact in SW Portugal Berlim 8-9 October 2008 NEAREST FFCUL Rachid Omira Maria Ana.
NEAREST PROJECT PARTICIPANT N° 10 Institut National de Géophysique Centre National pour la Recherche Scientifique et Technique (CNRST) (CNRST) in collaboration.
USGS – GeoPRISMS Synergistic Opportunities: Offshore Atlantic Margin Debbie Hutchinson Jason Chaytor Matt Arsenault Greg Mountain Ginger Barth Jon Childs.
IberArray A broadband transportable array to investigate the lithospheric structure of the Iberian Peninsula Antonio Villaseñor Institute of Earth Sciences.
Lina Williams Budget & Financial Analyst Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, April 28 th, 2015.
Laura Beranzoli Istituto Nazionale di Geofisica e Vulcanologia October 5-7, 2009ESONET NoE - 2nd All Region Workshop WP4 – Demonstration Missions.
DPC High-resolution multi-disciplinary monitoring of active fault test-site areas in Italy S5S5S5S5 Roma 24/03/ 2010 S5 Project High-resolution.
ASTRONET Coordinating Strategic Planning for European Astronomy T HE N ETWORKING.
SW-PBIS Cohort 8 Spring Training March Congratulations – your work has made a difference Cohort 8.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
FFCUL, PORTUGALBologna Oct 2006 NEAREST Coordinator: Maria Ana V Baptista NEAREST PARTNER FFCUL PORTUGAL.
WP1 WP1 - Tsunami sources Identification WP1 - Tsunami sources Identification FFCUL group Marrakesh, Oct
Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.
Please insert a figure in the master transparency. KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association.
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Comparison of the different proposed sources for the 1755 Lisbon tsunami: modeling in the West Antilles. Jean ROGER, M.A. BAPTISTA, H. HEBERT ITS 2009,
ISMAR-BO, ITALY SIXTH FRAMEWORK PROGRAMME PRIORITY Contract n (GOCE) NEAREST Integrated Observations from NEAR shore sourcES of Tsunamis:
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Nearest - WP2 30 months Progress Report Nearest 30 Months Meeting Brest, April 2-3, 2009 Task 2.2 Wide-Angle Seismic cruise.
SPICE Research and Training Workshop III, July 22-28, Kinsale, Ireland Seismic wave Propagation and Imaging in Complex media: a European.
Other Tectonic Rifts: the Woodlark-D'Entrecasteaux Rift, Papua New Guinea Geoffrey Abers, Boston University Thanks to: A. Ferris (BU), S. Baldwin (Syracuse),
Following the suggestion of the NEAREST Project leader, to invite several partners to a Workshop in Rabat in order to integrate Moroccan input into the.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 14 th 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
District Collaboration Grant Requirements November 17, 2015.
Lorito et al. 2011, Nature From tsunami and geodetic data Trehu/Tryon Chile May 2012 Science objective: Monitor the response of the outer accretionary.
NEAREST Kick Off Meeting Bologna, 09/10/2006 WP2 Tsunami source characterisation.
SW-PBIS Cohort 10 Spring Training & Celebration February and March 2016.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Welcome Plans for the day Key milestones progress Meet interim report requirements Update on communication with social partners Identify any problems.
New bathymetric data (Marion Dufresne July 2008).
An initiative of the International Rare Diseases Research Consortium-IRDiRC Spanish Rare Diseases Registries Research Network - SpainRDR
Barcelona 8th-9th May 2008 NEAREST 2nd mid-year meeting Introduction.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
NEAREST FFCUL WP7 Modelling of tsunami impact in SW Portugal
Waunakee Public Library
NEAREST FFCUL WP7 Modelling of tsunami impact in SW Portugal
Laura Beranzoli Istituto Nazionale di Geofisica e Vulcanologia
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
2013 Terex HR Process Timetable (1st half)
SPR&I Regional Training
AMICI WP1 – Management, coordination and dissemination
MONITORING, DETECTING AND WARNING OF TSUNAMIS
MONTHS OF THE YEAR January February April March June May July August
Aurora Hoxha & Drini Imami
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

12 Month Report on WP2: Tsunami source characterisation Nearest 12 Month Meeting Marrakech, October 25-26, 2007 WP Leader:

