San Joaquin River Restoration Program State of the Rivers Symposium San Joaquin County Ms. Alicia Forsythe May 2, 2011.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

MORE WATER Phase I Reconnaissance Report C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County Public Works Board of Directors Update February.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
Reclamation Plan Project Purpose: To Satisfy Syar’s Reclamation Obligation under SMARA for the Healdsburg Terraces (Basalt, Phase I, Phase II and No Name.
 What is a TMDL?  San Joaquin River DO TMDL Overview  TMDL Control Program & Phase II MS4 Permit Sue McConnell (Senior WRCE) (916) Christine.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
California: “Water Flows Uphill to Money” DZ05 Lecture 12/5/2005 Sources: Cadillac Desert, by Marc Reisner, 1993, and POD Documents.
Drought and the Central Valley Project August 2014.
Stock Status of Steelhead In California Katie Perry, California Department of Fish and Game.
1 Regional Report San Joaquin River Hydrologic Region.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
CVP FRIANT DIVISION San Joaquin River Settlement FriantDamFriantDam Sacramento San Joaquin Delta Sacramento Merced River.
Southern California Water Dialogue
Urban Water Institute Conference August 22,
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
California’s Water Supply Chris Scheuring California Farm Bureau Federation.
Study for Fish Screens at Existing Delta Facilities Dr. Leah Orloff Water Resources Manager CUWA Board MeetingJuly 24, 2009.
Draft Recommendations of the San Joaquin Water Quality Management Group Plan for Achieving Salinity/Boron and DO Objectives Plan for Achieving Salinity/Boron.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Snow Groundwater Rain What are California’s Major Sources of Water?
Pyramid Lake Paiute Tribe Water Rights Settlement Presented by: Terri Edwards, Area Manager Lahontan Basin Area Office August 26, 2015.
Water Power By: Andrew Paulshock.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Each person needs a piece of paper. On one side: Draw California: Identify and Label – Mountains: Sierra Nevada, Coast Range, Klamath Mountains, San Gabriel.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
CALSIM II - San Joaquin River Basin Refinements and Results Presentation by Dan Steiner On behalf of the San Joaquin River Group Authority March 14, 2005.
Project Status South Delta Improvements Program Project Status November 2003.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Sierra Water Workgroup Summit Daniel Schultz State Water Resources Control Board Division of Water Rights June 12, 2014.
DeltaKeeper a project of WaterKeepers Northern California Dan B. Odenweller Fishery Biologist
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Drought Management Sheri Looper CVP Water Resource Specialist.
San Gabriel Valley From Stormwater to Supply
Fish Passage Workgroup Meeting October 1, 2015.
SACRAMENTO WASHINGTON, DC SOUTHERN CALIFORNIA NORTHERN CALIFORNIA Federal Drought Relief Legislation – What’s It Gonna Take? February.
Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
MORE WATER Phase I Reconnaissance Report C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County Public Works Board of Directors Update February.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
The Geography of Water in California. Water in California History of California Water Modern Water Projects Problems/Challenges to the California.
Trinity Lake Minimum Pool and Enforceable Temperature Standards for the Trinity River Tom Stokely, Pacific Coast Federation of Fishermen’s Associations.
Top Five Reasons South Bay Needs WaterFix
Presented by Jon Traum, P.E.
Water Resource Management Planning Update
CWEMF Annual Meeting March 2005
Water in California Colorado River Aqueduct
Top Five Reasons South Bay Needs WaterFix
In-Delta Storage Program
2018 November Water Bond Act Initiative Benefits to Kern County
Water Resource Management Planning Update
San Joaquin River Exchange Contractors Water Authority
San Joaquin River At Crows Landing 30 June 2010.
Don Pedro Project Relicensing
In-Delta Storage Program
Sacramento Environmental Commission January 2019.
Presentation transcript:

San Joaquin River Restoration Program State of the Rivers Symposium San Joaquin County Ms. Alicia Forsythe May 2, 2011

2 Settlement History Friant Dam Sacramento Fresno Merced River San Francisco San Joaquin Friant Dam Completed Lawsuit filed challenging Reclamation’s renewal of the long-term contracts with Friant Division contractors Federal Judge rules Reclamation violated Section 5937 of the California Fish and Game Code Settlement negotiations reinitiated to avoid remedy phase Settlement reached, implementation begins Federal legislation enacted; Interim Flow releases began October 1

Settlement Goals Restoration Goal –To restore and maintain fish populations in “good condition” in the main stem of the San Joaquin River below Friant Dam to the confluence of the Merced River, including naturally reproducing and self-sustaining populations of salmon and other fish. Water Management Goal –To reduce or avoid adverse water supply impacts to all of the Friant Division long-term contractors that may result from the Interim Flows and Restoration Flows provided for in the Settlement. 3

Study Area 153 miles of the San Joaquin River –Friant Dam to the Merced River Confluence Fresno Firebaugh Newman Los Banos

Major Milestones 2006Began work on planning, design work, and environmental reviews 2009Began Interim Flows October Issued Draft Program EIS/R April Issue Final Program EIS/R and Record of Decision 2012 (late)Begin re-introduction of salmon 2013Complete first phase of channel and habitat improvements (some delays) 2014Initiate full Restoration Flows 5

Major Channel and Structural Improvements Settlement requires 10 specific channel and structural improvement projects to address: –Channel capacity limitations –Fish habitat limitations –Fish passage and entrainment issues Combined into 4 major projects 3 underway, 1 to start in late 2011 All targeted for completion by end of

Site-specific Projects Underway Mendota Pool Bypass and Reach 2B Channel Improvements Project –Draft EIS/R – mid 2012 Reach 4B, Eastside Bypass and Mariposa Bypass Channel and Structural Improvements Project –Draft EIS/EIR - mid 2012 Arroyo Canal Fish Screen and Sack Dam Fish Passage Project –Draft EA/IS – late 2011

Interim Flows – Increased Releases from Friant Dam Began October 1, 2009 Purpose is “... to collect relevant data concerning flows, temperatures, fish needs, seepage losses, recirculation, recapture and reuse.” Reconnected the upper San Joaquin River with the Delta in 2010 Reach 2 in July 2009Reach 2 in November 2009

Alicia Forsythe Program Manager