LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels 0401-18-06.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
DELTA Project Overview Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at LCLS-II Physics Meeting Tuesday, October 11, 2011.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Stern-Gerlach Experiment Physics 243 Fall 2007 Chris Osborn Daniel Richman.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
MBA Magnets MultiBend Achromat Magnets 9/27/2013 Review By Mark Jaski.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
AP2-Debuncher Injection Area 2004 Shutdown Work August 2, 2004.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
E4 hall technical specifications
Design and Implementation of New Cleanroom for Tunnel Work
Thermal review of CLIC module
TM0s and TM1 components inventory and procurement schedule
Undulator System Installation
Beam Finder Wire Assembly Undulator System
Summary of Session 5 Other Vibration Source
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
LTU/Undulator Installation Status
Linac Coherent Light Source Procurement
e-Beams Systems Update
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Production Management
Two-beam Test-stand Design and Construction Status
LTU/Undulator Installation Status
Fixed Support Design & Testing
Undulator Systems Integration
Undulator Hall Power Dissipation
Presentation transcript:

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump 2 13

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump

LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings Expanded Pages, Added Thermocouples, Added Cable Tray, Added Cables Moved Bellows, Updated Supports, Reconfigured RFBPM Waveguide, Added Change Box Reconfigure Assembly, Update Colors, Reconfigure RFBPM Waveguide ChangeRevDate Thermocouple Location 1Undulator 2Ambient Air 3Ambient Air at Quad 4Quad 5RFBPM 6Girder 7Undulator Motor (Dwn Strm) 8Undulator Motor (Up Strm) 9Girder Motor (Single) 10Girder Motor (Double) 11Floor Support (Upper) 12Floor Support (Lower) 13Vacuum Chamber Support 14Vacuum Chamber (At Beam) 15Vacuum Chamber (Strngbk) 16Ion Pump 16