Rob Semple Business Unit Director Contour Premium Aircraft Seating

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

SUPPLIER PARTNERSHIP An efficient SCM , built on strong partnerships will create high levels of people satisfaction and customer satisfaction. Ensuring.
1 PERFORMANCE GOALS AND TARGETS AS PART OF ECONOMIC REGULATION OF ANSPs The UK experience of economic regulation Presented by Harry Bush CB Group Director.
Profitable Partnership Opportunities
K & D DIVERSIFIED 3745 W. WAHALLA LN GLENDALE, AZ RVENG.NET Tooling & Manufacturing Engineering K & D’s capabilities consist of these.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
ASM & COAA Adding Value to Alberta Energy Sector projects.
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Automation (21-541) Sharif University of Technology Session # 5
Energy Efficiency Commitment : A view from energy suppliers Russell Hamblin-Boone Head of Corporate Affairs.
1 EMBRAER VISION FOR IFE SYSTEMS Aristides Cintra
The role of DECs, ESOS and other Regulation in identifying energy saving opportunities Malcolm Hanna, Technical Director, National Energy Foundation Improving.
Concurrent Engineering
Marketers Understanding Engineers and Engineers Understanding Marketers: The Opportunities and Constraints of a Cross- discipline Course Using 3D Printing.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
HEAnet Wireless Strategy. Brief Investigate nationally ubiquitous wireless access to the HEAnet network for all HEAnet clients. Identify all potential.
LogNet Information Technologies PLC May Innovative software company of customer experience solutions for multiple verticals Core products include.
Copyright © 2007 Pearson Education Canada9-1 Chapter Nine New Product Development and Product Life Cycle Strategies with Duane Weaver.
Preparing Your Business Plan
Copyright © 2007 Pearson Education Canada9-1 Chapter Nine New Product Development and Product Life Cycle Strategies with Duane Weaver.
Developments in the Airline Industry L.O: to know the main changes in the airline industry, and how this has impacted upon travel and tourism. ALL must.
Aero Certification LLC - Proprietary & Confidential Aero Certification & Engineering Capability & Experience Summer 2006.
New Spas by JHR&C. Origin of word “spa” Spa - town in Belgium.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
RSA – Accenture Insurance Solution
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Chapter 15 Systems Development. 2 Learning Objectives When you finish this chapter, you will  Understand the systems development life cycle.  Be able.
Copyright  Purchasing Mega-Trends  Federal Strategic Sourcing Initiative (FSSI)  FSSI Impact on 8(a) Program  Supplier Assessment Process 
Independent Analysis of In-Flight Portable Media Players Walé Adepoju – CEO Thursday 24th May
SOFTWARE ENGINEERING MCS-2 LECTURE # 5. RAD (RAPID APPLICATION DEVELOPMENT) MODEL  In RAD model the components or functions are developed in parallel.
Computers Are Your Future Eleventh Edition Chapter 13: Systems Analysis & Design Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
Delcam Professional Services Antony Hall Business Development Manager Delcam plc.
1 By: Rozita Tavakolian. Introduction  Initiator: Markus Merz, 1999  The first attempt to design an entire automobiles using open source principles.
Learning Objectives Compare the logistics of delivering a product to a local, national or international market Describe the key factors that influence.
PRIMEX Aerospace Company Page 1 Connecting Online Inflight A Passenger’s Perspective.
DAK L&E Processes and Tools Boeing-Lean Engineering Public Release Control No Boeing Phantom Works Lean and Efficient Processes and Tools.
2 nd Annual Babcock/Eno River Capital Elevator Competition March 31, 2001 Michael McCorquodale, Chief Executive Officer Mobius Integrated Systems Corporation.
1 Exhibit 1: Integrated Product Development (IPD) – Level 1 Innovation is the engine driving revenue growth Innovation Engine Manufacturing Products New.
Rushcliffe – great place, great lifestyle, great sport Rushcliffe Borough Council – Growing a social franchise 10 July 2013 Neil Clarke, Leader.
AirTran ® : The Customers Aliya Kassam, Vi Le, Kendra Roundtree BAA.603: Marketing Concepts and Practices April 12, 2006 “Welcome Aboard, Travelers”
2014 Airbus Creating better ways to fly Airbus corporate presentation.
Introduction to the Avocet ProJet Introduction to the Avocet ProJet SpeedNews Eighth Regional & Corporate Aviation Suppliers Conference November 3, 2003.
Ultra Efficient Lighting For Future Wards LCB-HEALTHCARE Pilot Project Steph Holmes MCiPS Head of Procurement The Rotherham NHS Foundation Trust.
LEADSCALE GROUP Partnership Presentation. Contents 1:Introduction 2:How we can help you 3:Enrichment (Case Study) 4: Overview 5:Q&A.
CHAPTER 8 Creating the Product
February 21, 2000 Kimberly Pastega February th WAEA Workshop Seat/IFE Integration Team Members: Steve Normington.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Building Performance Evaluation £8m funding between 2010 & 2014 Case study investigations Identify factors that encourage good performance Domestic &
THE ONLY SOURCE OF KNOWLEDGE IS EXPERIENCE Albert Einstein
Over 50 years of excellence Premium Interiors and IFE – Maintenance- Mods & Optimization Workshop MRO – Europe October 2015 Presented.
© The Delos Partnership 2005 Dairygold Workshop Strategic Sourcing Process.
2016. Our Focus -Data Management Solutions & Analytics Datacentre Security Analytics.
The content of this presentation is provided as information only, is the property of Sukhoi Civil Aircraft Company and shall not be copied or used without.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
NA Sales Training 2007 The Digital Marketing Space.
Canadian SNOMED CT Strategy October 2012 Draft. Content 1 Background Approach Current State Future State Considerations Action Plan.
Copyright  Purchasing Mega-Trends  Federal Strategic Sourcing Initiative (FSSI)  FSSI Impact on Small Businesses  Supplier Assessment Process.
© Copyright Global Eagle Entertainment Inc All Rights Reserved Proprietary and Confidential Information Global Eagle Entertainment's.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
Contents A GENERIC IT BALANCED SCORECARD
MODERN TRENDS IN PRODUCTION ENGINEERING
Company Presentation.
Customized Maintenance in the Cabin Panel Session
Lockheed Martin Canada’s SMB Mentoring Program
Global Aerospace Interior Market : Trends, Forecast, and Opportunity Analysis 1.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Presentation transcript:

