STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -

Slides:



Advertisements
Similar presentations
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
Advertisements

World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox.
CEN/TC278 PT1601 Report to DT2 and ISO TC204 WG18 / CEN TC278 WG16 plenary Vienna, June PT1601 / DT2 report Vienna1.
Summary of ETSI/ESI activities Andrea Caccia ETSI/ESI TB member Note: This document expresses only the views of its author.
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
TBXXX / STFXXX CLOSE DEBRIEFING REPORT Subject Presented by TB Chairman © ETSI All rights reserved Version: 7 December 2012.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
Activities planned, TO DO's and timing 16th Technical Committee meeting Ljubljana IWT - Belgium15-16 Sept
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.
Mike Sharpe, ETSI VP ESP (ETSI Standardization Projects)
2nd Workshop on Wideband Speech Quality - June ETSI TC STQ STF 294 Improving the quality of eEurope wideband speech applications by developing a.
Riccardo Genghini - Ws E-Sign Chairman – IETF PKIX San Francisco March Electronic Signature infrastructure for Europe Riccardo Genghini Cen/Isss.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
Key parameters in optimising low duty cycle mitigation ETSI STF 411 CEN DSRC/ITS Coexistence Workshop Ispra June 2011 Friedbert Berens STF411 Member.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Project Management Group (PMG) Status Report to the Commercial Mobile Service Alert Advisory Committee September 19, 2007 Jeffery Goldthorp, PMG Leader.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
World Class Standards STF395 DCC / DSRC coexistence Dieter Smely © ETSI All rights reserved July 2011 | Workshop Ispra.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
ETSI TC ITS Status on Standardization Martin ARNDT ETSI ESP © ETSI All rights reserved M2M Market and Technology Opportunities
ETSI TC ESI PRESENTATION TO CAB FORUM Iñigo Barreira /Arno FiedlerFebruary 2016 meeting, Scottsdale, AZ © ETSI All rights reserved.
Doc.: IEEE /0958r0 Submission September 2005 Knut Evensen, Q-Free ASASlide 1 ETSI-TG37-liaison-report-september-2005 Notice: This document has.
Signalling Programme External Stakeholder Meeting on September 17, 2009.
World Class Standards 44TD21 The ETSI Standards Engineering Process STF308 DTR/MTS Steve Randall STF308 © ETSI All rights reserved MTS#44 March.
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
GCOS IP and Update on CEOS Response
“European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate M/376 to.
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
Secretariat Matters INTOSAI Working Group on Environmental Auditing
SKADS Controller’s Meeting Timeline Annual Financial Report
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
Security in MTS 19th September 2012 SIG Report
ETSI STF333: European accessibility requirements for public procurement of products and services in the ICT domain (Phase 1, EC Standardisation Mandate.
Automated Interoperability Testing
EMTEL OCG Adhoc Group GSC9_joint_xxx 06/12/2018 GSC-9, Seoul 1 SOURCE:
EU-US-JP ITS Steering Group Annual Meeting 2018
TC MTS / STF 430 Close Debriefing Report
Planning of MISSOC activities until the October Network Meeting
Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO)
Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO)
Strategic Planning Timeline Overview
Informal document GRPE-78-23
Common Implementation Strategy for the
May Liaison Report Date: Authors: May 2009
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
9th meeting of the Floods Working Group
UPDATE on SVN & MANTIS Upgrade
Document Management Policy
ETSI STF333: European accessibility requirements for public procurement of products and services in the ICT domain (Phase 1, EC Standardisation Mandate.
Review plan of the nature reporting – update 6
The ETSI Standardisation Process
European Statistical System Network on Culture (ESSnet Culture)
How to write world class standards
CEN/WS XBRL PT kick-off meeting
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
Strategic Co-ordination Group May 2009
Activity on Eutrophication
Common Implementation Strategy for the
STF 491: TTCN-3 Evolution 2015 Final Report summary
Security in MTS 19th September 2012 SIG Report
ETSI BRAN Update (IEEE Co-Existence Workshop)
Testing Task Force process overview
Presentation transcript:

STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -

Overview Scope Members of STF421 Deliverables Status and planning STF421 overview 2

Scope of STF421 The STF421 develops a set of specifications for the certification test of the CEN DSRC - ITS G5 coexistence mechanisms and the ITS – G5 Dynamic Congestion Control (DCC) mechanisms. STF421 overview 3

Resources of STF Person Days from to STF 421 Member: Paul Alexander (not on photo) Friedbert Berens (STF Leader) Madalina Tepelmann Peter Schmitting Dieter Smely With support from the ETSI CTI (Sebastian Müller) Photo with Christoph Wöste (TC ITS WG4 Chairman) STF421 overview 4

Schedule and planning of STF421 Initial interims report to EC: 30. September Ready for ETSI 1. September Stable draft of coexistence deliverables until Q4/2011 Early draft of DCC deliverables until Q4/2011 Final draft of deliverables for TC approval end Q1/2012 Final report EC: 30. June 2012 Ready for ETSI approval in 1. June 2012 STF421 overview 5

Milestones of STF Milestone A: ITSWG4#15 (21 June), ETSI Progress Report #1 and first draft of DTS/ITS (PICS), DTS/ITS (TSS&TPs), DTS/ITS (ATS). Milestone B: 1 st September 2011 Interim Report to be approved by EC/EFTA. The Interim Report must be delivered by the STF Leader to the ETSI Secretariat before 1st September The deadline for delivery to EC/EFTA by the ETSI Secretariat is 30 September; EC/EFTA approval is expected mid- November Milestone C: ITS#9, ETSI (October 2011) Progress Report #2 and stable drafts of DTS/ITS , 023, 025 First drafts of DTS/ITS (PICS), DTS/ITS (TSS&TPs), DTS/ITS (ATS) STF421 overview 6

Status of STF421 Preparatory meeting: 17. February 2011 in Sophia Antipolis First Technical Meeting and Milestone A achieved Activities is dependent on initial work in STF420 and ITSWG4 Coexistence AdHoc group STF421 overview 7

Deliverables 1. Coexistence of cooperative ITS G5 with RTTT DSRC DTS/ITS (PICS) DTS/ITS (TSS&TPs) DTS/ITS (ATS) 2. Channel congestion control algorithms operating in the 5.9GHz range DTS/ITS (PICS) DTS/ITS (TSS&TPs) DTS/ITS (ATS) STF421 overview 8

Document schedule 1. Phase DTS/ITS (PICS): DSRC/G5 Radio Test TS – 1 First version early draft: 21.June Stable draft: October 2011 DTS/ITS (TSS & TPs) : DSRC/G5 Radio Test TS – 2 First version early draft: 21. June Stable draft: October 2011 DTS/ITS (ATS) : DSRC/G5 Radio Test TS First version early draft: 21. June Stable draft: October STF421 overview

Document schedule 1. Phase DTS/ITS (PICS): G5 Radio Test TS – 1 First version early draft: October 2011 Stable draft: Q1/2012 DTS/ITS (TSS & TPs): G5 Radio Test TS – 2 First version early draft: October 2011 Stable draft: Q1/2012 DTS/ITS (ATS): G5 Radio Test TS First version early draft: October 2011 Stable draft: Q1/ STF421 overview

11 End Comments and Inputs Thank you for your attention For more Information STF421: overview