VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association.

Slides:



Advertisements
Similar presentations
Module 7 STATION AREA PLANNING. Module 7 Station Area Planning Introduction This is one of seven Transit Oriented Development training modules developed.
Advertisements

Linden Hills Small Area Plan WorkshopWorkshop April 24 & 25, 2013.
Transportation Oriented Development in the New York Metropolitan Region Robert N. Lane, Director Regional Design Program Regional Plan Association
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Urban Design Audit Downtown Torrington, CT. P = Peripheral Connectivity Connectivity to Surrounding Districts: Logical and efficient traffic flow, linkages.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Equitable Transit Oriented Development the Denver perspective.
Twinbrook Sector Plan A New Community in the Technology Corridor
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
San Mateo Rail Corridor Transit Oriented Development Plan ABAG/MTC/ULI Workshop September 29, 2006.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Suggested Changes to Centers and Corridors Design Standards and Guidelines Amber Waldref August 11, 2014.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
A POLICY PLAN FOR NORTH MICHIGAN AVENUE AND THE SURROUNDING DISTRICT 2013 IDA ACHIEVEMENT AWARD SUBMISSION: PLANNING CATEGORY.
Jamesburg VPS Generating a Shared Vision for the Future JAMESBURG, NJ Public Meeting Visual Preference Survey.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
How Can Connecticut Take Advantage of Transit-Oriented Development? Robert N. Lane, Director Regional Design Program Regional Plan Association
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
2040 Long Range Transportation Plan for River to Sea TPO September 26, 2014.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Land Use Benefit/Cost Transit Slides. Development – Sprawl – Traffic – Roads An Important Local Issue In America  “What do you think is the most important.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Land Use Study for the Community of Winchester May 21, 2012.
Official Plan Review - Phase II CITIZEN REFERENCE PANEL.
New Urbanism Theory and Practice
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Mueller Redevelopment
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
Jefferson Area Eastern Planning Initiative Project Overview.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
HUMPHREY STREET OVERLAY DISTRICT 2015 Proposed Zoning Bylaw Amendment Public Information Session.
Public Meeting: Tuesday, February 25,  Relationship to Comprehensive Plan  Existing Conditions  Transportation Overview  Market Overview  Concept.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
Things to consider for regional planning…. Corridor Preservation Corridor preservation is a strategy to assure that the network of highways, roads, and.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
1. 2 Which attributes make a community successful?
Railroad Ave eBART Station Area Specific Plan TOD MarketPlace, September 29, 2006 C I T Y O F P I T T S B U R G.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Complete Streets Training
Garrett Bolella, Tim Chan, Greg Khirallah, Dave Miele, Becca Ruitto.
Urban Land Use Chapter Major Land Uses 1. Residential (40%) 2. Transportation (33%) 3. Commercial (5%) 4. Industrial (6%) 5. Institutional and Public.
BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
The City of Edgewood, Florida Economic & Market Analysis.
Complete Streets Training Module 4a – Understanding Context.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
Ayers/Saint/Gross Architects and Planners DAVIDSON CONCORD FRAMEWORK PLAN CONCEPTS.
City of Stoughton Comprehensive Plan Update
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017.
Developing a Pedestrian -Bicycle Safety Action Plan
Presentation transcript:

VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association

Project Goals and Objectives To create a community-based vision for a future transit-oriented place near Bergen Avenue and the Kingsland Line. Policy Objectives Leverage investment in a new station to advance the goals and objectives of Kearny’s plans: Schuyler Avenue Redevelopment, Vision Plan Promote the economic well being of Kearny Design Objectives Create a pedestrian environment around a future station area. Create Connections from a future Station Area to surrounding destinations, and especially along Bergen Avenue to Kearny Avenue Promote and anticipate development patterns that are transit- oriented. Kearny TOD Study

Who We Are Regional Plan Association Robert Lane, Paolo Ikezoe community visioning, urban design Phillips Preiss Shapiro Assoc. Paul Grygiel land use regulation, economic development Eng Wong Taub Susan O’Donnell traffic, mobility, pedestrian issues Kearny TOD Study

Tonight’s Meeting 1. Launch this process with the Working Group 2. “Where We Are”: A Planning Framework for a Kearny TOD 3. “What Could Be”: What is TOD? Preliminary Market Reconnaissance Preliminary Traffic / Pedestrian Reconnaissance 4. Discussion: Did we get it right Where do we want to go? 5. Next Steps Kearny TOD Study

