Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ejaz Ghani, Arti Grover Goswami & William R. Kerr Highway to Success: The Impact of Golden Quadrilateral Project for the Location and Performance of Indian.
Methane Losses from Compressors Lessons Learned from Natural Gas STAR Technology Transfer Workshop Northern Natural Gas Company, INGAA, CECO, Heath Consultants,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of Pre-heater.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
School of Occupational & Environmental Hygiene Evaluation of a new mask and scavenging system for nitrous oxide used in labour and delivery Emission Control.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Lecture 6 - Project Planning. Lecture 6: Project Planning Overview Creating an outline plan –Work Breakdown Structure –Identifying tasks Waterfall and.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Fuel Tank Inerting Joint Airbus/FAA, A320 Flight Tests
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Directed Inspection and Maintenance (DI&M) Lessons Learned from Natural Gas STAR Partners Producers Technology Transfer Workshop Devon Energy and EPA’s.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
2010 CEOS Field Reflectance Intercomparisons Lessons Learned K. Thome 1, N. Fox 2 1 NASA/GSFC, 2 National Physical Laboratory.
2007 ASHRAE Annual Meeting Conserving Natural Resource Use in Buildings William Tschudi – Tengfang Xu – Lawrence Berkeley.
Operations Management
Replacing High-Bleed Pneumatic Devices Lessons Learned from Natural Gas STAR Small and Medium Sized Producer Technology Transfer Workshop Bill Barrett.
Folie 1 Quality Management in local biomass district heating plants and grids Optimising operations based on monitoring activities biomass energy for heating.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
Chapter 6 Control Using Wireless Throttling Valves.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
Shrinkage Forecasts - Factors David Simpson September 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Renewable Energy Research Laboratory University of Massachusetts Prediction Uncertainties in Measure- Correlate-Predict Analyses Anthony L. Rogers, Ph.D.
EQT373 STATISTIC FOR ENGINEERS Design of Experiment (DOE) Noorulnajwa Diyana Yaacob School of Bioprocess Engineering Universiti Malaysia Perlis 30 April.
Strengthening existing information systems to provide improved analysis to support the design of cash transfer programmes John Seaman Evidence for Development.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PPA 502 – Program Evaluation Lecture 2c – Process Evaluation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 WRAP Oil & Gas Phase II Work Plan: 2002 and 2018 Area Source Inventory Improvements and Area Source Controls Evaluation WRAP Stationary Sources Forum.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Horndon SMER – Proposed Methodology July Overview Background Identification of the Error Correction of the Error Data Processing Rules.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EPA Natural Gas Star Natural Gas Distribution Merrillville, IN June 3, 2003.
Replacing High-Bleed Pneumatic Devices Lessons Learned from Natural Gas STAR Partners NiSource and EPA’s Natural Gas STAR Program June 3, 2003.
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
NEDC/WLTP correlation process Meeting of TCMV on 17 November 2015
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Market Research Techniques Sustainable Small Acreage Farming and Ranching Cinda Williams, UI Extension 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Compressed Air System Optimization Rebate
1 A latent information function to extend domain attributes to improve the accuracy of small-data-set forecasting Reporter : Zhao-Wei Luo Che-Jung Chang,Der-Chiang.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Improving Oil & Gas Emissions Tool Inputs Using Industry Surveys and Permit Data Mark Gibbs Environmental Programs Manager Emissions Inventory Section.
Solar Power Applications
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Fan-Filter Testing - The Results Are In
Leakage Model Modification Update
Leakage Model Modification Update
Fugitives Wellhead Compression Gathering
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Venting Controllers/Positioners – understanding natural gas emission rates

2 Background  Emissions of natural gas from gas networks originate from a number of sources including:  Infrastructure failure  Operational/process venting  Fugitive leakage from pipeline infrastructure  Fugitive leakage can be a significant, continuous emission  Valves, flanges, connectors, pressure relief devices, PIG trap doors and filters have been identified as major fugitive emission sources.  Venting from some process control equipment can also be significant and continuous  A new project has been initiated to evaluate the emission from valve controllers and positioners