Rob Semple Business Unit Director Contour Premium Aircraft Seating Designing Future Premium Aircraft Seating Interiors…... and the implications for IFE Rob Semple Business Unit Director Contour Premium Aircraft Seating

Contents The Premium seat market background Today’s market - Air Canada Solar Eclipse case study Design brief and programme attributes Seat design process Working differently IFE issues and implications

The Premium Seating Business Contour produces innovative and creative seating products targeted at the First and Business Class markets 1st Lie-flat bed in the sky (British Airways first class)….. Introduced 1997 1st commercial swivel seat (American Airlines first class) 1st lie flat at an angle business class (Cathay Pacific business class) 1st full lie flat business class (British Airways) Virgin Upper Class Suite Emirates Super First Class mini suites Seats are complex electro-mechanical devices with typically 600 to 1,300 part numbers per seat 60% to 70% of Contour business is retrofit Seats sell for £10k to £120k ea; with non-recurring of £0.5m to £10m Seats are typically installed for a 5 to 7 year life There are many new “2nd Generation” seat programmes underway

What our customers want... Premium passengers buy based on schedule, price, and…. increasingly on the customer experience: Cabin service Seat/suite Cabin “ease of use” (IFE, lavatories, stowages etc) Airlines want a tailored premium product to differentiate; modern, their style, their brand, their environment Other prominent factors include passenger density and product weight Seats are becoming more complicated but lead-time is rapidly becoming a key factor….

Air Canada Solar Eclipse – case study

Solar Eclipse overall design brief Comfortable full flat bed and comfortable seat Personal space (not shared) & personal stowage within suite Seat to sleep mode without getting up to convert Privacy for working, sleeping & relaxing Ease of delivery of the In-Flight service while maintaining the current crew complement & trolley service Larger aisle to facilitate boarding and service High reliability and ease of maintenance (minimum no of moving parts) Ease of grooming Practical finish (integrating rub strips within styling)

Other key Solar Eclipse programme attributes Required from concept to delivery in an industry leading 14 months…. Integrated cabin solution required – seat/suite and all cabin monuments Absolute and total secrecy required Tremendous personal investment by Airline Chairman and CEO

Solar Eclipse bespoke seat design process 3D CAD Surface data (PDR) CONCEPT Design Freeze/Working Prototype (CDR) ENGINEERING IFE data & definition DETAIL 2 3 6 8 11 13 14 Months MAKE Certification data (& FAI) TEST Deliver IFE hardware delivery BUILD

Solar Eclipse- “working differently” Partnership Working 3 dedicated strong advocates in Customer: Engineering, Product & Maintenance Direct line to CEO, and active positive support of Board members & Chairman Integrated Contour team Industrial design, Engineering, Certification, Production, Procurement, Project Management Early hardware and prototyping 4 concept and styling mock-ups built Design “buy off” completed with working mock-up with 75% production standard parts Supported taking Engineering design to next level Significant Ergonomic and comfort testing Early supplier involvement to influence design Proactive Customer led involvement of Canadian Certification authorities Flow line concept for production assembly

IFE issues and implications… from a seat suppliers perspective IFE suppliers support of the creative phase of seat design is generally poor…. IFE lead-times just do not currently support where the seat market is going Our joint customers find you unresponsive to customisation Flow line seat production means IFE must work.. 1st time… There is significant potential optimisation to be done…… e.g. seat motor power, maintenance features, wireless IFE is integral to premium seat design.… and will get more so

Summary The tailored premium aircraft seat business is vibrant, maximum density, minimum weight and dramatically reduced lead-times are demanded Second generation seats which take the design to the “next level” are now emerging; these balance passenger requirements of comfort and privacy with operational and maintenance requirements Significant parallel work and true partnership working in development is now normal IFE suppliers are not currently fully engaged in premium seat design; there is a tremendous potential opportunity and prize for our mutual Customers….