Overall objective Characterisation of the tsunami source areas based on definition of the seismic structure to relate earthquake and tectonic structures, specially deep decollement surfaces Starting point State of knowledge concerning location, geometry and characteristics of main active, potentially tsunamigenic faults identified in the area based on WP1 tectonic map. Existing data : MCS legacy data acquired in the last ~15 years in the area (especially IAM, Rifano, SISMAR, and SWIM) Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Objective and starting point Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3

(1)Mapping deep crustal and upper mantle structure to test geodynamic models; (2)Determining crustal-scale geometry of main fault surfaces accommodating plate convergence; (3)Relocating local seismicity that will be recorded in WP3, relate earthquake activity and tectonic strain; (4)Constraining physical properties of structural domains and tectonic features. Goals Workplan 1)Re-process key MCS profiles across most relevant structures until pre-stack depth migration; 2)Acquire, process and model new WAS data along “some” profiles combining OBS and landstations. Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Workplan and goals Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Progress towards objectives Meetings: BARTOLOMÉ, R., GRÀCIA, E., RUBIO, E., DAÑOBEITIA, J.J., TERRINHA, P., AND SWIM-2006 CRUISE PARTY, (2006). New multichannel seismic data imaging of the western part of Gulf of Cádiz (SW Iberian Margin): The SWIM-2006 cruise. Third EUROMARGINS Conference, Bologna (Italia), 4-7 October (Poster). MARTÍNEZ, S., GRÀCIA, E., BARTOLOMÉ, R., TERRINHA, P., BIROUK, A., DAÑOBEITIA, J.J., SALLARÈS, V., and SWIM-06 CRUISE PARTY (2007). Tectonics of the Coral Patch Ridge area and adjacent Horseshoe and Seine Abyssal Plains (Gulf of Cadiz) based on new multichannel seismic data. 1st Moroccan Association of Petroleum Geologists Conference, Marrakech (Morocco), October. Staff: A graduate student (Sara Martínez) to realize a PhD thesis on SWIM MCS/Nearest WAS data A graduate student (Sergi Ventosa) to develop signal processing filters adapted to WAS data A post-doc will be to work with Nearest MCS/WAS data (?) Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3

Task 2.1 Reprocessing and pre-stack depth migration of existing MCS data Nearest 12 Month Meeting Marrakech, October 25-26, Kickoff Meeting: Pre-selected key profiles from IAM, Rifano, SISMAR, SWIM to be (re-)processed until PSDM Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 CSIC personnel : E. Gràcia, S. Martínez R. Bartolomé, V. Sallarès Progress towards objectives

SWIM-2006Survey Nearest 12 Month Meeting Marrakech, October 25-26, 2007 CSIC concentrated on SWIM-06 data acquired in June 2006 (PI E. Gràcia). RB, SM have pre-processed 16 profiles Task 2.1 Activities SM focused on SW08-SW16 across the Coral Patch Ridge and active structures of Seine and Horseshoe Abyssal plains RB focused on SW01-SW07 crossing the Horseshoe fault to the accretionary wedge and lineation 1 Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Progress towards objectives

Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.1 Activities 4 profiles have been selected for PSDM : SW2, SW7, SW13, SW16 This is being done now in Geomar within EU-LSF program Progress towards objectives

Active Fault Map of the Gulf of Cadiz (WP1 modified) REVERSE FAULTS: Horseshoe F: 95 km Marques Pombal F: 50 km Sao Vicente F: 100 km Guadalquivir F: 110 km STRIKE-SLIP FAULTS: Lineation N F: 125 km Lineation S F: 160 km HF MPF SVF GF LN LS CPRF

