Pedestrian OC Does Not Cross Amador St 1 Safety Issues Riverside Elementary School Amador St.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Grade Separation Alternative
West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Seattle Design Commission Update.
Road Diets and Roundabouts
Forest Lake EDA Meeting June 27, CR 2 and I-35 Bridge/Interchange First Ave NW (Backage Road) CR 2/Broadway Avenue Roadway Utilities Hardwood Creek.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
38 th Street to Kessler Boulevard Traffic Engineering Review Summary For Historic Midtown Initiative (HARMONI) By HNTB Corporation June, 2010.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
NORTHFIELD COMMUNITY SCHOOL Elementary School Entrance Cedarbridge Road Side NORTHFIELD POLICE NJ 1.
Equitas Academy Charter School Conditional Use Permit Review.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
November 18, 2008 BCC Called Public Hearing on BZA #SE , 9/4/08 APPLICANT: Avalon School.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Vision Investment Proposal. Meeting Vision Renewal Goals QUALITY OF LIFE CONNECTIVITY HEALTH.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
LE DROIT PARK TRANSPORTATION PACKAGE. BACKGROUND Neighbors across LeDroit have been dealing with many transportation related issues over the years with.
RIVERSIDE ELEMENTARY SCHOOL CalTrans Overpass MARCH 12, SALLY SWANSON ARCHITECTS, INC. West Contra Costa Unified School District.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
South Bellevue Operational Noise Mitigation Types of barriersTypes of barriers Heights and locations Heights and locations City of Bellevue Light Rail.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
IMPACT OF ADDITIONAL RESIDENTIAL DENSITY ON Redevelopment of North Toronto Collegiate Institute February 19, 2004 Architects Crang and Boake Inc. Teeple.
Designing for Pedestrian Safety – Road Diets 9-1 ROAD DIETS.
10 -1 ROAD DIETS Before After Designing for Pedestrian Safety – Road Diets.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
VISITOR SAFETY AT THE LAWRENCE BERKELEY NATIONAL LABORATORY.
Leona Heights Sulfur Mine & Creek Cleanup
Communities of Excellence in Nutrition, Physical Activity, and Obesity Prevention (CX 3 ) Store Environment – Safety and Walkability CX 3 CX3 Tier 2 Training.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Maintenance and Temporary Traffic Control
Public Works Capital Projects FY Projects Completed FY 2014.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Bicycle Safety Countermeasures Module 4.
California Coastal Commission November 4, 2015 Cal Coast Academy Appeal No. A-6-NOC Agenda Item Number: 26a.
Pioneer Road Relocation and Reconstruction Project
City of Charlottesville
Peckham & Nunhead Community Council: Important Issues For Pedestrians
Pilot Project Evaluation
Bill Good Chief Operations Officer
Thornbury Road new green-man cycle and pedestrian crossing
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
SE 12th Street Roadway Improvements February 8, 2005.
Marin-Curtis Safe Routes to School
Bicycle and Pedestrian Update to City Council
State Aid Standards Development
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Natural Science Building East Ramp Bottom: Existing Sign
Colorado Avenue University of Colorado, boulder
Better Streets Intersection Survey
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Pedestrian OC Does Not Cross Amador St 1 Safety Issues Riverside Elementary School Amador St

283 Ped crossings (7 AM – 4 PM: Feb. 28, 2013 ) AM Peak (8 AM – 9 AM): 83 PM Peak (2:30 PM – 3:30 PM): 98 Amador Street: (Emergency Response Route) 85 th Percentile: 35 mph 38 mph in 2013 Max Speed: 45 mph >45 mph in 2013 AM Peak Hour: 792 cars/hour PM Peak Hour: 884 cars/hour Daily Volume: 7,900 cars per day 2 Traffic Counts at Riverside Ave. Pedestrian Overcrossing

Replace Riverside Ave POC Spans Over Amador St Remove Existing POC Riverside Ave Humboldt Ave Riverside Elementary School 3 Pedestrian Overcrossing Safer Access To/From School Amador St To San Francisco To Sacramento

Bridge Aesthetics Riverside Avenue Pedestrian Overcrossing (POC) Blue-Colored Fence Ramp Aesthetics (School Side of I-80) 4 Colored Tiles Fractured Rib Pedestrian Ramps Fencing Sample Tiles

Riverside Ave Pedestrian Overcrossing POC Spans Over Amador St Riverside Ave Riverside Elementary School 5 Safer Access To/From School Amador St Reconfigured Parking Lot

Riverside Ave Pedestrian Overcrossing 6 Footprint Area in School Property: 3,100 SqFt Designed to minimize impacts to School Will be equipped with security cameras, lights, and fencing San Pablo Police will monitor cameras San Pablo will do routine maintenance (trash, graffiti, fence, bulbs) Height is 32’ from bottom of top dick to street level Height at school side touchdown is 23’8” from ground level to top deck; chain link fencing 6 to 8’ higher Pedestrians will access from public sidewalk, not School property Supported by WCCUSD board in October 2008

7 Riverside Ave POC – East Side

8 Riverside Ave POC – West Side

9 Riverside Ave POC – Design Alternatives

10

11