Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department.

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Complete Streets: Moving from introduction to local policy
+ Establishing Safe Communities in Madison County, Kentucky Presentation by: Ruth Hawkins, MSN, RN, CHES Lloyd Jordinson, RN Dorathy Lachman, MD Creating.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 3.
Pedestrian and Bicycle Issues Richmond, CA Richmond Bicycle & Pedestrian Advisory Committee (RBPAC) June 2, 2008.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
1 Safety should be the #1 priority Improving Bicycling Safety in New York City LIN, Ming LaGCC
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
Introduction to Complete Streets January What are Complete Streets? Complete Streets are streets for everyone, no matter who they are or how they.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Department of Transportation Street Classification September 20, 2010.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Complete Streets: Building Momentum in Westchester 2012 Southern Westchester Energy Action Consortium.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
What is a Complete Street? A Complete Street is safe, comfortable and convenient for travel via automobile, foot, bicycle, and transit.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Navigating the Path to Complete Streets Strategies for Implementation January 30, 2014 RI League of Cities and Towns Annual Convention This Grow Smart.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Complete Streets for Planners MN APA Conference September 28, 2011 Ethan Fawley, Fresh Energy.
2013 Walking Summit 2013 Walking Summit Completing Our Streets: Tools to Get You Moving Laura Searfoss, Policy Associate, National Complete Streets Coalition.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
National Capital Region Climate Change Report OVERVIEW Joan Rohlfs, Chief, Air Quality Planning Metropolitan Washington Council of Governments October.
What are Complete Streets?What are Complete Streets? 1 Complete Streets are safe, comfortable, and convenient for travel for everyone, regardless of age.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Chicago Department of Transportation Bobby L. Ware, Commissioner Richard M. Daley, Mayor Metropolitan Planning Council November 3,
Introduction to Complete Streets in Wisconsin 1. What are Complete Streets?What are Complete Streets? 2 Complete Streets are safe, comfortable, and convenient.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Mayor Karl Dean, Chairman Integrating Health and Transportation: Policy, Projects, Data Collection and Monetization Rochelle Carpenter National Health.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Complete Streets Training
Lompoc Walkability Assessment September 24, 2009.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Complete Streets Training Module 4b – Designing for All Users.
1 Introduction to Complete Streets March What are Complete Streets? 2 Complete Streets are streets for everyone, no matter who they are or how they.
Ferndale Complete Streets Ordinance
Urban Street Design Standards Overview of Project and Details
Built Environment and Physical Activity – updates
Nashville-Davidson County Strategic Plan For Sidewalks and Bikeways
Complete Streets & The Urban Design Advisory Committee
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
City of Wilmington Bike Plan Update
State Aid Standards Development
MPO Board Presentation
DDOT Western Avenue, NW Project
Presentation transcript:

Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department of Public Works Mark Macy, P.E. Engineering Director, Division of Engineering

Executive Order No Complete Streets Policy “For decades Nashville roads were built with only cars in mind,” Dean said. “We have come a long way in recent years in terms of adding sidewalks and bikeways, and making mass transit more convenient for people to use.” -Mayor Karl F. Dean Signed October 6, 2010 by Mayor Karl F. Dean

Executive Order No. 40 – Complete Streets Policy Executive Order No. 40: “Give full consideration to the accommodation of the transportation needs of all users, regardless of age or ability, including those traveling by private vehicle, mass transit, foot, and bicycle.” Mayor Dean was joined at the Executive Order signing by District 7 Councilmember Erik Cole, who serves as the Metro Council representative on the Mayor’s Bicycle and Pedestrian Advisory Committee, which recommended establishing a formal Complete Streets policy. The policy was also recommended by the Nashville Livability Project, led by Vice Mayor Diane Neighbors, the Healthy Nashville Leadership Council and the Mayor’s Green Ribbon Committee on Environmental Sustainability.

Supporting Policies Chapter of the Strategic Plan for Sidewalks and Bikeways (2008 Update) adopts Complete Streets principals as one of the design theories to be used on future public projects. Located at: MS/stratplan/. MS/stratplan/

Supporting Policies Chapters 1.1 and 3.5 of the Public Works Subdivision Street Design Standards and Specifications adopted Complete Streets principles June 3, Located at divisions/SubdivisionSpecs.pdf divisions/SubdivisionSpecs.pdf

Complete Streets Of all trips taken in metro areas: 50% are three miles or less 28% are one mile or less 65% of trips under one mile are taken by automobile 2001 NHTS In Nashville: 33% of greenhouse gas emissions come from transportation

By providing alternatives to the automobile, Complete Streets are a traffic and congestion reducing tool, and part of a strategy toward improving air quality. Complete Streets By providing opportunities for increased outdoor and physical activity, Complete Streets provide social and public health benefits.

Complete Streets Bikeways Sidewalks Crosswalks Medians Bus pullouts Pedestrian signals Street parking Complete Streets features include:

Complete Streets Provide flexibility in project planning and design. Is not a one size fits all approach. Designs vary based on context, topography, road function, traffic speed, pedestrian and bicycle demand, and other factors.

Examples Incomplete Streets

Incomplete Streets Streets with no sidewalks or bike lanes

Incomplete Streets Uninviting for bus riders

Incomplete Streets Too narrow for parking Ashwood Ave – 24’ FC-FC

Incomplete Streets Buildings crowding the right-of-way West End at 21 st Ave

Examples Complete Streets

Complete Streets Bike lanes, parking, sidewalks Belmont Blvd near Ashwood Ave – 80’ R.O.W.

Complete Streets Bike lanes, sidewalks, parking pullouts, planting strips Demonbreun St – 120’ R.O.W.

Complete Streets Bike lanes, sidewalks, Median Shelby Ave near S. 11 th – 80’ R.O.W.

Complete Streets Bike lanes, sidewalks, median with pedestrian crossings, parking pull-outs, planting strips, street trees and furniture Korean Veterans' Boulevard – 140’ R.O.W.

Complete Streets Sidewalks, median with pedestrian crossings, parking pull-outs, LED - Pedestrian streetlights, Pedestrian way-finding kiosks Tennessee’s First Green Street, Deaderick Street

Complete Streets Bike lanes, Sidewalks, Transit Service DB Todd Boulevard

Complete Streets: Coming Soon Wide Sidewalks, Separate Bike Paths, New Transit Service, Street Trees and Landscaping 28 th /31 st Avenue Connector

For More Information: Links to success stories & existing policies How-to Tools Resources: power-point, brochures Newsletter sign up Deaderick Street, Nashville