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.1 Activities Université de Bretagne Occidentale (UBO) : Providing a database of processed and time-migrated MCS lines of Sismar and DelSis surveys. Three were PSDM (Sis-4, Sis-16 and Sis-22) Providing HR (Chirp) data from the DelSis survey ; Acquire and provide new HR (sparker) data on the SW Spanish and NW Moroccan platforms (July-Aug 2007, NOMADS cruise, PI P. Leroy) Other? Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.1 Barchart Task\Month Task 2.1 Provisional D4 Task 2.1 Actual D4 D4 : Prestack depth-migrated MCS profiles Ok for CSIC on SWIM Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 WP3 Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.2 Wide-angle reflection/refraction acquisition experiment Application for R/V Hesperides and funding from Spanish agencies for a WAS cruise sent in August 2006  Acquisition of three ~200 km WAS lines with ~25 OBS Application granted in November 2006 and dates confirmed in May 2007  18 days: between Oct 16th and Nov 2nd, 2008 Nearest-Seis 2008 Survey Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 CSIC personnel : E. Gràcia, S. Martínez, S.Ventosa, R. Bartolomé, V. Sallarès Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Progress towards objectives (1)Application for 20 Geomar OBS (60 deployments) sent to EU-LSF in May 2007  Failed : money runout Task 2.2 Activities Getting OBS? (2)Bid to acquire Spanish OBS pool started in February 2007  Ok : 17 Scripps L-Cheapo SP OBS should be ready (?) by June 2008 Nearest-Seis 2008 Survey (3)UBO applied for UBO/Ifremer OBS  Ok : 7 UBO + 17 Ifremer MicrOBS reserved for Nearest-Seis… But… budget for insurance, shipping, technicians is lacking ! Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 WP3

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 (4)Possibility of renting Geomar (or GeoPro) OBS explored  20 OBS/60 deploy cost ~120 k€ Task 2.2 Activities Getting OBS? Nearest-Seis 2008 Survey (5)Possibility for sharing rental expenses with Geomar explored  Add scientific value to Nearest: go into FWT in one profile (?) (6)Other (ex. FCUL)? Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.2 Barchart Task\Month Task 2.2 Provisional D5 M3 Task 2.2 Actual D5 M3 D5 : Cruise report M3 : End of processing and experiments at sea Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Task 2.3 Processing, modelling and interpretation of wide-angle seismic data Activity Barchart Task\Month Task 2.3 Provisional D6 M4 Task 2.3 Actual D6 M4 D6: Velocity and density models M4: End of OBS modelling Sergi Ventosa developed two filters (polarization and lateral coherency-based) to enhance S/N in WAS data Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Progress towards objectives

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Planning Year 2 Activitiy summary table 2.1A0 Interpretaton of SWIM MCS profiles CSIC (E.Gracia, V. Sallares)From November 2007 on 2.2A1 Close inventory of OBS available for cruise CSIC (V. Sallares) UBO (M.-A. Gutscher) ISMAR (N. Zitellini) FCUL (L. Matias) March A2 End of PSDM migration of MCS data CSIC (E.Gracia, V. Sallares) UBO (M.-A. Gutscher) ISMAR(?) April A3 Collection of PSDM migrated MCS profiles CSIC (E.Gracia, V. Sallares) UBO (M.-A. Gutscher) ISMAR(?) May A4 Final discusion/decision on Nearest-Seis WAS profiles and personnel involved in the cruise CSIC (E.Gracia, V. Sallares) UBO (M.-A. Gutscher) ISMAR (N. Zitellini) FCUL (L. Matias) May A5 Analysis of SISMAR OBS data CSIC (V. Sallares)June A6 Source design for Nearest- Seis CSIC (V. Sallares)July A7 Preparation/testing of material for Nearest-Seis survey CSIC (V. Sallares)September A8 Nearest-Seis surveyCSIC (V. Sallares)October 2008

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 Planning Year 2 Critical aspects : Selection of PSDM profiles must be closed. CSIC > SWIM, UBO > SISMAR. What about Rifano and IAM? We must ensure having enough OBS to perform the experiment (minimum 20; ideal 40). Preferable not having many different types > logistical complications, limited spacing WAS profiles must be selected Possible obstacles : Not having (enough) OBS. Poor acquisition results (weather conditions, other...) Special notes : We propose to organize the next (18 month) meeting next May in Barcelona to discuss about cruise planning

Nearest 12 Month Meeting Marrakech, October 25-26, 2007 Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3 1)Meeting with TopoIberia team leader J. Gallart (CSIC- Barcelona), who is deploying a BB network in SW Iberia  Sharing data recorded by BB OBS (Nearest) and landstation (TopoIberia) networks? CSIC WP3 Activities WP3

CSIC WP3 Activities Nearest 12 Month Meeting Marrakech, October 25-26, )Participated in MVSEIS MCS survey with 4.5 km streamer of L’Atalante (IP L. Somoza) in September 2007 to ensure shooting over BB network  Not allowed to go North from 36º! WP3 Objective Workplan Progress General Task 2.1 Task 2.2 Task 2.3 Planning Y2 WP3