Piedmont Improvement Program NC Society of Engineers

Slides:



Advertisements
Similar presentations
NEW CENTRE OF LODZ PROGRAMME PRESENTATION Principles of the New Centre of Lodz Programme 2. The objective of the New Centre of Lodz Programme The.
Advertisements

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Mn/DOT Economic Recovery Program Update Feb. 19, 2009.
Highway 19 Mill & Overlay Project. Better Roads for Minnesota.
Virginias Approach to Innovative Intercity Passenger Rail Development and Funding Kevin B. Page Chief Operating Officer Virginia.
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Keeping San Diego Moving SANDAG Capital Program Update
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Coalfields Expressway & ADHS Corridor Q
Rail Service For Santa Cruz Iowa Pacific, Iowa Pacific Safe, high-quality freight and passenger services operator in six states and the U.K. Strong.
Emerging California Passenger Rail Corridors A Comparative Look at the Future For Enhanced Passenger Rail in Coachella Valley/Banning Pass and the Delmarva.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
Managing the Changing Needs of a Rail Office Ronald E. Adams, P. E. Chief, Railroads & Harbors Section Wisconsin DOT.
Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Positive Train Control Benefits
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
City of Charlotte Southeastern Rail-Highway Safety Conference Collaborating for Success With Railroads Carolyn Flowers, CATS CEO November 7, 2012.
N.C. Department of Transportation Southeastern Rail Highway Safety Conference Presented by Michael J. Shumsky, P.E. NS/CSXT Mainline Grade Separation November.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
January Transportation Economic Outlook.
Intermodal Hot Topics GAMPO Conference October 25, 2009.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
John Jay Rosacker Rail—Creating Jobs Locally September 12, 2011 Charlotte, NC.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
Passenger/Freight Railroad Projects in Michigan. 2 Michigan Railroad Network Michigan’s freight & passenger rail system is part of a multi-modal transportation.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
State of Rail in Texas STATE OF RAIL IN TEXAS Erik Steavens Rail Division Director, TxDOT.
STATE CROSSING SAFETY PROGRAMS & FEDERAL CROSSING SAFETY FUNDING CROSSINGS FOR THE 21 ST CENTURY SESSION AASHTO – SCORT MEETING March 14, 2011 – Washington,
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Chicago – St. Louis High Speed Rail Program July 9, 2015
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Elected to first four year term as Mayor of the City of Elyria, Ohio in November 2011 A fifth generation native of Elyria Master of Public Administration,
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
VA-NC Interstate High Speed Rail Compact Current Projects and Initiatives March 21, 2016 Paul C. Worley, Rail Director.
Beyond the Crossroads James Stem National Legislative Director United Transportation Union May 27, 2009.
WHO WE ARE 3.
Oregon State Rail Plan Update
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Regional Roads Committee
Public Private Partnerships
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Construction Management & Inspection
Cooperative Rail Research at TRB
NCRR is helping build a strong economy that benefits the people of North Carolina. We do this most visibly with steel and wood. Even more important, we.
Presentation transcript:

Piedmont Improvement Program NC Society of Engineers August 5, 2011

Objectives Piedmont Improvement Program (PIP) Projects Budget Schedule Approach Coordination Risks

Piedmont Improvement Program (PIP) Modernized Rail and Highway Efficient, Safe and Reliable Freight, Intermodal and Passenger Planning for the Future

Equipment 5 Projects totaling $20 million Purchase and rehabilitate 10 passenger cars Purchase and rebuild 5 locomotives Equipment will support Service Expansion Anticipated Date of Completion November 2012

Station and Facilities 8 Projects totaling $37 million Double Cary Station size, lengthen platform Burlington, lengthen platform Enhance security Expand maintenance facilities RGH and CLT Add canopy at Kannapolis Increase High Point Station parking spaces Security and Public Information Display Systems

Mainline Grade Separation $129 Million Concrete Trench for CSXT’s Mainline Tracks Grade Separates Norfolk Southern Mainline Tracks and CATS North Corridor Tracks Maintains Road and Rail Access to Archer Daniels Midland mill Charlotte Railroad Improvement and Safety Program (CRISP)

Track and Structures 38 Projects totaling $364 million 28 miles of double track 18 new bridges 12 miles of new highway construction 4 miles of passing sidings 24 at grade crossings closed Expands capacity and mobility Improves transportation safety

Double Track Projects Major funded corridor projects New roadway grade separations and crossing closures Railroad alignment improvements to allow future 90 mph operation Major railroad signal system improvements Multiple contracts expected for design and construction Significant expansion of capacity and mobility 8

Budget Funding Source Total (Millions) ARRA $545 $1.5 $4 PRIIA $22 NCRR Norfolk Southern City of Charlotte $41 $3.5 $5 Safety $16 Total $638

Approach to Management Rail Division: Manages NEPA, PE, Final Design - PEF’s Used - Turn-key Designs - Project Management - RFP’s – Track, Structure, Roadway Coordinates with Division of Highways Preconstruction for review support, field Divisions on construction Coordinates with FRA, NCRR, NS, CSXT and Amtrak on contracts, design, scheduling, construction, and reporting

Approach to Delivery Track and Structures 17 PEFs under contract through LSC 19 PEFs under contract or will be by Fall 2011 through RFP NCDOT Lets Highways, Grade Separations, and Railroad Roadbed Projects, Construction Substantially Complete 2013-2016 Norfolk Southern Lets Track work and Railroad Signals – Predominately Constructed in 2015 -2016 NS/CSXT Mainline Grade Separation NCDOT Lets Trench, Associated Roadways, and Railroad Roadbed – Construction to be Done in 2014 – 2017 Track work and signals Let by CSXT

Approach to Construction Highway Elements (roadway and structure) NCDOT Central Let process Railroad Earthwork, grading and drainage for track (ballast down) NCDOT Central Let process; NCDOT manages Track (ballast up) Railroads will utilize contractors through Railroad Special Let Railroad “live track” and signal work Railroad and force account labor

Approach to Construction Coordination with NCDOT Contract Standards and Development Unit to let contracts NCDOT Field Divisions will administer and manage grading contracts NCDOT Field Divisions will contract engineering and inspection services for grading and site work (CEI) NCDOT Rail Division provides oversight of railroad managed construction

Questions www.ncdot.gov www.sehsr.biz www.sehsr.org www.bytrain.org