PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

FAIR Synchrotrons SIS100/300
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
SIS 100 – Fast ramped superconducting magnets E. Fischer, GSI Darmstadt Meeting of the Design Study Committee for the EU contract "DIRACsecondary-Beams"
Development of a Curved Fast Ramped Dipole for FAIR SIS300 P.Fabbricatore INFN-Genova Development of a Curved Fast Ramped Dipole for FAIR SIS300 P.Fabbricatore.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Dipole Magnets for NESR and RESR Gebhard Moritz GSI Darmstadt November 2004.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
FAIR – Facility for Antiproton and Ion Research
Magnet designs for Super-FRS and CR
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Arup Ghosh Workshop on Accelerator Magnet Superconductors ARCHAMPS March Cable Design for Fast Ramped SC Magnets (Cos-  Design) Arup Ghosh.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
RESEARCH and DEVELOPMENT for CBM (at LHE JINR) Yu.V. Zanevsky Laboratory of High Energies JINR, Dubna - NEW INFRASTRUCTURE - FAST GAS DETECTORS - DIPOLE.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Oliver Boine-Frankenheim, High-Current Beam Physics Accelerator Facility for Energetic Ion Beams of High Intensity and Quality Inter’l Accelerator Project.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova,
Prospects for fast ramping superconducting magnets (trans. Lines, FAIR, SPS+, VHE-LHC LER) Visions for the Future of Particle Accelerators CERN 10th -
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
Cold testing of rapidly-cycling model magnets for SIS 100 and SIS 300 – methods and results P. Schnizer, E. Fischer, E. Floch, J. Kaugerts, M. Kauschke,
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Medical Applications 6 contributions on Particle therapy: Magnets for
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
GSI Helmholtzzentrum für Schwerionenforschung GmbH The Optimized Superconducting Dipole of SIS100 for Series Production ICEC26 March 9th, 2016 GSI Helmholtzzentrum.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
O. Kester, NuSTAR annual meeting, 27/02/2013
Basic Topics for the Design of the SIS100 Quadrupole Modules MAC - 4 December 1 th - 2 nd, 2010 GSI, Darmstadt Egbert Fischer, Pierre Schnizer, Kei Sugita,
GSI Helmholtzzentrum für Schwerionenforschung GmbH Dr. Hans Müller Primary Beams, Dept. SC Magnets and Testing (PB-MT) GSI Helmholtzzentrum für Schwerionenforschung.
Status of the FAIR Project
High energy beam transport.
Oleksiy Dolinskyy December 1st, 2014
Summary of Session: Magnets and undulators for light sources 2
Status of HESR 18th March Gießen Dieter Prasuhn.
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Quench Simulation at GSI
A.Lachaize CNRS/IN2P3 IPN Orsay
SIS100 quadrupoles Dubna: status
JINR Experience in SC Magnets
Arc magnet designs Attilio Milanese 13 Oct. 2016
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
Project "Nuclotron M" / NICA
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Presentation transcript:

PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific Council, Dubna, February 22, 2008

SIS100 SIS300 HESR FLAIR NESR RESR/ CR FAIR – MULTIPURPOSE HEAVY ION AND pbar FACILITY FAIR IS CONSIDERED AS INTERNATIONAL PROJECT JINR IS INVOLVED IN the COLLABORATIVE WORK BASED ON AGREEMENTS, CONTRACTS AND PROJECTS SINCE 1999 A.Kovalenko 103 session of the JINR Scientific Council, Dubna, February 22, 2008

A.Kovalenko SIS100 - fast-cycling superconducting synchrotron of the Nuclotron-type (LHE-group) NESR – storage ring (LNP-group) 103 session of the JINR Scientific Council,Dubna, February 22, 2008 R&D DIRECTIONS:

MODEL DIPOLES & QUADRUPOLES; - FULL SIZE PROTOTYPES; - STEERERS AND MULTIPOLES; - LATTICE STRUCTURE OPTIMIZATION; - BEAM EXTRACTION and TRANSFER; - CLOSE ORBIT CORRECTION; - U(29+) COLLIMATION; - OTHER ELEMENTS: BPM, CATCHERS,..; - CRYOSTAT MODULES; - COOLING SYSTEM; - MODEL DIPOLES & QUADRUPOLES; - FULL SIZE PROTOTYPES; - STEERERS AND MULTIPOLES; - LATTICE STRUCTURE OPTIMIZATION; - BEAM EXTRACTION and TRANSFER; - CLOSE ORBIT CORRECTION; - U(29+) COLLIMATION; - OTHER ELEMENTS: BPM, CATCHERS,..; - CRYOSTAT MODULES; - COOLING SYSTEM; A.Kovalenko 103 session of the JINR Scientific Council,Dubna, February 22, 2008 SIS100 COLLABORATIVE R&D :

