ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314

Slides:



Advertisements
Similar presentations
Review Week 6 CVL 305A.
Advertisements

Area calculation.
NameEnrollment noRoll no PATEL KRUPALI SHAH JENNY NAYAK KHUSHBU GAMIT ZANKHANA Guided by - Mr.
Session 9 AREA MEASUREMENT Course: S0663 – Land Surveying Year: 2007.
Interpreting a contour map
Earthmoving Materials and Operations
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
ERT252/4 GEOMATICS ENGINEERING
Lecture 3 Earthmoving Materials
Wes Marshall, P.E. University of Connecticut January 2007 CE 276 Site Design Chapter 2 – Interpolation & Slope.
CONTOURING An Edusat Lecture on by:- MOHINDER KUMAR
Earth Science – Unit 1.1 Reading Topographic Maps
FIELD METHODS IN ENVIRONMENTAL GEOLOGY LABORATORY GEOS 3110
Chapter 13 Site Plan Layout.
Geology and Surveying (Part B - Surveying) Volumes and DTMs
GEOTECHNICAL PROPERTIES (CE1203)
Land levelling design methods - plane method
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
CE 453 Lesson 24 Earthwork and Mass Diagrams
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Faculty of Engineering Technology
Contour lines. Contour lines: curved lines drawn on the map, connecting points having the same elevation.
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
CE 303: Introduction to Construction Blueprint Lab.
Dimensioning & Scaling
Areas and Volumes Introduction Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2008/2009 Surveying.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Planning for Earthwork Construction
DigitalTerrainModelling: 1 Digital Terrain Model also known as –digital ground model (DGM) & –digital height model (DHM) a method of representing the.
E4014 Construction Surveying Road Construction Plans.
4B. Outcrop_Pattern_Cross-Section_Profiles
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
SUBJECT - SURVEYING – I SUB.CODE - CE6304
AREA METHODS Often a need to calculate areas from existing plans or from measurement taken on site.
Geologic Geometry. TOPOGRAPHIC MAPS Many problems in mining and civil engineering are solved by graphic communication.
PRESENTED BY : TAILOR SHIVOM R GOVERNMENT ENGINEERING COLLEGE, DAHOD CIVIL ENGINEERING DEPARTMENT ACTIVE LEARNING ASSIGMENT SURVEYING ( )
USE OF PLANIMETER,COMPUTATION OF VOLUME FROM CROSS SECTION
Handled by, R.PRADEEPA, M.E Assistant Professor, Department of Civil Engg, PITS.
EXERCISE: A 0.04ha pond has to be built in clayey soil with dikes 1.50m high and 1m wide at the top. If SD = 1.5: 1 and SW = 2:1. Calculate the base width.
Surveying Prepared by : Aakash lad Deep lad Denish lathiya Priya mahida Pinkesh mesuriya.
Interpreting a contour map
Investigation of Road Project By S.N. Nanaware
Part- I {Conic Sections}
Drawing Longitudinal & Cross Sections
Investigation of Road Project
Mr. Vedprakash Maralapalle, Asst. Professor
Long sections eg road cuttings Deep sections eg basement excavations
Rectangular Coordinates Level control in trenches
Geologic Geometry.
Visit for more Learning Resources
Topographic Survey Introduction „ Mapping surveys are made
Earth Science – Unit 1.1 Reading Topographic Maps
Visit for more Learning Resources
Topographic Survey Introduction „ Mapping surveys are made
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
ADVANCE SURVEYING.
ADVANCE SURVEYING.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Section II Applications of Measurements
AREAS AND VOLUMES.
AREAS AND VOLUMES.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Methods of computing area
Chapter 6 Construction Quantity Measurement
Engineering Surveying Linear Survey
Presentation transcript:

ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314

EARTHWORKS AREAS & VOLUMES Introduction: Areas and Volumes estimation is basic to most engineering schemes/projects such as route alignment, reservoirs, tunnels, etc. Excavation and hauling of materials on projects are always significant and costly. The calculation of areas may be based on data scaled from plans or drawings or data gained directly from survey field data. Computation from field notes Computation from plotted maps or plan Graphical method Instrumental method Mid-ordinate rule Average ordinate rule Trapezoidal rule: This assumes that the short length of boundary between the ordinates are straight lines.

Earthworks contd. Exercise Simpson’s rule: This assumes that the short lengths of boundary between alternate ordinates are parabolic curves. The areas of such a segment will be where p is the mid-ordinate of the segment. Exercise The following offsets were taken from a chain-line to a hedge Compute the area included between the chain line, the hedge and the end offsets by Simpson’s rule Prove that on a uniformly sloping ground the X-sectional area of a cutting or an embankment is given by the following equation, where d1 and d2 are the horizontal distances from centre line to the limits of the side slopes, b is the formation width of the cutting or embankment and 1 vertical in s horizontal is the gradient of the side slopes. Distance 20 40 60 80 120 160 220 280 Offset 9.4 10.8 13.6 11.2 9.6 8.4 7.5 6.3 4.6

Volumes Use of Cross-sections: Usually sections are taken at intervals and at points of intersect on the project. The spacing of the section depends on the general characteristics of the ground and the desired accuracy of the earthwork computations. Mean Area Trapezoidal rule Prismoidal Formula Prismoidal Correction

Use of Spot heights Whenever earthwork is required for large excavations, the site is divided into triangles, squares or rectangles of equal areas of convenient sizes. Use of Contours The estimation of the capacity of a reservoir may be easily determined with the help of contour map. It is also applicable to volumes of materials stocked while awaiting distribution. The area enclosed by each contour line is normally measured with a planimeter. The trapezoidal or Simpson’s formular is applied in getting the volume. Construction volumes Mass Haul Diagram: In works where large volumes of earthwork have to be handled (such as railways and arterial roads) a mass- haul diagram is of great value both in planning and construction. A mass haul diagram or curve can be drawn subsequent to the calculation of earthwork volumes, its ordinates showing cumulative volumes at specific points along the centre line.

Exercises At a certain station an embankment formed on level ground has a height at its centre line of 3.10m. If the breadth of formation is 12.50m, find the side widths and the area of X-section given that the side slope is 1 vertical to 21/2 horizontal. An embankment is formed on ground that is level transverse to the embankment but falling at 1 in 20 longitudinally so that three sections 20m apart have a centre-line heights of 6.0, 7.6 and 9.2 respectively above original ground level. If side slopes of 1 in 1 are used, determine the volume of fill between the outer sections when the formation width is 6.0 m, using trapezoidal rule. Given below are data for a reservoir, the areas are the ones that will be contained by a proposed dam and the corresponding contour lines: Calculate the volume of water impounded if the water level at peak volume is at elevation 630m. Contours (m) Areas enclosed in hectares 610 22 615 110 620 410 625 890 630 1158

HYDROGRAPHIC SURVEYING Introduction Mean Sea Level Shore-line surveys Position fixing from observed bearing by resection on ranged lines by intersections cross-rope depression angles

SETTING OUT Introduction Preliminaries General principles Plans Layout-working drawings Setting out plan As-built drawing Setting out a building

Setting-out (Contd.) Positioning Techniques From existing details From Coordinates Setting out by bearing and distance Setting out a pipeline Horizontal control Vertical Control

PHOTOGRAMMETRY Introduction Elements of photogrammetry General principles Uses and application Evaluation of photographs