Tungsten wire & VISAR Goran Skoro 24 October 2008.

Slides:



Advertisements
Similar presentations
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
Advertisements

The ILC low power option Andrei Seryi SLAC ILC08 and LCWS08 November 17, 2008 Photo: Dan Chusid, 2003.
Digital Logic Design Lecture # 17 University of Tehran.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
UKNFWG 12 January 2005Chris Densham Shock Waves in Solid Targets Preliminary Calculations.
Laser Doppler Vibrometer tests Goran Skoro UKNF Meeting 7-8 January 2010 Imperial College London UKNF Target Studies Web Page:
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
MERIT beam spot size (Saturations & projections) Goran Skoro 13 August 2008.
Low beam intensity (MERIT beam spot size – part II) Goran Skoro 30 June 2008.
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Modelling shock in solid targets Goran Skoro (UKNF Collaboration, University of Sheffield) NuFact 06 UC Irvine, August 24-30, 2006.
Mercury Jet Studies Tristan Davenne Rutherford Appleton Laboratory Joint UKNF, INO, UKIERI meeting 2008 University of Warwick, Physics Department 3-4 April.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
LS-DYNA Simulations of Thermal Shock in Solids Goran Skoro University of Sheffield.
Solid Target Studies in the UK Solid Target Studies in the UK Rob Edgecock On behalf of: J.Back, E.Bayham, R.Bennett, S.Brooks R.Brownsword, O.Caretta,
Solid Target Studies for NF Solid Target Studies for NF Rob Edgecock 22 Sept On behalf of: J.Back, R.Bennett, S.Gray, A.McFarland, P.Loveridge &
Tungsten Wire & VISAR Goran Skoro 24 October 2008.
EUROnu and NF-IDS Target Meeting, CERN, March 2008 Progress on Solid Target Studies J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
PST 2007 BNL 1 Development of High- performance Polarized e- source at Nagoya University. Nagoya University M.Yamamoto, S.Okumi, T.Konomi N.Yamamoto, A.Mano,
VISAR & Vibrometer results Goran Skoro (University of Sheffield) UK Neutrino Factory Meeting Lancaster, April 2009.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
1 cm diameter tungsten target Goran Skoro University of Sheffield.
Progress on Solid Target Studies J. R. J. Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX 2 nd Oxford-Princeton High-Power Target.
MERIT analysis - Beam spot size Goran Skoro More details: UKNF Meeting, Oxford, 16 September 2008.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
WIRE: many pulses effects Goran Skoro (University of Sheffield) Target Meeting 6 April 2006.
Electricity What is it and how does it work?. Some definitions to start with An electrical current is caused by the flow of negatively charged electrons.
Longitudinal Space Charge in LCLS S2E Z. Huang, M. Borland, P. Emma, J.H. Wu SLAC and Argonne Berlin S2E Workshop 8/21/2003.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Reducing shock in the Neutrino Factory target Goran Skoro (University of Sheffield) UKNF Meeting 11 January 2006.
Felix Dietrich | AWLC14 | | Stress simulation in the ILC positron target with ANSYS Felix Dietrich (TH-Wildau), Sabine Riemann, Friedrich Staufenbiel.
Transverse beam size measurement High energy micron electron beam non-invasive diagnostics based on diffraction radiation G.Naumenko*, A.Potylitsyn, L.Sukhikh.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Felix Dietrich | LCWS 2014 | | Target stress Analysis at DESY Felix Dietrich (TH-Wildau), James Howarth, Sabine Riemann (DESY), Friedrich Staufenbiel.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Beam Delivery System collimators J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Electricity on the Move. Current Electricity Unlike static electricity, which does not move except when discharged, current electricity is a continuous.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
NEAR DETECTOR SPECTRA AND FAR NEAR RATIOS Amit Bashyal August 4, 2015 University of Texas at Arlington 1.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Ultrasound.
Electric Circuits Exploration Go to the interactive. You will use only need to use the battery, lamp (bulb), and wire. Complete.
Junji Urakawa (KEK) for ATF International Collaboration
New AD Production Beam in the PSB
Strip-line Kicker R&D at KEK-ATF
Parameters of the NF Target
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Electron Source Configuration
Basic Principles for Design of Ignition Systems
Modified Beam Parameter Range
Imperial laser system and analysis
MEIC Polarized Electron Source
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Tungsten wire & VISAR Goran Skoro 24 October 2008

VISAR wire tests – Standard approach VISAR signal? (for 0.5 mm diameter, 3 cm long wire and peak current of 6 kA) Wire Laser beam Room temperature or high temperature (let’s say 1500K)? Can we see a signal with 10m delay- leg (we already have it) or we need a longer delay-leg (let’s say 30m)? Radial or longitudinal oscillations? We can measure radial or/and longitudinal displacement of the wire Issues: Results of calculations -> following pages 02

VISAR wire tests – Standard approach ResultsRadial displacements VISAR signal: (for room and high temperature; for 10m and 30m delay-leg) - flatline Conclusion: We won’t see anything here 03

VISAR wire tests – Standard approach Longitudinal displacementsVISAR signal: - very nice (decent) for 30m delay-leg at high (room) temperature; Conclusion: We have to focus on longitudinal oscillations - decent (low) for 10m delay-leg at high (room) temperature; Results 04

VISAR wire tests – Standard approach Sensitivity of VISAR signal on material parameters values High temperatureRoom temperature If we have a nice signal, VISAR is sensitive to material parameters values. Here shown changes of VISAR signal for +-10% changes of material parameters (E, CTE). Change of E is responsible for time-shift of the signal. 05