3 Venting Controller Project - Outline  National Grid initiated an R&D project to:  Identify and quantify the gas venting from selected controllers and positioners  Develop a robust test methodology  Identify the controller types and suitable sites for test work  Perform lab tests on selected controllers and positioners to understand the impact of supply pressure on vent rate  Study the venting at a number of sites to get a representative range of controller types and operation  Measure the vent emission rates using a high flow sampling technique, for short term measurements – time averaged data  Study how the vent rate varies as a function of controller operation (by studying the vent rate as a function of time over a 24hr period)  Install suitable flow meters on selected vents – to establish time-dependence of vent rate  Compare the vent rate profiles with site operational parameters to determine if there is any correlation  Undertake two or three measurement campaigns at different times of the year to check whether system operation factors influence the emission rate

4 Venting Controller Project - Targets  The key target outputs from this project include:  Quantify the vent emission rate from selected controllers and positioners  Study how the vent rate varies as a function of site operation (looking at time and seasonal dependence)  Determine if there is a link between the emission rate and site operation (or not)  Couple site infrastructure information with measured emissions to estimate overall emission inventory  Identify controllers and positioners that give better (ie. lower) emission performance  Evaluate potential emissions reductions through retro-fit of different controllers and positioners.

5 Venting Controller Project – Initial Results  Site survey controller emission rates.  11 AGI sites surveyed and vent emission rates measured using high flow sampling system – “Snap shot” measurements taken on an “as found” basis  Emission rates measured for Bristol Babcock, Fisher, Neles, Taylor, Mokveld, ABB, Watson & Smith and Becker (pneumatic valve controllers and positioners)  3 sites selected for longer term testing.  Laboratory-based testing on different controllers and positioners.  Linear relationship of emission rate with controller or positioner pressure observed (for Fisher positioner and Bristol Babcock controller).  Longer-term emission rate measurement method development  Selection of suitable flow meter – microturbine flow meter option selected to match the pressure and flow characteristics of the vent emission  Method optimised in the laboratory and high flow sampling approach tested alongside this method – good correlation  Method tested at two sites (short-term test)  Longer-term emission test campaign  Planning underway; Ancillary equipment sourced; Operational issues addressed.

Impact of supply pressure (Bristol Babcock controllers)  Operating manual proposes a controller pressure of 20psi  Site observations suggest controller pressure may be higher  Up to 70psi possible  Between 20 – 40psi observed on the snap-shot surveys.  Linear relationship of emission rate with controller pressure  Confirmed manufacturer quoted discharge rate of 0.05cfm at 20psi  Emission rate up to around 0.09cfm at 40psi  [0.05cfm ≈ m 3 /h (≈ 0.5 t/a per controller)] 6

Impact of supply pressure (Fisher Positioners)  Operating manual proposes a positioner pressure of 100psi  Site observations suggest positioner pressure may be between 40 – 150psi  Linear relationship of emission rate with controller pressure (limited range of lab tests)  Extrapolation of lab tests Confirms manufacturer quoted discharge rate of 0.3cfm  If average positioner pressure is 100psi then vent emission rate will be around 0.5 m 3 /h (≈ 3 t/a per positioner)] 7

8 Next steps  Install Becker controller in laboratory and determine typical vent emission rates (Target date: February 2013)  Obtain a new Fisher positioner and extend the laboratory study on pressure variation of vent emission rate (Target date: March 2013)  Undertake the first long-term test campaign at three selected sites (Target date: March 2013)  Study the emission rate variation as a function of site operational parameters (overall site flow, gas temperature and pressure) (Target date: April 2013)  Fine tune the long-term test study, based on the first campaign to optimise data gathering for the second (and possible third) campaign (Target date: April-May 2013)