DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane The Jlab UV FEL Driver ERL.

Slides:



Advertisements
Similar presentations
Matching Injector To Linac. Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine –
Advertisements

The JLab IR/UV FEL Driver D. Douglas for the JLab FEL anarcho-syndicalist commune.
Driver Accelerator Physics and Design D. Douglas, S. Benson, G. Krafft, R. Li, L. Merminga, B. Yunn.
ILC Accelerator School Kyungpook National University
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Longitudinal Matching, or How to move things around by a hairs-width at the speed of light….
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Driver Accelerator Design D. Douglas, G. Krafft, R. Li, L. Merminga, B. Yunn.
The Jlab UV FEL Driver ERL
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Aperture Considerations in the FEL Upgrade Accepted design process –generate design  known –set aperture = N  + W N typically 4 to 6 W is “beam handling.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Introduction to ERLs C. Tennant USPAS - January 2011.
Thomas Jefferson National Accelerator Facility 1 of 20 Distribution State A “Direct” Injection D. Douglas, C. Tennant, P. Evtushenko JLab.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
Thomas Jefferson National Accelerator Facility 1 of 35 Distribution State A “Operational” Beam Dynamics Issues D. Douglas, JLab.
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Design Requirements/Issues Source/Injector Performance -successful run of 135 pC -DC photocathode gun: cathode lifetime >600 C; GaAs wafer > 2 kC Delivery.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane The Jlab UV FEL Driver ERL.
DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane The Jlab UV FEL Driver ERL.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 Optics Issues for Recirculating Linacs D. Douglas E  E  E  E  E  E 
“The WBS 3 Talk” Scope of work: beam physics support for –injector –IR Demo analysis for upgrade guidance –upgrade design and analysis (specification &
DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane The Jlab UV FEL Driver ERL.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Christopher Gerth DL/RAL Joint Workshop 28-29/4/04 Modelling of the ERLP injector system Christopher Gerth ASTeC, Daresbury Laboratory.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz Status and Plans for Linac and RLAs.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Recirculating Linac Acceleration  End-to-end.
Svb[General files ‘01/Presentations]PAC 10 kW laser input.ppt Operated by the Southeastern Universities Research Association for the U.S. Dept. of Energy.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Seesion1 summary Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy Recovery Linacs.
Beam Commissioning Adam Bartnik.
Emittance Dilution and Preservation in the ILC RTML
Plans of XFELO in Future ERL Facilities
Options and Recommendations for TL and Dumps
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
The Cornell High Brightness Injector
Cornell Injector Performance
ERL Main-Linac Cryomodule
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
12 Steps to a Cooler Design
Cooler Ring Design Status - July 2017
Presentation transcript:

DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane The Jlab UV FEL Driver ERL

Delivery of appropriately configured beam to FEL Transverse, longitudinal phase space management beam size/divergence: optical mode overlap Bunch compression: high peak current at FEL Preservation of beam quality space charge, wake/collective effects, CSR Power recovery from exhaust beam Transverse, longitudinal matching Collective effect/instability control space charge BBU, FEL/RF interaction Loss (halo) management Design Requirements

Parameters (Achieved) ParameterIRUV Energy (MeV) I ave (mA)9.12 Q bunch (pC)13560  N transverse/longitudinal (mm-mrad/keV-psec) 8/755/50   p/p,  l (fsec) 0.4%, %, 100 I peak (A) FEL repetition rate (MHz) (cavity fundamental )  FEL 2.5%0.8%  E full after FEL ~15%~7%

Relevant Phenomena Space charge (transverse, longitudinal) Inject long (2.5 psec/1.33 o rms), low momentum spread (~¼%) bunch (LSC) BBU CSR Compress high charge bunch => potentially degrade beam quality (and get clear signature of short bunch) & put power where you don’t want it…signature of short bunch Other wake, impedance effects RF heating, resistive wall

DC Gun SRF Linac UV FEL Transport Line Dump IR Wiggler Bunching Chicane Design Concept: add-on to IR Upgrade retain beam dynamics solution from IR – Use same modular approach (and same optics modules) as in IR side of machine divert beam to UV FEL with minimal operational modification

Design Solution gun injector merger linac Transverse match: linac to arcBates bend recovery Bates bend UV bypass transport grafted onto Bates bend Betatron match to wiggler wiggler Betatron match from wiggler to recovery transport Return bypass transport to energy recovery arc Reinjection/recovery transverse match Energy recovery through linac Extraction line to dump

Phase Space Management Transport system is “functionally modular”: design embeds specific functions (e.g. beam formation, acceleration, transverse matching, bending, dispersion suppression, etc) within localized regions – largely avoids need for S2E analysis allows use of potentially ill-defined/poorly controlled components – demands design providing operational flexibility – requires use of beam-based methods needs extensive suite of diagnostics & controls Its a cost-performance optimization (i.e. religious) issue: pay up front for a sufficient understanding of physics, component/hardware quality, or provide operational flexibility and adequate diagnostic capability?

