Title Subtitle Name Title The Collaborative for High Performance Schools (CHPS) Whole Building Commissioning – The New Standard James Becker, PE, CxAP,

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Sam Sleiman,
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
Commissioning (Cx) EPWOG Meeting October 21, 2003 Washington, D.C.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
January 12, 2012 Commissioning Services. June 13, 2011  Genesis Commissioning Capabilities  What is Commissioning (Cx)/Retro-Commissioning (RCx)? 
Building Enclosure Commissioning (BECx): Practical Project Implementation.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Building Commissioning
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
The Importance of the Qualifications Based Selection (QBS) Process
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning/Energy Performance Contracting.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
Agency Construction Management :CM NOT AT-RISK
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
Chapter 8 - Integrative Process
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
the Basic Commissioning (Cx) Process
PLANNING FOR A NOAA SCIENCE CENTER June 28, 2000.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Green Building Certification Systems for Existing Buildings John Park, PE, CEM, CSDP Dept of Veterans Affairs June, 2009.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Introduction to LEED Building Commissioning
Overview What is commissioning (short version)
Energy Savings Performance Contracts & Energy Service Companies
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Implementing Effective Energy O&M Strategies on a Limited Budget
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Presentation transcript:

Title Subtitle Name Title The Collaborative for High Performance Schools (CHPS) Whole Building Commissioning – The New Standard James Becker, PE, CxAP, LEED AP Interagency Briefing February 3, 2015 Enlightened Buildings

Introductions Dave Lowe Director Government Solutions James Becker PE, CxAP, LEED AP Principal of Commissioning

Welcome

Disclaimer This event is not affiliated with or endorsed by the any agency and is provided to the audience for informational purposed only. All participation in this briefing is voluntary and any engagement by government personnel is not an indication of endorsement of, or commitment to purchase from, any vendor.

Questions??? Enter Audio Pin so We can unmute you #(number)# Why are you here? Third Party Requirements for Building Commissioning Webinar ID

About 3QC LEED & Commissioning Services Firm LEED Experts – LEED Fellow on staff 12+ Years of Commissioning Experience Offices throughout California and in Maryland Technical Experts – 5 Licensed Engineers, 8 Cx Agents Multi-Site Program Expertise Metrics Oriented Significant Healthcare & Office Building Experience Collaborative Process/Team Building GSA Schedules 03FAC & 871PE

Why Are You Here? 40% - What is whole building commissioning? 28% - How does 3rd party commissioning effect the construction schedule? 15% - Why are separate contracts important? 9% - How can I verify commissioning agent qualifications?

This Would Be Best Ever… Dale (Navy) - we had a primer/overview to read/keep Susan (USACE) - I am able to learn how the commissioning is important to a design-build project. Brian (GSA) - a way to estimate approximate cost of 3rd party commissioning over a range of building complexities were included Rex (DoE) - This will be the first experience with a new building and I need to understand requirements Bill (NOAA) - There was also a discussion on pre-fabricated ancillary buildings only costing around ~$150K

This Would Be Best Ever… Roy (Army) - Won't know until I hear the briefing. Andrew (VA) - I obtained a better knowledge of the Building Commissioning process. Ashley (VA) - Information is presented in clear concise manner. Deborah (VA) - Sample or template documents used in a contracting production setting are supplied. i.e. Tech Eval of commissioning agents etc. Delia (VA) - An elevator version can be a key takeaway

Session Objectives 1.Federal Initiatives 2.Whole Building Commissioning Overview 3.Why a Separate Contract is Important 4.Typical Project Challenges 5.Cost of Commissioning 6.Commissioning Benefits 7.Risk Mitigation (Avoiding Gotcha’s)

Federal Initiatives April 2005 – GSA Building Commissioning Guide January 2006 – Government Wide Memorandum of Understanding for High Performance Buildings Integrated Design Principles Commissioning Measurement and Verification January 2007 – Executive Order October Executive Order Environmental Goals May 2014 – VA Whole Building Cx Process Manual June 2014 – VA Retro-Cx Process Manual October 2014 – VA CFM Requires Separate Contracts

Common Definitions Cx – Commissioning CxA – Certified Commissioning Agent / Authority 3PCx – Third Party Commissioning OPR – Owners Project Requirements BOD – Basis of Design FTP – Functional Test Plan

Commissioning Types LEED Cx – Primarily focused on new building energy systems – MEP and renewable energy systems Whole Building Cx – Includes additional building systems – Enclosure, Doors, Windows, Roof, Network & Low voltage Retro Cx –The commissioning process for existing buildings and/or existing systems

MEASURE VERIFY MEASURE VERIFY ACCEPTANCE CONSTRUCTION OCCUPANCY DESIGN PRE-DESIGN What is Whole Building Commissioning?

