1 Presentation 12: SILL LAYOUT. 2 On Center (OC) Concepts Framing members are carefully spaced. This allows 4x8 panels to have support at each end of.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Module Floor Systems.
Unit 43 Wall Framing Wood-framed Wall Components • Constructing Wood-framed Walls • Sheathing Exterior Walls • Weather Barriers • Rainscreen Walls • Structural.
Grimsby Secondary School
Roof Framing A Quick Primer
HIP ROOFS Created BY Michael Martin July 2004 / revised may 2007 / reviewed & updated March 2010.
HIP ROOFS Created BY Michael Martin July 2004 / revised may 2007.
Unit 49 Intersecting Roofs
Basic Roof Types and Roof Theory
Residential Framing Prints Unit 14.
Architectural Drawing
ROOF.
BCT 122 Roof Framing 1 Roof Framing Procedure Sequence.
Building 4x8 Shed Student Name 10 th grade Jordan Vocational High School Teacher Mr. Michael McCraine.
HIP JACK THEORY AND LAYOUT
Presentation 26: HIP RAFTER LAYOUT.
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Copyright © Glencoe/McGraw-Hill Carpentry & Building Construction Laying Out Floor Joists.
Chapter 19 Floors.
Reading a Tape Measure by: Joey Silva. Imperial Units System Imperial units or the __ __ is a system of units, first defined in the British Weights and.
Copyright 2006 The National Association of Certified Home Inspectors
Plane Shapes Plane Shapes Two-Dimensional Shapes.
2-D Shapes What is a 2D Shape and how do we define it?
Architectural Dimensioning Part 2
Constructing Homes and Other Buildings
Two - Dimensional Shapes
Grimsby Secondary School TCJ3C
Balloon Frame North-American invention, 1833
Floor Framing Unit 29.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Foundation Plan Layout
Ceiling Framing Unit 32.
Sill and Floor Construction
UNIT PROJECT #3 INTRODUCTION Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Platform Construction Construction Mr. O. Platform Construction For use in construction jobs where a house is built over a basement or crawl space. For.
Wall Framing Grimsby Secondary School Technology Dept.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Wood Construction CTC-375.
On A Side Note: Cartoon Drawings Find a cartoon from a newspaper, magazine, or computer. Cut around the edges of your cartoon so the edges are straight.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
A:B: Sill PlatesGirders #1 Heavy beams that support the inner ends of the floor joists are called? C:D: Subflooringbridging.
1 Presentation 15: WALL COMPONENT IDENTIFICATION.
WALL COMPONENT IDENTIFICATION
House Construction.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
CONSTRUCTION OF AGRICULTURAL STRUCTURES Mrs. Bagley.
Drafting 2 (Arch) Quiz Review #5
Floor Framing.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
4. Local strength calculation
Area of Squares, Rectangles, & Parallelograms. What is Area? Area is the space a shape covers, or takes up Area is the number of square units equal in.
ROOFING BCGCA3007B. Types of Roofs Problem No1 Calculate Underside of Beams Birdsmouth 30mm Rafter 140 x 45.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
12 Chapter Roof Framing. 12 Chapter Roof Framing.
Drafting 2 – Honors Architecture Ardrey Kell High School
Architecture Mr. Graves
Project Design & Construction
Wood Frame Construction
Popsicle House.
Scale: 1 : 0.04 Wood: Green oak Rendered Exterior plywood.
1 1/8” 1 1/8” 1 1/8” 3/8 boarder 1 1/8” 1 1/8” 1 1/8”
Reading a Tape Measure.
Wall and Ceiling Construction
Information related to Chapter 7 in the textbook
Five Themes Foldable Instructions
VALLEY JACK THEORY AND LAYOUT
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

1 Presentation 12: SILL LAYOUT

2 On Center (OC) Concepts Framing members are carefully spaced. This allows 4x8 panels to have support at each end of each sheet. Each end is supported 4x8 Panel Support Members

3 OC Concepts Typical support member spacing is 16″. 16″ 8′0″8′0″

4 OC Concepts That is 16″ from center to center. OR from left edge to left edge. OR from right edge to right edge. 16″ Left to left Right to right Center to center They are the same

5 Variations in OC Other OC spacing includes 12″, 16″, 19.2″, 24″, and 32″. 8′0″8′0″ 12″ 12″ OC has EIGHT spaces in 8′

6 Variations in OC Other OC spacing includes 12″, 16″, 19.2″, 24″, and 32″. 8′0″8′0″ 16″ 16″ OC has SIX spaces in 8′. Remove twoRedistribute evenly

7 Variations in OC Other OC spacing includes 12″, 16″, 19.2″, 24″, and 32″. 8′0″8′0″ 19.2″ 19.2″ OC has FIVE spaces in 8′. Remove oneRedistribute evenly

8 Variations in OC Other OC spacing includes 12″, 16″, 19.2″, 24″, and 32″. 8′0″8′0″ 24″ 24″ OC has FOUR spaces in 8′. Remove oneRedistribute evenly

9 Variations in OC Other OC spacing includes 12″, 16″, 19.2″, 24″, and 32″. 8′0″8′0″ 32″ OC has THREE spaces in 8′. 32″

10 15 ¼″ First OC Member First OC member must be moved to align with the edge of the 4x8 panel 16″ Move first OC member Movement is ½ the member thickness This is typically ¾″. 16″ Edge of the Building

11 OC Layout Floor joist layout is often done on the sill.

12 OC Layout 16″ Typical OC is 16″. First measure OC from corner. Make a mark

13 OC Layout Measure back ½ the thickness of the joist. 16″ Typically ¾″

14 15 ¼″ OC Layout Square this line across. Place an X on the OC side of line. 16″

15 OC Layout The edge of the joist will be placed next to the line. 15 ¼″ OC Member

16 OC Layout 16″15 ¼″ Next OC layout mark is measured from the setback line.

17 OC Layout 16″ 15 ¼″ Remaining OC layout marks are measured from the setback line. 16″

18 Layout Across Building Layout lines across the building are from the same line. Sill Girder Sill Foundation 15 ¼″

19 Layout Across Building X’s are placed on the same side of the line if the joists run full length. Sill Girder Sill Foundation 15 ¼″ Joist

20 Layout Across Building Layout is opposite if joists only span to the girder. Sill Girder Sill Foundation 15 ¼″

21 Layout Across Building Second set of X’s should be changed so as to reduce confusion during assembly. Sill Girder Sill Foundation 15 ¼″

22 Conclusions OC members are spaced to support the panel edges. Measuring edge-to-edge is the same as center-to-center. First OC member must be moved ½ the joist thickness. Usually ¾″. Layout across a building is from the same setback line.