Section 130 At-Grade Highway- Rail Crossing Program.

Slides:



Advertisements
Similar presentations
Federal Safety Funding for Local Governments Martin Andersen Local Government Section Manager February 19, 2010.
Advertisements

TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Santa Maria River Bridges Widening. Project Location.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
THE OHIO RAIL DEVELOPMENT COMMISSION + THE CSX NATIONAL GATEWAY FHWA Talking Freight Webinar April 17, 2013.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
County Bridges Falling Down SDACC – County Commissioners Spring Workshop Thursday, March 17, 2011.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Mandy Chu Office Chief Highway System Information and Performance Division of Research, Innovation and System Information Introduction to HPMS Highway.
Existing informal footpath (owned by HCA) to connect to Lodge Jct crossing Carriageway widened into wooded area Proposed area for landscaping.
July 25,  Highway Trust Fund (HTF) Cashflow problems  Highway Trust Fund Long Term Solvency  FY 2015 Appropriations  MAP-21 Reauthorization.
Module 13: Highway-Rail Grade Crossings (HRGC)
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
State Rail Partnerships. State Rail Partnerships Colorado DOT (CDOT) Project Coordination Ronnie Dickey CDOT Railroad Program Manager, Project Support.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
State and Federal Funding Programs for Local Agency Projects Alan Lively Local Government Section Project Delivery Specialist.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Division of Budgets August 22, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 14.
Ron Hall Tribal Technical Assistance Program Colorado State University
Mid-States Highway-Rail Grade Crossing Safety Conference Guan Xu, P.E. Federal Highway Administration Office of Safety Design.
HDR Engineering, Inc. Railroad Bridge Design Guidelines May 20, 2008 Mid-States Highway-Rail Grade Crossing Safety Conference Railroad Design Guidelines.
The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
STATE CROSSING SAFETY PROGRAMS & FEDERAL CROSSING SAFETY FUNDING CROSSINGS FOR THE 21 ST CENTURY SESSION AASHTO – SCORT MEETING March 14, 2011 – Washington,
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
Snapshot of the Railroad Industry in Alabama Within Alabama there are 29 freight railroads that operate over 3,255 miles of track. This includes Class.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
ALDOT Modal Programs Rail/Highway Safety Section.
Trade Corridors Improvement Fund (TCIF) California Freight Advisory Committee February 26, 2015.
Национальная процедура одобрения и регистрации проектов (программ) международной технической помощи (исключая представление информации об организации и.
NCHRP AASHTO’s Research Program State DOTs Funds (5.5% of SP&R given voluntarily) Problems Applied research focus National issues Shared issues Contract.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
A state and national data system consisting primarily of:
SCOH – Spring ‘07 Administration of Federal-aid Projects by Local Public Agencies AASHTO Spring Meeting Phoenix, AZ May 4, King W. Gee Associate.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
West Valley College Division Council Committee and Performance Goals Committee Retreat Wednesday, August 22, pm Baltic Room, Campus Center.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
VICTORIA FOUNDATION RORY GREWAR Wednesday, September, 2015.
Financial Resources Overview February 11, Outlook 2040 LRTP Update Goals & ObjectivesNeedsAssessment DataForecastsFinancialResources CostFeasiblePlan.
Measure M2 Environmental Cleanup Allocation Program.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Electrical Installation II1 Registered Electrical Contractor / Worker (Refer to handouts)
California’s Experience with HFST 1.  Overview  Challenging Locations  Collision Reduction (State and Local Roads)  Typical Placement and current.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
5/8/02FHWA Office of Safety1 Funding Resources for Highway Safety (FY2001 Fed-Aid) $1.4 $5.6 Min. Guarantee Bridge Surface Transp. Program National Hwy.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Derek Schmitz Finance Chair Class of 2016 FINANCE PROCESS.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
Existing Interchange CC 215 Single bridge I 15
Interstate 15 North 8/17/2015 Update
Funding Methodologies: Road Maintenance & Road Construction
Registration How to Register for Classes
Wintergreen Neighborhood Park Meeting
Budget Overview Review of Last Years Budget
Spring 2018 Calact conference Newport beach, ca April 2018
Woodinville-Duvall Road Widening Project Update
Premier’s Reading Challenge INDONESIAN Competition 2017
FY20 BUDGET DEVELOPMENT March 18, 2019.
State Financial Aid Webcast
Date Session Title Name Organization.
Presentation transcript:

Section 130 At-Grade Highway- Rail Crossing Program

California Contacts CPUC Bree Arnett Phone: Caltrans Ken Galt Phone: CPUC Section 130 Guidelines: ossings/rr+crossing+funding+programs.htm

What? Why? How much? Program Authority - Title 23 USC 130 Program Purpose – Improve the Safety at existing at-grade highway-rail crossings. Funding Levels – ~$16 million is allocated annually to California by FHWA.

Funding Items Not Funded Grade Separations Installing Concrete Panel Surfacing Road/Track Realignment Purchasing Easement / Right-Of-Way Road Widening for Capacity Improvement EIR’s

Priority List Development Annual Cycle for Updates CPUC Phase I = Winter Quarter CPUC Phase II = Spring & Summer Quarters Updated list to Caltrans in August Program Review/Updates = Fall Quarter

Questions?