Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting

Slides:



Advertisements
Similar presentations
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
CDF Steve Hahn January 13, CDF Operations Summary Thurs. Fri. Sat. Mon. Tues. Wed. Stores long enough for accounting in bold Don ’ t believe! Generally,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
1 P. Wilson DAQ Meeting 3/3/99 TDC Full Crate Test l Goal is to test TDCs in environment of full crate of cards äTests at Michigan limited to a few cards/crate.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Low Luminosity Opportunities Andrew Brandt, U. Texas at Arlington DØ ADM November 18, 2005 “easy” “really hard”
Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
1 FY05 Shutdown at CDF Rob Roser for the CDF Operations Group January 18, 2004.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Kaori Maeshima Fermilab Jan. 12, University Evolution: Search in High Mass Dilepton Channel in CDF Pre Run I Run 1A, Run 1B, and Run II......
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
14 paesi, 62 universita’ e laboratori
Open Tasks for PrimEx-II Run
Presentation transcript:

Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting CDF Operations Report Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting

Store Summary (8 - 15 Dec 2005) 4543 13 Dec 2.0 41.6 0.24 4549 14 Dec Start Date Duration (hours) Initial Lum (μb-s)-1 Del. Int. Lum. (pb-1) Live Int. Lum. Int. Lum. w/Si Comments 4543 Quench 13 Dec Tue 2.0 41.6 0.24 0.12 48.8% 0.0 0.0% XTRP Configuration problem 4549 14 Dec Thu-Sat 11.4 53.0 1.20 1.03 85.9% Mostly problem free Silicon held out for stable conditions Total 4543-49 13.4 1.44 1.15 79.9% bbbhhtt! Startup has been pretty troublesome for Tevatron Lost all 4 stores to quenches (including 1 during final protons and 1 during scraping) As of 10:30 today (15 Dec) Tevatron is off for 24 hours while conditioning B11H separator which is sparking 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

Run II Integrated Luminosity Delivered: ~1443 pb-1 Recorded: ~1156 pb-1 Silicon Good: ~916 pb-1 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

CDF Detector Operations COT Completed installation of last crate of upgrade TDCs on Wednesday 14 Dec evening. SL6 has been tripping. Replaced load resistor. Have connected diagnostics for further study. XFT SLAM boards fully integrated into DAQ Thursday 8 Dec. Working on SLAM board timing adjustments to minimize bit transfer errors Plug Completed Plug Sourcing Friday 9 Dec. Silicon Keeping silicon out of DAQ configuration until there’s a normal termination store Took cosmics with silicon on Saturday 10 Dec. Central Calorimeter Some post-shutdown problems with CCAL13 but seems to be improving as usual after few days of “normal” operations. Reseated TRACER cable for CCAL05 after post-shutdown trouble Fixed bad CEM Pisa box channel 15 Dec 2005 Bob Wagner, CDF Weekly Meeting

Bob Wagner, CDF Weekly Meeting Access Reports Concluded Supervised Access period last Thursday 8 Dec 2005 Four Controlled Accesses past week: Sunday Day 11 Dec – 2.3 hours Dangling XFT trigger cable reinserted Monday Day 12 Dec – 0.5 hours Empty Recovery Receptacle for Gravity Induced Ground Water Precipitation Monday Day 12 Dec – 1.5 hours Silicon ladder diagnostics – found bad power supply; also usual behavior for one AVDD Wednesday Evening 14 Dec – 3.0 hours Completed installation of last crate of COT TDC upgrade boards Pending Access Tasks: Nothing currently 15 Dec 2005 Bob Wagner, CDF Weekly Meeting