The Role of Workload for Work Organisation in a Remote Tower Control Center Institute for Flight Guidance, German Aerospace Center (DLR) C. Möhlenbrink,

Slides:



Advertisements
Similar presentations
TEM as an Analytical Tool
Advertisements

1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 Results - Experience of Participating Air Traffic Controller By T. Symmans EUROCONTROL.
7 tasks identified Flight Arrival Interaction Detection Resolution Planning Resolution Implementation Monitoring Other Trajectory Changes Co-ordination.
Total Airport Management CARE Innovative Study
1 4th FAA - EUROCONTROL AP6 Technical Interchange Meeting (TIM -4) Ground-based Decision Support for Conflict Detection and Resolution.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Work load and responsibilit y npor. Ing. Miroslava Šimonová.
Airside Capacity Enhancement
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Modeling Conflicts of Multiple Independent Alerting Systems Lixia Song James K. Kuchar Massachusetts Institute of Technology.
Assessment of a Gaze-aided User Interface to Assist in the Visually-intensive Workloads of Air Traffic Controllers Joshua Wade and Yiming Wang.
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Author: MARA ĆUJIĆ An Analysis of the Task List impact upon RAMS Workload Calculations November, 2004.
International Journal of Industrial Ergonomics 35 (2005) 939–953 Situation awareness and workload in driving while using adaptive cruise control and a.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
HCI in Safety-Critical Applications: ATC Systems Aslan Neishaboori.
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
Workshop on preparations for ANConf/12 − ASBU methodology
HTA as a framework for task analysis Presenter: Hilary Ince, University of Idaho.
Special Topics Introduction to Aeronautical Engineering
„ Fuzzy Expert” System for Determination of Runways in Use Case Study: Zurich Airport Fedja Netjasov University of Belgrade Faculty of Traffic and Transport.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Brussels December 5,20021 New Technologies and Airport Management Presented by Cesare Bernabei Università di Piacenza & Politecnico di Milano January.
MINISTRY OF EDUCATION AND SCIENCE OF UKRAINE NATIONAL AVIATION UNINVERSITY INSTITUTE OF AIR NAVIGATION AIR NAVIGATION SYSTEMS DEPARTMENT MASTER’S DEGREE.
1 Automation Adoption and Adaptation in the Air Traffic Control, URET Case Study Tatjana Bolic.
Safety Investigation into the accident to the Airbus A330, Air France flight 447, June 1, 2009 Human Factors Issues Sébastien DAVID, Senior Safety Investigator.
Survey of Traffic and Radar Controller Communication and Workload
Lecture 3: Air Traffic Control Tower
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
EVOLVING INNOVATION PERSPECTIVES ON HIGHER EDUCATION AND ITS ROLE TO COMPETITIVENESS Eva Jelínková, Michaela Krechovská, Petra Taušl Procházková Liberec.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Application control chart concepts of designing a pre-alarm system Sheue-Ling Hwang, Jhih-Tsong Lin, Guo-Feng Liang, Yi-Jan Yau, Tzu-Chung Yenn, Chong-Cheng.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
© 2002 GMU SYST 495 AATMS Team Autonomous Air Traffic Management System (AATMS): The Management and Design of an Affordable Ground-Based Air Traffic Management.
Enhanced Flight Following. Major Concepts  “Second Opinion”  Positive Flight Following  Resource for Captain.
Terminal Airspace Traffic Complexity Fedja Netjasov University of Belgrade Faculty of Traffic and Transport Engineering Division of Airports and Air Traffic.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Impact of Operating Context on the Use of Structure in Air Traffic.
Mr. Lagomarsino Money Power with Technology Applications.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
고려대학교 산업경영공학과 IMEN 315 인간공학 1. INTRODUCTION. 고려대학교 산업경영공학과 IMEN 315 인간공학.
EUROCONTROL EXPERIMENTAL CENTRE1 / 29/06/2016  Raphaël CHRISTIEN  Network Capacity & Demand Management  5 th USA/Europe ATM 2003 R&D seminar  23 rd.
Information Support for Air Traffic Management in the SuperSector: Color-Saturation Coding of Aircraft Altitude & Effects on Air Traffic Controller Performance.
Second ATM R&D projects Co-ordination and networking meeting 14 Nov 2007 Advanced Remote Tower - ART A concept study of Enhanced functionalities during.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
HMSE Implementation, Operation, and Evaluation. 2 Management Planning Scheduling Work Assignment Monitoring Assessment Needs, Problems, Opportunities.
Aerodrome Operations under Limited Visibility Conditions
Automation and Air Traffic Control
Workshop on preparations for ANConf/12 − ASBU methodology
The Relationship Between Traffic Stability and Capacity for Decentralized Airspace 7th International Conference for Research in Air Transportation June.
RACOON Operations Antonio Nuzzo – RACOON Operational Leader
Unit-3 FLIGHT INFORMATION SYSTEMS
Aeronautical Facilities
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
Workshop on preparations for ANConf/12 − ASBU methodology
Test of a risk judgments model in Air Traffic Control
Open Day Invitation PJ05 Multiple Remote for three Airports EXE-05
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 3.
1. INTRODUCTION.
Air Traffic Control System
Presentation transcript:

The Role of Workload for Work Organisation in a Remote Tower Control Center Institute for Flight Guidance, German Aerospace Center (DLR) C. Möhlenbrink, A. Papenfuss, J. Jakobi

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 2 The Role of Workload for Work Organisation in a Remote Tower Control Center Overview Background Introduction Hypotheses Method Results Discussion Conclusion

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 3 Background Concept Study Vito (Virtual tower) What`s the potential of automation for tower control? Technologies for „Virtuel Reality“ Novel Videotechnologies Immersive Visualisation Head-mounted displays Telepresence „Wearable computing“

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 4 Background RApTOr ( ) RTO-Experimental System Installed at Braunschweig airport Prove of technical feasibility Experimental system running since Camera / Zoomcamera Resolution requirement: 30cm/500 m Panoramacamera System (4 cameras + PTZ) Gbit/s – fiber optics LAN RTO-Console “Augmented Vision” Videopanorama

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 5 Background RAiCe: Remote Tower Operation Center (start 2008) Research question of interest: How can air traffic control be organized in a control center What is the role of workload for the evaluation of new ATC-concepts Is it possible, one controller operating two small-sized airports? Approach: High fidelity simulations as work probe for a remote tower center Braunschweig Erfurt

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 6 Introduction Workload Concept Def. Workload: [Goper & Donchin 86] Limitation on the capacity of an information processing system. taskload versus workload timeline models strategy shifs Influencing factors in aerodrome control: [Vogt et al. 2006] Aerodrome complexity VFR traffic Calculated take-off times Staffing Technological support

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 7 (1) Working condition:Single Operator Introduction Designing a Remote Tower Center Far-view Braunschweig Far-view Erfurt BWE ERF BWE ERF weather data integrated (far-view) RADAR BWE RADAR ERF flight strips: black: Depart. EDDE yellow: Arrival EDDE black: Depart. EDVE yellow: Arrival BWE Zoomcamera EDVE Zoomcamera EDDE

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 8 Introduction Designing a Remote Tower Center (2) Working Condition:Controller (PL) operating BWE Controller (PL) operating ERF Far-view Erfurt ERF BWE ERF BWE Weather data integrated (far- view) RADAR ERF RADAR BWE Flight stirps ERF: black: Departure ERF yellow: Arrival EDDV + Zoomcamera BWE + Zoomcamera ERF Flight strips BWE: black: Departure BWE yellow: Arrival BWE Far-view Braunschweig

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 9 Introduction Designing a Remote Tower Center (3) Working Condition:Team Variant PL (ERF + BWE) and CO (ERF + BWE) Far-view Erfurt ERF BWE ERF BWE Weather data integrated (far- view) RADAR ERF RADAR BWE Flight stirps ERF: black: Departure ERF yellow: Arrival EDDV + Zoomcamera BWE + Zoomcamera ERF Flight strips BWE: black: Departure BWE yellow: Arrival BWE Far-view Braunschweig

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 10 Introduction Designing a Remote Tower Center

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 11 Augmented Vision Aspects Control and surveillance! Aim: Reducing Head-down times Callsign: - Integration into the far-view - based on transponder data Alternative: - Movement detection - based on a Live-video: Introduction Technological Support VP-CGD D-EAF

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 12 Identification of safety-critical situations Modified Cooper-Harper Scale Expert rater: Hierachical structure of questions: – No major influence – Capacity – „workload“ – impossible

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 13 Hypotheses traffic hypotheses H1a: For ISA workload ratings (2 min interval) it is expected that the workload ratings are higher for the heavy traffic than for low traffic. H1b: Under low traffic, the single operator has significantly higher workload ratings compared to all other working conditions. The same assumption is made for heavy traffic. H1c: From a theoretical point of view it is predicted that the workload of the single controller operating two airports under low traffic load is not significantly higher, than the workload of controllers operating one airport with low traffic.