JINR NUCLOTRON - prototype of the FAIR SIS100 synchrotron A.Kovalenko 103 session of the JINR Scientific Council,Dubna, February 22, 2008 Nuclotron dipole and quadrupole magnets 2 T, 4 T/s, 1 Hz dipole 34 T/m, 68 T/m s, quad

Low degradation of the cable critical current in a fast ramping operation (4.8 dB/dt=4T/s) Anatoly Alexeevich Smirnov ( – ) NUCLOTRON SC - cable Weak dependence of the eddy current loss on the magnetic field ramp NO OTHER CABLE WITH SIMILAR PARAMETERS A.Kovalenko 103 session of the JINR Scientific Council,Dubna, February 22, 2008

2001–2007: 23 TEST RUNS 4K YOKE DIPOLE: AC LOSSES WERE REDUCED BY A FACTOR OF 2 COMPARE TO THE NUCLOTRON TOTAL NUMBER OF TEST CYCLES HAVE EXEED ; 50K YOKE DIPOLE: COLD MASS OF THAT DIPOLE VERSION HAVE OPERATED CYCLES at B=2T, dB/dt=4T/s, f=1Hz. f FULL SIZE 4K YOKE DIPOLE EQUIVALENT – WAS PREPARED AND TESTED. A.Kovalenko SIS100 R&D at JINR: MODEL DIPOLES(1) Original Nuclotron dipole 103 session of the JINR Scientific Council,Dubna, February 22, 2008 costs study (GSI): nc version: 26M€ sc version: 2.6 M€

A.Kovalenko Stainless steel end plates and brackets Modified yoke ends Modified coil end-loops and new SC wire (4 mkm ) Aperture 56 mm x 110 mm (v x h) Cold yoke 4.5 K Heat shield 80 K SIS100 R&D at JINR: MODEL DIPOLES(2) Basis for the first full length SIS100 prototype dipole 103 session of the JINR Scientific Council,Dubna, February 22, 2008

A.Kovalenko SIS100 R&D at JINR: MODEL QUADRUPOLES(1) SIS100 Maximum AC LOSSES WERE REDUCED BY A FACTOR OF 3 Quasi-continuous operation mode is possible also 103 session of the JINR Scientific Council,Dubna, February 22, 2008

JINR’s EXPERIMENTAL WORKSHOPS A.Kovalenko 103 session of the JINR Scientific Council,Dubna, February 22, 2008 THE NUCLOTRON CRYO- MAGNETIC SYSTEM WAS MANUFACTURED HERE

103 session of the JINR Scientific Council, Dubna, February 22, 2008 A.Kovalenko FULL SIZE SIS100 DIPOLE & QUAD (1) YOKE MANUFACTURING AT JINR EW EU PROJECT: DIRACSecondary beams N515873

103 session of the JINR Scientific Council, Dubna, February 22, 2008 A.Kovalenko FULL SIZE SIS100 DIPOLE & QUAD(2) EU PROJECT: DIRACSecondary beams N COLE MANUFACTURING AT LHE

A.Kovalenko JINR PROPOSAL ESTIMATED COST ~ 35 Meuro, ( less than 30% of the proposed Russian contribution to FAIR ) 103 session of the JINR Scientific Council,Dubna, February 22, 2008

A.Kovalenko FAIR WORK PACKAGES 103 session of the JINR Scientific Council,Dubna, February 22, 2008

A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, nd Lab Directors Meeting, Protvino, January 15/16, 2008

A.Kovalenko 103 session of the JINR Scientific Council,Dubna, February 22, 2008 JINR FURTHER ACTIVE PARTICIPATION IN THE CONSTRUCTION OF THE SIS100 CRYOMAGNETIC SYSTEM WOULD BE VERY NATURAL MANUFACTURING OF THE SIS100 MAGNETS AND OTHER LATTICE ELEMENTS (TS-2, TS-6,…) WOULD BE VALUABLE CONTRIBUTION OF RUSSIAN INDUSTRY AND LABORATORIES TO THE FAIR CONSTRUCTION