Friday Cyo (Thu. 22h) Point 6 – After the energy scan of yesterday afternoon, we have discovered generator B2/MKBH-A (One changed during this TS) has around.

Slides:



Advertisements
Similar presentations
Sustainability is Good for Business MAINTENANCE DEPARTMENT.
Advertisements

1. 2 5kW, 6kW, 8kW, 10kW, 14kW, 16kW model Domestic heat pump - Air to Water.
NA YETS: schedule week by week S. Evrard.
Daikin Altherma™ Troubling Shooting
AC-SSC-1 Installation and operation manual
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
Special Applications Timed shut-off function Intelsteer Power Saver.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams
LT-V: controlling a pressure control valve Presentation of the LT-V Data Logger (March 2014) # 1.
Pool system components - solar collectors - Temperature probes relief pool - Solar pump system - Pump filtration system - Relief valve - air temperature.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
NA YETS: schedule week by week S. Evrard.
For more info:
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
 Adjective: caused by heat or temperature. Noun: A rising air current caused by heating from the underlying surface.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
MP3 List of main Issues during March 2010 MP3 - Team.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
19.2 Domestic electricity Paying for electrical energy  Most of the electrical appliances in your home use mains electricity.  Mains electricity: alternating.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
Reducing Energy Usage DLA Strategic Materials 2016 Hard copies of this document may not be the current version. Refer to the “I Am The Key” to verify the.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
S A Griffiths CM42 June 2015 Electrical & Control.
TE-MSC-SCD EYETS th September, 2017.
Helium spill in LHC tunnel
Energy- and mass flows in cooling and in heat pumps
MPE main activities planned for LS2
352MHz Klystron Control for the 3MeV Linac test stand
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Energy Saving Guide How much in Energy Savings are you missing out on?
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Technical Stop #4 29th August - 2nd September 2011
Energy Saving Guide How much in Energy Savings are you missing out on?
Summary of Week 13 G. Arduini, B. Holzer
Technical Stop #4 29th August - 2nd September 2011
November technical stop activities:
Preliminary analysis of PS septum 31 failure August 8th, 2008
LHC - Week 38 Technical stop: Katy Foraz
Presentation transcript:

Friday Cyo (Thu. 22h) Point 6 – After the energy scan of yesterday afternoon, we have discovered generator B2/MKBH-A (One changed during this TS) has around 2% voltage less strong than others – 10 minutes of access needed to put installations in REMOTE if Energy scan of the night was good. K. Foraz

TS#9 – 2011: in addition to regular activities – Solenoid wrapping at point 8 (the last one, and test of all points. – Modification of the faulty boards for RB circuit voltage measurement – Replacement of the power switches on quench heater power supplies (last sector) – X ray of QRL in sector 45. – Replacement of the compressor at point 4 – Exchange of 4x 400 l/s ion pump at MKB 6R – Control cabling for the pump in sector 45 – Trimming tests in sectors 56, 78 and 81 – Power converter tests in sector 78 (following last week events) – Ventilation tests following the speed reduction (of air) K. Foraz

To be followed Access mode versus Patrols – Would it be better to set the general mode in all machine except points 3 & 7, and patrol the last day (or last 2 days) ? WAT is covering the control of activities Operators won’t give keys during 4 days Access will be easiest (intersite doors, time to get in) But Patrollers should be available Plan for powering tests can be affected Under discussion Non planned lost of patrols due to: – Human errors – Problems with the closing system of some doors.. To be followed K. Foraz

To be followed Water leak RB45:UA47 Courtesy : C. Goncalves Perez W.r.t. water signs on floor, leak is not new, « Nous ne pouvons pas être précis sur l’origine de la fuite. Il s’agit vraisemblablement d’une fuite au niveau d’un bouchon situe sur la cosse. » Intervention during next TS : 4 days K. Foraz