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 14 Hypotheses augmented vision hypotheses and expert ratings H2 Augmented vision hypotheses For the between-subject-factor it is predicted that working with the callsign displayed on the video, workload is significantly lower compared to working without the callsign in the video. It is assumed that this effect is independent of the working positions or traffic load. Expert Ratings Identifying crucial constraints for the Remote Tower Center Concepts safety critical situation, when one controller is operating two airports

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 15 Method High-fidelity simulation: Remote Tower Center Data recording: process data: * throughput Subjective data: * ISA workload ratings * Shape questionnaires * post-run interviews * final questionnaire Objective data: * eye-data recordings * radio com Heatmap Interact

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 16 Method Sample Sample: 12 controllers Deutsche Flugsicherung (DFS) Age: mean=34.6 [25,60] years valide controller license Movementsn < IFR movements2 < IFR movements6 > IFR movements4

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 17 Method Traffic Scenarios Mixed traffic IFR & VFR total 16 aircraft raising traffic load over time: - 1 st half, low traffic load - 2 nd half, heavy traffic load Events: Two parallel landings Two paralle starts

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 18 Method Identification of critical situations Modified Cooper-Harper Scale S1: Landing on airport A + taxing traffic on airport B S2: Similar call signs for aircraft of airport A and B S3: Simultaneous pilot requests at airport A and B S4: Simultaneous starts at airport A and B S5: Simultaneous landing at airport A and B S6: Conflict on airport A, start/landing on airport B

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 19 Method Instantaneous Self-Assessment Scale „Online“ Workload 5

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 20 Method Experimental Design Exp. Conditions Between subject factor (1): Augmentation (1) no augmentation(2) callsign within subject factor (2): working design variants C1-C3 * working positions (SO, TC/CO, BC/ EC) within-factor (3) C1C2C3C1C2C3 (3) Traffic (1) low SOTC/COBC/ECSOTC/COBC/EC (2) high SOTC/COBC/ECSOTC/COBC/EC

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 21 Results Traffic (low, high) ISA-Workload-Ratings Main effect traffic load: heavy traffic  higher workload low traffic:  lower workload Main effect position: TL, CO, SC  higher workload BC, EC  lower workload Interaction effect traffic*position BC, EC  WL: low ~ heavy traffic TL, CO, SC  low traffic  low WL  heave traffic  high WL

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 22 Results Augmented Vision (yes, no) ISA-Workload-Ratings Main effect augmentation: callsign  lower workload no callsign  higher workload Main effect augmentation*position: TL, CO, SC  callsign effect BC, EC  no callsign effect Additional analysis: Augmentation (between-subject factor ) Correlation (team variable, augm.) r=.87 *

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 23 Results Ratings for critical situations Situations of interest (N=216) No major influence Influence on Efficiency Influence on Safety Impossible to handle ! (S1) land / taxi (S2) callsign 8110 (S3) requests 7800 (S4) start / start (S5) land / land 4677 (S6) conflict /land 3431 (R1) rest category TOTAL

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 24 Discussion Role of Workload for Work Organisation One controller operating two airports * workload raises * task prioritization * two mental traffic pictures? Each controller operating one airport * workload low * task prioritization * mental traffic pictures? * social aspects? Low traffic periods Each controller operating one airport * workload raises * timing conflicts * two mental traffic pictures? * redundancy Single operator One operator for each airport Team (PL,CO)

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 25 Discussion Role of Augmented Vision Effect Previous studies for remote tower  no callsign effect (within-subject design) Operating two airports  callsign effect (training + between subject design) more demanding  callsign effect? problem: high correlation with team variable head-down time issue Seperation of information VP-CGD D-EAF

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 26 Discussion Identification of Critical Situations for the RTC Expert judgment (here: online monitoring of one controller operating two airports) Smooth operations: parallel starts (ok) parallel landings (ok) …but 33 situations influencing safety, due to…? 28 situations safety critical, due to…? Shortcomings: No comparable data for other working conditions Role of redundancy in ATC today

The Role of Workload for Work Organisation in a Remote Tower Control CenterC. Moehlenrbink June 2011 Folie 27 Conclusion Workload concept insufficient for the evaluation of work design variants Workload as an independent variable influencing controller strategies Work methods offered by different staffing concepts Role of safety critical situations Future work Deeper analysis of expert judgements robust traffic concepts for RTC?