“Modules” for Phase Space Control Transverse matching – quad telescopes in nondispersed regions; decoupled from longitudinal match – Injector to linac – Linac to recirculator – Match to wiggler – Match out of wiggler to recovery transport – Reinjection match Longitudinal matching – handled in Bates bends – Path length variable over ~± RF /2 (for control of 2 nd pass RF phase) – Independent control of momentum compaction through third order (M 56, T 566, W 5666 ) and dispersion through 2 nd order (T 166, T 266 ) – Relatively decoupled from transverse match Phase space exchange (IR side only) – H/V exchange using 5 quad rotator for BBU control – Decoupled from transverse, longitudinal matching

Transverse Matching (Linear) Multiple quad telescopes along transport system massage H/V phase space to match to lattice acceptance – Injector to linac (4 quads) – Linac to recirculator (6 quads) – Match to wiggler (6 quads) – Match wiggler to recovery transport (6 quads) – Reinjection match (6 quads) Key points – ERLs do not have closed orbits nor do they need to be betatron stable – ERLs may not have uniquely defined “matched” Twiss envelopes – Deliberate “mismatch” (to locally stable transport) may be beneficial e.g. to manage chromatic aberrations, halo, avoid aperture constraints – Design optimization must explore parameter space to determine “best” choice – Beam envelopes and lattice Twiss parameters are **not** in general the same!

Operationally … Measure beam envelopes – multislit, quad scan, and/or multi-monitor emittance measurement Back-propagate results to reference point upstream of matching region Adjust quads to “match” envelopes to design values and/or acceptance of specific sections of transport system lattice Caveat: RF focusing is VERY important – dominates behavior in injector is the “observable” used to set phase on a daily basis – defines injector-to-linac match Limits tolerable gradient in first (last) cavity

Longitudinal Matching Space charge forces injection of a long bunch (SRF gradients are too low to preserve beam quality if bunch is short) – Must compress bunch length during/after acceleration to produce high peak current needed by FEL After lasing, beam energy spread is too large (15-20 MeV) to recover without unacceptable loss – Must energy compress (during energy recovery) to “fit” beam into dump line acceptance The manipulations needed to meet these requirements constitute the longitudinal match

Longitudinal Matching Scenario Requirements on phase space: high peak current (short bunch) at FEL – bunch length compression at wiggler using quads and sextupoles to adjust compactions “small” energy spread at dump – energy compress while energy recovering – “short” RF wavelength/long bunch, large exhaust  p/p (~10%)  get slope, curvature, and torsion right (quads, sextupoles, octupoles) E  E  E  E  E  E 

JLab IR Demo Dump core of beam off center, even though BLMs showed edges were centered (high energy tail)

Module Design: Injector 42 psec (FWHM) 75 (1497/20) MHz green drive laser pulse train with flexibly gated time structure – It’s always the drive laser DC photocathode (GaAs) gun at 325 kV Room-temp buncher providing initial longitudinal control Pair of 5-cell SRF (CEBAF) cavities at 1497 MHz accelerate to ~10 MeV Quad telescope to match to linac

Cathode Cesiated GaAs – Excellent performance for R&D system When charge lifetime limited, get 500 C between cesiations (50k sec, ~14 hrs at 10 mA, many days at modest current), O(10 kC) on wafer – Typically replace because we destroy wafer in an arc event, can’t get QE When (arc, emitter, vacuum,…) limited, ~few hours running – Not entirely adequate for prolonged user operations Other cathodes? – Need proof of principle for required combination of beam quality, lifetime? – New results from Cornell!