Owner’s Project Requirements Basis Of Design Cx Plan Design Develop Review Cx Specifications CD Review Site Visits Equipment Testing Quality Checklists Owner Training Cx Report Functional Testing Submittal Review Systems Manual Seasonal Testing Warranty Review Goals Workshop MEASURE VERIFY MEASURE VERIFY ACCEPTANCE CONSTRUCTION OCCUPANCY DESIGN PRE-DESIGN BEST PRACTICES COMMISSIONING PROCESS What is Whole Building Commissioning?

Why Commissioning? 1.Capital Projects Require it 2.LEED Requires it 3.Energy Savings 4.Reduced GHG Emissions 5.Occupant Comfort 6.Complex Systems and New Technology 7.Quality Focus 8.Reduces Risk 9.Owner’s Satisfaction 10.Reduced Downtime of Facilities

Why Separate Contract? Agency Requirements Coming Eliminates potential conflicts of interest Control: pre-design - occupancy True autonomy to act on agency behalf Empowers the owner Minimize Delays Minimize Change Orders (an early) ^

Survey +600 Respondents

Common Issues Lawrence Berkeley National Laboratory Study (Piette 1994) –40% of Buildings with HVAC Problems –33% of HVAC Sensors Non-Functional –15% Missing Specified Equipment 1998 US Naval Facilities Command Study –New Buildings with Significant Problems –Heating & Cooling Top of the List

Complex Systems!

Common Project Challenges Design Review Process –Design Submittal Status / Construction Ready Docs? –Design-Build Document Challenges Project Communication Defining Work Completion –Pay Applications –Completing the Project Schedule Delay Commissioning provides solutions to the following typical project challenges:

Common Project Challenges System Readiness –Final Inspections / Punchlist –Substantially Complete Building Turn-Over –Owner Training –O&M Manuals –Systems Information Warranty Support –High Performance Systems

Cost of Commissioning Dependent on Scope of Work –Economy of Scale –Number of Commissioned Systems Dependent on Complexity of Systems Dependent on Contract Method Industry Cost Range –Whole Building Cx 0.5% to 1% of Total Construction Cost Payback - Savings –$4 for every $1 Spent (pg. 15 of VA Cx Manual) –Does not include cost of down time

Third Party Requirements for Building Commissioning Webinar ID Questions & Answers

Benefits of Commissioning Higher Quality of Finished Product Fewer Change Orders Fewer Contractor Call Backs Lower Energy Bills Better Trained O&M Staff Reduced Operating Cost Occupant Satisfaction

Benefits of Commissioning Higher Quality of Finished Product Fewer Change Orders Fewer Contractor Call Backs Lower Energy Bills Better Trained O&M Staff Reduced Operating Cost Occupant Satisfaction Better Service for Vets

Procurement Options 03FAC – GS-21F-0090Y 871PE – GS-10F-0159Y DUNS: CAGE: 49UL6

Session Follow-up Copy of Presentation Links to Cx Manuals Links to Federal Memoranda Q&A Sample Requirements

Title Subtitle Name Title The Collaborative for High Performance Schools (CHPS) Thank You for Joining us! James Becker CEO 3QC (916) Dave Lowe Director, Government Solutions (202)

CxA Qualifications Knowledge of design process Knowledge of construction process MEP systems experience Control systems experience Broad knowledge of building systems Understanding of LEED Building Commissioning Association key attributes Ability to communicate

Successful Project Examples VA Housing and Care Facilities - Redding & Fresno CA $65,000,000 / $122,000, ,000 SF / 216,000 SF Enhanced Commissioning Central Plant Hot & Chilled Water Building Automation System Low Voltage Integration Fire Alarm System Security Systems Risk Mitigation – Early Inspection Systems Confirmation

Successful Project Examples Martin Luther King Medical Center - Los Angeles, CA $240,000, ,000 SF Multiple Buildings / Contractors Existing Campus Coordination Fire Alarm System Building Envelope Building Automation Systems Lighting Controls Normal & Emergency Power Central Plant Replacement Long Lead activities identification Submittal Review 5 days Average

33 Successful Project Examples Administrative Office of the Courts $1,258,000,000 1,740,000 SF Enhanced Commissioning LEED Certification LEED Silver / Gold Facility Security Systems Detention Security Systems Public Safety Features CM at Risk LEED M&V Multiple Projects Schedule Management

Title Subtitle Name Title The Collaborative for High Performance Schools (CHPS) Thank You for Joining us! James Becker CEO 3QC (916) Dave Lowe Director, Government Solutions (202)