VISAR wire tests – Standard approach Very thin wire (0.1 mm diameter) and (only) 1 kA current Beautiful VISAR signal at room temperature with 10m delay-leg Another possibility BUT… 06

VISAR signal intensity has been tested as a function of the wire diameter Laser beam has been pointing at the end of wire (end of wire has been polished) Nice signal has been observed for 0.5 mm diameter wire Very low signal has been observed for 0.3 mm diameter wire Problem: Laser beam spot size is too big (=> 0.5mm diameter) Consequence: We can hardly see a thing for wire diameters smaller than 0.4 mm So, the only chance to do the test with existing (10m) delay leg is to pulse a wire until it reaches high temperature* and then try to measure the VISAR signal A few words about VISAR’s laser beam spot size… *The difference in a wire surface displacements at room and high temperature (see upper plots in Slides 3 and 4) is a result of very low tungsten resistivity at room temperature (10x lower than at 1500 K). VISAR wire tests – Standard approach 07

VISAR wire tests – Alternative approach While waiting for ‘refurbishment’ of our power supply, there is Roger’s idea to shock a wire by discharging the number (n~20) of capacitors. Parameters: Voltage applied to capacitor ~ 50 kV; peak current ~ 950 A Very short pulse (20 ns rise time, 30 ns fall time) ‘n’ circuits in parallel (n=20) Estimated temperature rise in the 0.2 mm diameter tungsten wire (at room temperature) ~ 130 K (similar to the NuFact target case) Results of calculations of wire stress, surface displacements and corresponding VISAR signal as a function of wire diameter are shown in following pages. 08

First 2  s ‘20 capacitors’ case mm diameter wire end of wire VISAR wire tests – Alternative approach Decent signal for 10m delay-leg; radial movement that affects longitudinal one -> clearly seen at the beginning (see inset plot); shame that our laser-beam spot size is so big so the amount of reflected light is so small… 09

end of wire First 2  s VISAR wire tests – Alternative approach ‘20 capacitors’ case mm diameter wire As expected, situation is much worse than for 0.2 mm diameter; temperature rise is only ~ 35 K; Lorenz force induced pressure wave starts to dominate… 10

end of wire First 2  s VISAR wire tests – Alternative approach ‘20 capacitors’ case mm diameter wire Practically no signal for 20 capacitors but may look promising if we add more circuits (see slide 13) 11

end of wire VISAR wire tests – Alternative approach ‘20 capacitors’ case mm diameter wire We could see a signal here without any problems if there is any. Unfortunately, we have a flatline – the wire is ‘dead’ (from the VISAR’s point of view). More (but reasonable number of) circuits in parallel won’t change the results. 12

end of wire First 2  s VISAR wire tests – Alternative approach ‘40 capacitors’ case mm diameter wire ‘Doubling the number of capacitors will give us a beautiful signal for 0.4 mm diameter wire during the first 2 micro-s. And we could see it (even with the laser-beam spot size we have at the moment). But this ‘huge number of circuits’ scenario has its disadvantages… 13

Update I 12 November

VISAR wire tests – Standard approach Previous calculations: - wire length = 3 cm Conclusion: No difference (as expected) - we plan to use a longer wire (~ 5 cm) in tests with our ‘old’ power supply VISAR signal as a function of wire length 15

‘20 capacitors’ case mm diameter wire First 2  s end of wire VISAR wire tests – Alternative approach VISAR signal has been calculated for shorter delay-legs (1m, 3m). It seems that 10m delay-leg is optimal if want to measure the wire oscillations on short time scale… 16

‘20 capacitors’ case mm diameter wire VISAR wire tests – Alternative approach VISAR signal has been calculated for shorter delay-legs (1m, 3m). It seems that 10m delay-leg is optimal if want to measure the wire oscillations on short time scale… end of wire First 2  s 17

Update II 07 December

Laser beam spot size is not an issue anymore End of wires have been properly polished Huge signals for 0.5 mm and 0.3 mm diameter wires Decent signal for 0.1 mm diameter wire All options are possible (except 0.1 mm -> too thin, bending is a problem) Forget the conclusions given in Slide 7 Now we can look what is the best choice of wire diameter to start tests with… A few words about VISAR’s laser beam spot size… AGAIN VISAR wire tests – Standard approach 19

VISAR wire tests – Standard approach 0.5 mm wire, 8 kAVISAR signal: - a small improvement comparing to 6 kA case (Slide 4) at room temperature for 10 m delay-leg Conclusion: Maybe we should start tests with 0.3 mm diameter wire because… Results 20

VISAR wire tests – Standard approach 0.3 mm wire, 8 kAVISAR signal: - very nice signal at room temperature for 10 m delay-leg We should have nice signal even for lower current… Results K case not shown -> stress too high (here ~ 450 MPa)

VISAR wire tests – Standard approach 0.3 mm wire, 6 kAVISAR signal: Results 22 - very nice signal at room temperature for 10 m delay-leg K case not shown -> stress too high (here ~ 250 MPa)

Something completely different 23 ATF 1.28 GeV electrons 0.7x10 ^10 electrons per bunch 20 bunches per train 0.15 – 1.4 s between trains 10ps pulse length 1.44 J per bunch 70 microns x 7 microns spot size George Ellwood’s calculations 4mm thick Ti-6Al-4V ATF at KEK has the same configuration as the ILC injector, i.e. ATF is composed from electron-gun, 1.5 GeV electron linac, 1.5 GeV damping ring(circular accelerator), and beam extraction diagnostic line. The design work was started in The beam operation began in Maybe, interesting for us for testing the tungsten foils First results based on George Ellwood’s AUTODYN simulations shown here At least 3x higher velocity is needed to have decent VISAR signal George is rechecking the parameters used in initial calculation of surface velocity