Injector Design and Operation At highest level… – System is moderately bright & operates at moderate power – Halo & tails are significant issue – Must produce very specific beam properties to match downstream acceptance; have very limited number of free parameters to do so Issues: – Space charge & steering in front end – Deceleration by first cavity – Severe RF focusing (with coupling) – FPC/alignment steering – phasing a challenge Miniphase – Halo/tails Divots in cathode; scattered drive laser light; cathode relaxation; … (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V) Wafer 25 mm dia Active area 16 mm dia Drive laser 8 mm dia 350 kV/2.5 MV 500 kV/2.5 MV 350 kV/5 MV 500 kV/5 MV Courtesy P. Evtushenko

Injector Operational Challenges Space charge: have to get adequate transmission through buncher – steering complicated by running drive laser off cathode axis (avoid ion back-bombardment) – solenoid must be reoptimized for each drive laser pulse length – vacuum levels used as diagnostic – precludes use of 1 st solenoid for emittance compensation – Must set to provide transmission through buncher, not balance space charge (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V)

Injector Operational Challenges 1 st cavity – decelerates beam to ~175 keV, aggravates space charge; – E(  ) nearly constant for ±20 o around crest (phase slip) Normal & skew quad RF modes in couplers violate axial symmetry & add coupling Dipole RF mode in FPC – Steer beam in “spectrometer”, make phasing difficult – Drive head-tail emittance dilution (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V) 350 kV/1.5 MV 500 kV/1.5 MV 350 kV/2.5 MV 500 kV/2.5 MV

Behavior Can Be Counterintuitive… Example: Proper phasing of JLab injector produces excellent beam quality, stable operation, “completely incorrect” phasing also produces a beam... – one expects that by reversing the source phase (~180 o out of phase with the SRF cavities), the beam would be accelerated to a halt – in fact, the beam is captured and accelerated, albeit at poor quality phase slip retards low energy beam by additional half-RF-period, leads to capture Units: energy: MeV, position: RF ; time:  RF

Injector Operational Challenges FPC/cavity misalignment steering ~ as big as dispersive changes in position – Phasing takes considerable care and some time – Have to back out steering using orbit measurement in linac RF focusing very severe – can make beam large/strongly divergent/convergent at end of cryounit – constrains ranges of tolerable operating phases Phasing – 4 knobs available: drive laser phase, buncher phase, 2 SRF cavity phases – Constrained by tolerable gradiants, limited number of observables (1 position at dispersed location), downstream acceptance – Typically spectrometer phase with care every few weeks; “miniphase” every few hours (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V)

“Miniphase” System is under-constrained, difficult to spectrometer phase with adequate resolution Phases drift out of tolerance over few hours Recover setup by 1.Set drive laser phase to put buncher at “zero crossing” (therein lies numerous tales, … or sometimes tails...) 2.Set drive laser/buncher gang phase to phase of 1 st SRF cavity by duplicating focusing (beam profile at 1 st view downstream of cryounit) 3.Set phase of 2 nd SRF cavity by recovering energy at spectrometer BPM this avoids necessity of fighting with 1 st SRF cavity… (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V)

Module Design: Merger Injection line: 3 dipole “Penner bend” – Achromatic (M 16, M 26 = 0) – Modest M 56 <0 providing some bunch length control Very strongly focusing in bend plane; drift-like in non-bend plane – Focusing => space charge management – drift => transverse asymmetry => bad for space charge Adequate performance at ~100 pC x several mm-mrad level hard to match across somewhat archaic design Reinjection line: achromatic chicane with geometry matched to final dipole of Penner bend – mechanically convenient (fair amount of space)

Numbers  =0.6 m  = 20 o normal entry/exit bend plane focal length ~  /sin  ~ 1.75 m bend-to-bend drift ~ 1.5 m dispersion in center dipole ~0.5 m M 56 ~ m

Merger Issues Low charge (135 pC), low current (10 mA); beam quality preservation notionally not a problem; however… Can have dramatic variation in transverse beam properties after cryounit 4 quad telescope has extremely limited dynamic range Must match into “long” linac with limited acceptance – Matched envelopes ~10 m, upright ellipse – Have to get fairly close (halo, scraping, BBU,…) Beam quality is match sensitive (space charge) Have to iterate injector setup & match to linac until adequate performance achieved (V w/ PM, MSE) (V w/ PM, BPM) (BPM) (V)

Module Design: Linac Three JLab-standard (more or less) cryomodules – Outboard pair: 8 five-cell 1497 MHz cavities – Middle module: 8 seven-cell 1497 MHz cavities Triplet focusing in warm regions Relies on RF focusing in front (back) end on 1 st (2 nd ) pass Wear and tear limits full energy to ~135 MeV or so ~30 m