Regional Context Proximity to NY CBD Access to intercity rail Access to interstate highways Balance access with identity Kearny TOD Study

Sub-Regional Context Proximity to Meadowlands Green infrastructure: rivers, wetlands Proximity to Newark Redevelopment in the larger study area Kearny TOD Study

Where We Are: Study Area Context Kearny TOD Study

Where We Are: Study Area Context Clear residential edge Schuyler Ave and industrial area: marginal business and buildings Kearny TOD Study

Where We Are: Study Area Context Pedestrian issues: traffic, topography Kearny TOD Study

Where We Are: Study Area Context Bergen Avenue Corridor Kearny Avenue “Main St. Corridor Kearny TOD Study

Where We Are: Planning Framework Kearny TOD Study Bergen Avenue Kearny Avenue Schuyler Avenue

Where We Are: Planning Framework Kearny TOD Study Bergen Avenue Kearny Avenue Schuyler Avenue

Where We Are: Planning Framework Kearny TOD Study Bergen Avenue Kearny Avenue Schuyler Avenue

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Connects the surrounding area to the transit facility by creating an environment that accommodates the automobile but favors alternative forms of mobility, pedestrians, bicyclists buses. Makes the Station area a community destination: identity, activities Orients buildings towards streets and public spaces and solves the parking problem creatively. Encourages building architecture that is scaled to pedestrian activity. Favors uses that support compact, mixed-use environments a opposed to auto-dependent uses. Kearny TOD Study

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Connects the surrounding area to the transit facility by creating an environment that accommodates the automobile but favors alternative forms of mobility, pedestrians, bicyclists buses. Kearny TOD Study

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Makes the Station area a community destination: identity, activities Kearny TOD Study

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Orients buildings towards streets and public spaces and solves the parking problem creatively. Kearny TOD Study

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Encourages building architecture that is scaled to pedestrian activity. Kearny TOD Study

What Could Be: What Is TOD? A mix of housing, shops, restaurants, offices, civics buildings and open space in a compact, pedestrian-friendly environment within walking distance of a train station, and that supports both community character and transit ridership. Favors uses that support compact, mixed-use environments as opposed to auto-dependent uses. Kearny TOD Study

Residential: Single-family 5 du/acre$100,000$(-1,800)/du Two-family7100,000 (-5,700) Townhouse12300, Stacked townhouse22700,0001,700 Apartments (2-3 story)30800,0003,100 Apartments (4+ story)40600, Age-restricted40600, Assisted living24200, Net TODNet ValueTypical Net UseDensity(per acre)Fiscal Impact TOD housing is “ratable” What Could Be: What Is TOD? Kearny TOD Study

Where We Are: What’s the Market What uses are viable from a market perspective? Minimal new residential in Kearny But substantial competition (e.g., Harrison and Secaucus) Limited market for retail and office Possibly limited industry/artisans further from station Kearny TOD Study

What Could Be: What’s the Market Fiscal implications for redevelopment TOD generally positive Fewer schoolchildren than typical residential Higher value housing Non-residential ratables Limited new services required Kearny TOD Study

Where We Are: Traffic and Mobility Traffic Challenges Bergen and Schuyler Avenue intersection - over capacity –Heavy turning volumes –Trucks –Tough turning radius (especially for trucks) –Limited capacity on Schuyler Avenue Bergen Avenue and Newark Turnpike – over capacity –Trucks –Volume Kearny TOD Study

What Could Be: Traffic and Mobility Kearny TOD Study Traffic Opportunities Operational improvements proposed as part of the Meadowlands District Plan Design improvements could be considered for Bergen and Schuyler Avenues Within the site roads can be designed to meet anticipated capacity

Where We Are: Traffic and Mobility Kearny TOD Study Pedestrian and Bicycle Challenges Narrow or non-existent sidewalks No designated bicycle lanes Topography on Bergen Avenue heading toward Kearny Avenue

What Could Be: Traffic and Mobility Kearny TOD Study Pedestrian and Bicycle Opportunities People are walking and bicycling now Bergen Avenue is wide so sidewalks could be widened and/or added An off-road bike path is proposed as part of the Meadowlands District Plan

What Could Be: Traffic and Mobility Kearny TOD Study Next Steps Develop Three alternative land-use and design scenarios. Evaluate the Three Alternatives in terms of market and fiscal implications and in terms of Traffic and mobility implications. Convene a Stakeholder Working Session around the Three Alternatives