28. Januar, Zürich-Oerlikon
Switch/Update to Team Foundation Server 2012 André Hofmann Software Engineer bbv Software Services AG
Agenda Hardware and Software Requirements Supported Upgrade Paths Walktrough Migration Upgrade Post Configuration Reports Builds TFS 2012 Features Activation
Hardware and Software Requirements Chapter 1 of 6
OS Requirements for TFS Supported Versions: 64-bit version of Windows Server 2008 with SP2 64-bit version of Windows Server 2008 R2 with SP1 64-bit versions of Windows Server
SQL Server Requirements for TFS Supported Editions: SQL Server 2008, R2 Express SQL Server 2008, R2 Standard Edition SQL Server 2008, R2 Enterprise Edition with SP1 CU1 (25. August 2011) SQL Server 2012, Express SQL Server 2012, Standard Edition SQL Server 2012, Enterprise Edition
SharePoint Products Requirements for TFS Supported Editions: SharePoint 15 Technical Preview SharePoint Foundation 2010 SharePoint Server 2010, Enterprise Edition SharePoint Server 2010, Standard Edition Office SharePoint Server 2007, Enterprise Edition Office SharePoint Server 2007, Standard Edition Windows SharePoint Services 3.0
Hardware Recommendations If you install SharePoint 2010, you will need 1 quad core and a base minimum of 4 GB or better 10 GB of system memory and additionally hard disk memory. Number of UsersConfigurationCPUMemoryHard Disk Fewer than 250 usersSingle-server (Team Foundation Server and the Database Engine on the same server). 1 single core processor at 2.13 GHz 2 GB1 disk at 7.2k rpm (125 GB) 250 to 500 usersSingle-server.1 dual core processor at 2.13 GHz 4 GB1 disk at 10k rpm (300 GB) 500 to 2,200 usersDual-server (Team Foundation Server and the Database Engine on different servers). This row is for Team Foundation Server. 1 dual core Intel Xeon processor at 2.13 GHz 4 GB1 disk at 7.2k rpm (500 GB) This row is for the Database Engine with 500 to 2,200 users. 1 quad core Intel Xeon processor at 2.33 GHz 8 GBSAS disk array at 10k rpm (2 TB) 2,200 to 3,600 usersDual-server. This row is for Team Foundation Server. 1 quad core Intel Xeon processor at 2.13 GHz 8 GB1 disk at 7.2k rpm (500 GB) This row is for the Database Engine with 2,200 to 3,600 users. 2 quad core Intel Xeon processors at 2.33 GHz 16 GBSAS disk array at 10k rpm (3 TB)
Supported Upgrade Paths Chapter 2 of 6
Upgrade TFS 2012 from the following Releases: Team Foundation Server 2012 RTM, Developer Preview, Beta or RC Release Team Foundation Server 2010 with or without SP1 Team Foundation Server 2008 with SP1 TFS 2005? => TFS 2008/2010 => TFS 2012
Basic or Express Upgrade
Standard (In-Place) Upgrade
Advanced (Migration) Upgrade
Walktrough Migration Upgrade Chapter 3 of 6
Migration TFS 2010 to TFS 2012 Scenario: TFS 2010 Windows Server 2008 R2 SP1 Microsoft SQL Server 2008 R2 SharePoint 2010 TFS 2012 Windows Server 2008 R2 SP1 Microsoft SQL Server 2012 SharePoint 2010
Backup TFS Download and install TFS Server 2010 Power Tools (creates the node «Team Foundation Backups» in the Team Foundation Server Administration Console).TFS Server 2010 Power Tools 2. Stop all of the services, application pools and operations of TFS with «TFSServiceControl quiesce» command:
Backup TFS Create Backup
Backup TFS Start all of the services, application pools and operations of TFS with «TFSServiceControl unquiesce» command:
Migration 1. Switch to target system and install TFS Server 2012 Power Tools (installs the Restore Databeses Wizard)TFS Server 2012 Power Tools 2. Start Restore Databases Wizard and follow instructions
Migration
3. Start Team Foundation Server Administration Console
Migration
Post Configuration Reports Chapter 4 of 6
Reporting Services Configuration 1. Start Reporting Services Configuration Management Tool
Reporting Services Configuration 2. Connect to Report Service
Reporting Services Configuration 3. Change the database to the restored database
Reporting Services Configuration 4. Restore Encryption Key
Reporting Services Configuration 5. Open IIS go to Team Foundation Server site and enable directory browsing for v3.0. After that browse to WarehouseControlService.asmx
Reporting Services Configuration 6. Open WarehouseControlWebService in Internet Explorer
Reporting Services Configuration 7. Invoke ProcessWarehouse with no parameters 8. Invoke ProcessAnalysisDatabase with parameter processingType and value Full
Reporting Services Configuration 9. Update Reporting in TFS Administration Console
Post Configuration Builds Chapter 5 of 6
Build Configuration
Don´t forget to update the build drop
TFS 2012 Features Activation Chapter 5 of 6
TFS 2012 New Features Activation Code Review Feedback My Work Planning Tools Storyboard Integration
TFS 2012 New Features Activation Run the «configure features» wizard in Team Web Access for each Team Project.
TFS 2012 New Features Activation for customized Process Templates
TFS 2012 New Features Activation for customized Process Templates 5. Import the process configuration files for new backlog and board pages witadmin importagileprocessconfig /collection:CollectionURL /p:"ProjectName" /f:"DirectoryPath\AgileConfiguration.xml" witadmin importcommonprocessconfig /collection:CollectionURL /p:"ProjectName" /f:"DirectoryPath\CommonConfiguration.xml"
Finished
Additional Information Installing/Upgrade TFS Server and Visual Studio ALM Installing/Upgrade TFS Server and Visual Studio ALM TFS Server Upgrade Guide ALM Rangers
Thank you for your attention Contact: André Hofmann bbv Software Services AG Untermüli 5 CH-6302 Zug