I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The MAD chip: 4 channel preamplifier + discriminator.
Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago November 11, 2014 Board Review.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Hybrid Status Carl Haber 12-Aug-2008 UCSC. 6 x 3 cm, 6 chips wide 10 x 10 cm, 10 chips wide 1 meter, 3 cm strip, 30 segments/side 192 Watts (ABCD chip),
1 Module and stave interconnect Rev. sept. 29/08.
Printed Circuit Board Design

STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SHD Connectors PURPOSE: To introduce the SHD double row wire to board disconnectable crimp style connector series.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Circuit board
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r Astou Thiongane,
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Design and Performance of Single-Sided Modules within an Integrated Stave Assembly for the ATLAS Tracker Barrel Upgrade Ashley Greenall The University.
1 Module and stave interconnect Rev. sept. 29/08.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Nov. 10, 2005UCSC US ATLAS Upgrade meeting -- Ely, Garcia-Sciveres1 DC to DC Power Converion R. Ely and M. Garcia-Sciveres Atlas Upgrade Workshop Santa.
CaRIBOu Hardware Design and Status
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Mitch Newcomer Representing work at RAL, Liverpool, BNL and Penn.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Laura Gonella – University of Bonn – 27/09/20111 The Shunt-LDO regulator for powering the upgraded ATLAS pixel detector Laura Gonella University of Bonn.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Serial Powering System Architecture Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of the SP Community Acknowledgement: many figures prepared.
ATLAS Strip Tracker Stavelets or A Tale of Two Stavelets “It was the best of times, it was the worst of times, it was the age of wisdom, it was the age.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Control voltage 0 to 8 V driver supply voltage 3.3 to 5 V 3.3 to 5 V control pulse rising edge (there is a 49.9 Ω term. resistor hidden under here!) 100.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Serial powering for pixels F. Hügging, D. Arutinov, M. Barbero, A. Eyring, L. Gonella, M. Karagounis, H. Krüger, N. Wermes SLHC-PP Annual Meeting, CIEMAT,
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
High Speed Properties of Digital Gates, Copyright F. Canavero, R. Fantino Licensed to HDT - High Design Technology
Development of T3Maps adapter boards
Setup for automated measurements (parametrization) of ASD2 chip
Design of Flexible Printed Circuit Prototype towards RD53 IC
FEE Electronics progress
Module 1 – Power Supply AMC APS-PBC-60
Flex Status A.Nomerotski, 4 May 2010.
Presentation transcript:

I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea, S.Burdin, D.Forshaw, M.Milovanovic Development of hybrid for EndCap Quad Pixel Module Contents: Hybrid design features First test results Summary and open questions Acknowledgment: Tony Affolder, Ashley Greenall, M.Wormald, Bonn University colleagues

quad 1 quad 2 quad 3 quad 4 quad 5 Power Data DCS (omitted in 1 st prototype) I.Tsurin Liverpool University 08/04/2014Page 2 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Please refer to Stephan Eisenhardt's presentation on 07/04/2014 for global overview of the EndCap readout

I.Tsurin Liverpool University 08/04/2014Page 3 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Single 1/2 oz copper clad printed circuit board (second PCB version has got a double copper clad for solid ground) 100  m FR4 base material Minimum track and gap width 0.15mm (standard and safe) Quad Module hybrid prototype

I.Tsurin Liverpool University 08/04/2014Page 4 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Key Design Features Single sided PCB: twice less copper, hybrid glued directly on sensor's backplane (under HV) saving material further. Fail-safe circuit for AC coupled clock and command signals Bypass capacitors at both ends of supply rails for Low DropOut voltage regulators External shunt current setting resistors Extension tab with 40 way AXT connector pin-compartible with existing hybrid designs

I.Tsurin Liverpool University 08/04/2014Page 5 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Fail-safe circuit for AC coupled input signals 0V measures between '+' and '-' LVDS inputs of the ROC, thus external fail-safe circuit is necessary for them. Implemented scheme provides 25 mV differential voltage with 600 mV common mode voltage for 1.8V unregulated supply common to all four ROCs.

I.Tsurin Liverpool University 08/04/2014Page 6 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Shielding scheme Bus tape may have a shield to protect ROCs' supply and sensor's bias voltages from high frequency signals. This shield is tied to ground on a hybrid through a capacitor or zero Ohm jumper. If unused, the shield track could beef the ground connection. Aluminised backplane (under HV) of the quad sensor is AC coupled to ground on a hybrid to shield ROCs from high frequency signals

I.Tsurin Liverpool University 08/04/2014Page 7 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Aignment marks / bond-off pads for assembly Layout features Pads for the pick-up tools Edge wire bond pads for connectorless mounting Unrouted signals are wire bonded on the PCB Beefy paths for LDO bypass capacitors

I.Tsurin Liverpool University 08/04/2014Page 8 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Quad Pixel Module assembly PCBs are glued onto 0.3 mm thin carbon fibre plate with non-conductive bottom surface - to rigidise PCBs - to shield ROCs from high frequency signals (replica of Quad Sensor) Populated PCBs are glued on top of four ASICs with Epolite FH 5313A adhesive 0.5 kg "Yellow" FE-I4Bs

I.Tsurin Liverpool University 08/04/2014Page 9 ATLAS Upgrade Week 2014, Freiburg, April 7-11 RJ45 connector for clock, command and data 8-way Molex connector for sensor bias and ASICs' supply voltages Carbon fibre plate for Quad module mechanical handling and cooling Quad pixel module with AXT receptacle plugged into AXT header on the test PCB Hybrid Test Card Jumpers to select the ROC

I.Tsurin Liverpool University 08/04/2014Page 10 ATLAS Upgrade Week 2014, Freiburg, April 7-11 First test results LDO power scheme with bandgap reference voltages (shunt regulators disabled) Tuning results are sensitive to substrate connection Threshold spread Noise distribution Tuning for 8 ToT (20 ke) and 3000e threshold using USBPix All ROCs are configured, one is being readout at a time

I.Tsurin Liverpool University 08/04/2014Page 11 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Threshold and noise scans

I.Tsurin Liverpool University 08/04/2014Page 12 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Summary Promptly avalaible 30-way AXT connectors were assembled providing 5 pins for power supply. The quad module draws 1.7A current, thus 40-way AXT connectors have to be used to beef the number of pins for input power and ground. (Panasonic's absolute maximum rating 300mA / pin) Real estate of the PCB with major components groupped in two columns and free central area simplifies design of handling tools for the quad hybrid (vacuums pickup and press molds for glueing) AXT connector needs different pinout for high voltage application (Panasonic's absolute maximum rating is 60V)

I.Tsurin Liverpool University 08/04/2014Page 13 ATLAS Upgrade Week 2014, Freiburg, April 7-11 Open questions 1. Integration of hybrid into readout system: through a connector or wire bonding 2. Further development: Accommodating Module Protection Chip and Data Multiplexer Chip Data Multiplexer Chip could be placed as a mezzanine board in the central area where all signals meet together Placing Module Protection Chip on the hybrid requires discussion