DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Before : Inadequate gateway point along Highway 100 No Sense.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Contact: Beth Morris
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
Midtown Alliance Capital Improvements Program
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
November 14, 2014 District Construction Season.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
From Island Estates Parkway to St. Johns County Line.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
November 20, 2013 District Construction Season.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
1 I-75 Reconstruction Welcome! Those wishing to make an official comment concerning any of the projects presented this evening.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Community Development Department Construction Phase.
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
District Five Upcoming Projects. Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Arizona Forward Update
Scranton/Carter Road Reconstruction
We Apologize for the Road Construction!
Chapin Town Hall Meeting
District 3 Complete Streets Projects
Pedestrian & Bicyclist Crash Analysis
DISTRICT 1 ADVERTISED PROJECTS
Transportation Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
Construction Management & Engineering
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
District Five Upcoming Projects
Monterey County Project Report for Measure X Expenditures
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
ARCHIE BRIGGS Traffic Calming
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER

DORCHESTER NoContract No. DescriptionType of WorkAd DateBid Date 1DO US 50 EBR - From Linkwood Drive to West of Old Ocean Gateway Resurface 5/19/156/25/15 WICOMICO NoContract No.DescriptionType of WorkAd DateBid Date 1WI MD 349-Small Structure 22078X0 over Dennis Creek Bridge 12/9/141/15/15 2WI US 50 WBR - White Richardson Road to Walston Switch Road Resurface 11/24/20151/7/16 WORCESTER NoContract No.DescriptionType of WorkAd DateBid Date 1WO US North of Massey Branch to Five Mile Branch Road 4 Lane Divided Highway 5/27/1411/13/14 AREAWIDE NoContract No.DescriptionType of WorkAd DateBid Date 1XY At Various Locations in Wicomico County Resurfacing 11/18/1412/11/14 2XX ADA At Various Locations in District 1Sidewalks 12/16/141/22/15 DISTRICT 1 UPCOMMING PROJECTS

DORCHESTER COUNTY - MD 16 AT WOODS ROAD Project Description: Construct single lane roundabout. Upgrades will also include bicycle compatibility, drainage, landscaping, and intersection lighting. EXISTING PROPOSED

SOMERSET COUNTY- MD 413 AT TULLS CORNER RD. EXISTING PROPOSED Project Description: Construct deceleration and acceleration lanes in both directions at Tulls Corner Rd.

US 13 - AT JONES RD (SOMERSET) AND NORTH OF OLD EDEN RD (WICOMICO) Construct new crossover with deceleration/acceleration lane approximately 800 feet north of Old Eden Allen Rd Construct median acceleration lane onto US 13 northbound at Jones Rd.

WICOMICO COUNTY - US 50 BUSINESS FROM WARD ST. TO EAST MAIN ST. Proposed pedestrian improvements at Truitt St. Intersection improvements at Davis St. Bike lanes will be installed on east bound and west bound roadways by making use of existing outside through lanes Pedestrian improvements at Ward Street Project Description: Construct east bound and west bound bike lanes utilizing outside through lanes, pedestrian improvements at Truitt St., intersection improvements at Ward St. and Davis St., and install median fencing to prevent mid block crossings by students / pedestrians.

SOMERSET COUNTY - MD 413 BIKEPATH EXISTING PROPOSEDNEW BIKE PATH Project Description: Construct bicycle path in place of the abandoned railroad along MD 413 from approximate MP 1.55 to approximate MP Project is in conjunction with the installation of Delmarva Power’s new High Voltage Transmission line.

Questions ???