LOAD FORECAST SECTION 1. 2 FORECAST METHODOLOGIES & TOOLS i.Power Market Survey (PMS) Medium Term (5-10 years) ii.Regression Long Term (25-30 years) LOAD.

Slides:



Advertisements
Similar presentations
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Advertisements

BI Marketing Analyst input into report marketing Report TitleElectricity in South Africa Report Subtitle Country profile of power sector, market trends.
BI Marketing Analyst input into report marketing Report TitleElectricity in Mauritius Report Subtitle Country profile of power sector, market trends and.
Software Analysis Tools
AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.
Study Committee Representatives Annual Report December, 2012
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Sistan & Balouchestan Electric Power Distribution Company
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
1 Second Workshop on Power Sector Reform – Role of NEPRA Lahore: November 12, 2010.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
EQUITABLE. Description Electricity GWhKWh per person% of total Sindh-Karachi10,0521, Sindh-Rural5, Punjab46, Khyber Pakhtunkhwa8,
Khalid Saeed Head Energy Research Centre COMSATS Institute of Information Technology, Lahore Campus.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Fostering Infrastructure Development in Africa AFRICAN DEVELOPMENT BANK GROUP Bocar Cisse Senior Financial Analyst, African Development Bank NEPAD-INFRASTRUCTURE.
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Turkish Power System Overview March 2012
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
HYDRO POWER POTENTIAL AND INVESTMENT PROSPECTS IN GILGIT-BALTISTAN
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Art Deller ROS/WMS Update October 2013 RARF Data Completion Project.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Public Service Commission of Utah Workshop 12/4/2007 Generation Interconnection Utility perspective Rocky Mountain Power Les Bahls, director transmission.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
REAL TIME BALANCING OF SUPPLY AND DEMAND IN SMART GRID BY USING STORAGE, CONTROLLABLE LOADS AND SMART GENERATIONS Abdulfetah Shobole, Dr. Arif Karakaş.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
BI Marketing Analyst input into report marketing Report TitleElectricity in Madagascar Report SubtitleCountry profile of power market trends and investment.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
ERCOT Black Start Enhancements
The Procedure & Principles of Awarding Distribution Tariffs
Zahrani & Selaata IPP Projects
DEC System Voltage Planning - June 2018
Yangon Region Rural electrification plan
ENCLAVE POWER COMPANY LIMITED
Software Analysis Tools
Presentation transcript:

LOAD FORECAST SECTION 1

2 FORECAST METHODOLOGIES & TOOLS i.Power Market Survey (PMS) Medium Term (5-10 years) ii.Regression Long Term (25-30 years) LOAD FORECASTING

3 DISCO-WISE PEAK DEMAND PMS OUTPUT (MW) Name LESCO GEPCO FESCO IESCO MEPCO PESCO HESCO QESCO TESCO SEPCO DISCOs Demand (undiversified) DISCOs Demand (Diversified) T & T Losses (500 & 220kV) % T & T Losses (500 & 220kV) 3.05 NTDC Demand Auxiliary Consumption % Auxiliary Consumption 1.68 System Demand ( w/o Export to KESC) Export to KESC 650 System Demand With Export to KESC

4 FUTURE DEMAND & SUPPLY PROJECTION BY PLANNING POWER NTDC IN YEAR 2000

GENERATION PLANNING SECTION 5

GENERATION PLANNING SOFTWARES Worldwide used softwares  WASP (Wien Automatic System Planning)  SYPCO (System Production Costing Program) Other softwares  Power Balance System

Long Term Generation Expansion Plan Demand & Supply Projections Reports Being Published by Generation Planning Section 7

TRANSMISSION PLANNING SECTION 8

Transmission Planning Section is Responsible for We follow NTDCL Grid Code approved by NEPRA.” Preparing/updating transmission expansion plan. Proposing new substations and transmission lines. Proposing site & Interconnection schemes for power dispersal of all types of new power plants, both in public and private sectors. Review of feasibility studies/reports submitted by consultants. Providing technical support/consultancy services to the upcoming IPPs, DISCO(s) and KESC. 9

Load flow studies Short circuit studies Transient stability studies Power quality studies System Studies Being Carried Out 10

Following software tools are being used by leading consultants and electric utilities worldwide; Power System Simulator for Engineering (PSS/E) Power System Computer Aided Design (PSCAD) Transmission Planning Section has version 32 of PSS/E and is currently negotiating with Siemens to; Update PSS/E by acquiring its latest version 33 through Maintenance & Support (M&S) support. Purchase a multiuser wireless license of PSS/E. Purchase additional modules of PSS/E for advanced analysis Optimal Power Flow (OPF) Eigenvalue and Model Analysis (NEVA) Graphical Model Builder (GMB) Softwares Being Used by Transmission Planning Section 11

PROJECT PLANNING SECTION 12

Preparation of PC-I(s) for NTDC Development Projects Preparation of PC-II(s) for feasibility studies of mega Projects Preparation of Future Development Plan Preparation of Investment Plan Financing arrangements through International Financing Agencies Preparation of PC-I(s) and PC-II(s) for Public Sector Thermal Power Projects Responsibilities of Projects Planning Section 13

14