Module Design: Transverse Match to Recirculator 6 quad telescope – Match  x,y,  x,y,  x,y from linac to Bates bend – Full transverse envelope match + phase advance allows management of chromatic aberrations – Choice of phase advance = aberrations destructively interfere control of turn-to-turn phase advance – BBU suppression 9 MeV beam to dump

Module Design: Bates Bend Requirements “delivery of appropriately configured beam to wiggler” => – betatron matched to wiggler acceptance – Compressed bunch length – Nondispersed after recirculation transport “power recovery from exhaust beam” (without loss…) => – Betatron matched to linac acceptance – Decompressed bunch length with  56 & phasing set to insure energy compression during energy recovery – Nondispersed at reinjection => Need (nonlinearly) achromatic recirculation arc with large acceptance, good betatron behavior, and variable path length/momentum compaction (through nonlinear order)

Bates Bend – Originally used as the basis of an energy doubling recirculator (and a demonstration of current doubling and energy recovery in the early ’80s), the MIT implementation had >8.5% momentum acceptance – JLab FEL drivers (IR Demo, IR upgrade) have both used Bates bends

Bates Recirculator We used the Sargent/Flanz design from MIT because it is really robust, really easy to operate (if you instrument it) and really simple (if you think about it the right way). – Good acceptance (10+%, over 30 o RF phase, good focusing properties (esp. if matching in/out uses chromatically balanced telescopes) Ancillary benefit: No simultaneously small , , l, so CSR, space charge not aggravated (parasitic crossings not an issue)

Module Design: Bypass to UV FEL Building design – including location for UV wiggler, predates machine design by over 5 years – IR system funded/built before the UV (for which the building was originally designed) – Bates bend directs beam to IR FEL UV FEL “must” live in wiggler pit – Wiggler stand height >> beam elevation Need bypass solution – must provide appropriate matching Transverse spot size, bunch compression, dispersion suppression – Constrained by pit location

Reduce bend angle in final dipole of Bates bend to direct beam toward UV wiggler pit – “short out” half of coil pack to reduce bend angle by half Complete bend when at proper transverse offset Bypass Concept Use FODO quad transport between bends to manage dispersion, control betatron envelopes – Add 1 betatron wavelength in bend plane to image/suppress dispersion – Select out-of-bend-plane phase advance to manage envelopes, aberrations (1/2 betatron wavelength works well) – Use 7 quad FODO transport – Sextupoles at high-dispersion points (at horizontally focusing quads) provide correction of 2 nd -order dispersion

Module Design: Match to Wiggler Similar to linac-to-arc match – 6 quad telescope (two triplets) Set transverse envelopes, phase advances

Module Design: Match from Wiggler Just like previous match: 6 quad telescope, set envelopes, phase advances…

Module Design: Return transport to recovery arc Reflection of translation from Bates bend to UV backleg

Module Design: Bates Bend 2 nd Bates bend geometrically identical to 1 st one Momentum compactions different (trim quad, sextupole settings) to complete longitudinal match giving energy compression during energy recovery Details to follow…

Module Design: Reinjection Match More or less a mirror image of linac-to-arc match Particular care on choice of phase advance needed to ensure “chromatic balance” & adequate momentum aperture – Phase advance between/across telescopes used to control chromatic aberrations – Use “extra” quads in the triplet pairs – Select Twiss parameters in arc with care 9 MeV injected beam

Module Design: Recovery Pass Through Linac Two issues: – Match (beam loss, halo control, tails, scraping…) – Steering (beam loss, halo control, blah blah blah) Multipass steering tricky – Best to steer 1 st pass “locally” (insofar as possible) and thread 2 nd pass through using choice of reinjection orbit – Situation rendered complex by absence of 2-pass BPMs, RF skew quad in 5-cell cavity HOM couplers

Multipass Orbit Correction Energy of each pass differs at any point of linac – Orbit response to steering differs Need localized observation & correction – Multipass BPMs - for high-frequency CW bunch trains separated by ½ RF period... Example: JLab IR Upgrade: orbit bump on 1 st pass of linac

Two Example Orbit Bumps… or NOT

Multipass Orbit Correction – Common Transport “multiple beams” not limited to linac – some ERL geometries use single beamlines for multiple beams – E.g. CEBAF-ER

Module Design: Extraction Line to Recovery Dump Mirror image of injection merger Quad triplet after extraction => betatron spot control at dump face Dispersion ~ 1 m: useful diagnostic for phasing beam during energy recovery & energy compression