The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
Ofelia Capatina on behalf of the CERN specification team
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The review held at CERN, 10 – 11 Nov. 2015
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
R. Bonomi - SLHiPP2, Catania 3-4/5/20121 SPL Thermal Studies R. Bonomi Superconducting linacs for high power proton beams - Catania, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Cryogenics and cryolines – Crab Cavities for HiLumi LHC Crab Cavity review November 2015 CERN – Geneva, Switzerland K. Brodzinski, L. Delprat and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
Cryogenics storage and distribution
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
Plans towards CC in the LHC a US – centric perspective
at STFC Daresbury laboratory
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
International Review of the Crab Cavity Performance for HL-LHC Close-out Executive Summary HL-LHC CC Review Panel Mark Champion (ORNL), Mike Kelly (ANL),
Hollow e- lens, Cryogenic aspects
CERN Cryomodule Requirements for Crab Cavities
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
Design of a SHORT Cryomodule for the Superconducting Proton Linac of CERN IPNOrsay – CNRS Sébastien ROUSSELOT Patxi DUTHIL Patricia DUCHESNE Philippe DAMBRE.
IHEP Cryomodule Status
Cryomodules Challenges for PERLE
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Introduction to specifications refresher Ofelia Capatina on behalf of the CERN specification team LHC-CC13, 6th Crab Cavity Workshop OC, 10/December/2013 1

Functional specification OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop2

General OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop3 LHC Point 1 (vertical crabbing) 4 cavities / IP side/ beam to be installed during LS3 LHC Point 5 (horizontal crabbing) 4 cavities / IP side/ beam to be installed during LS3 SPS BA4 (vertical or horizontal crabbing) One or two cryomodules with 2 identical cavities to be tested before LS2 SM18 area Cold tests and clean room facilities – cold test of cryomodules prior tunnel installation

LHC environment General OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop4 Paolo Fessia 4 cavities / IP side / beam between D2 and Q4 => Total 32 cavities in LHC

LHC environment General OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop5

SPS environment General OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop6 Alick Macpherson talk

SPS environment General OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop7

Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop8 LHC configurationSPS configuration

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop9 Shrikant Pattalwar talk

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop10 Shrikant Pattalwar talk

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop11 Thomas Nicol talk

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop12 Thomas Nicol talk

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop13 Luis Alberty talk

SPS : 2 (identical) cavities in a cryomodule 3 different cryomodules Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop14 Luis Alberty talk

Design principle, dimensions and interfaces (RF, cryo) to be standardized as much as possible Metric system ! Cryomodule OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop15

SPS: Two circuits: 2 K and 80 K Operated at 2 K saturated helium bath -> ~30 mbar Strong requirement to reduce static heat losses at 2K Screening at 80 K provided with LN2 Main interface from the top Cryogenics OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop16 helium tank crab cavity common pumping collector thermal screen at ~80 K cryostat interface CWT Power coupler intercept CWT Krzysztof Brodzinski and Federico Carra talks

LHC - Alignment requirements (position accuracy and position stability) – based on general beam dynamics considerations: Transverse rotation per cavity should be less than 5 mrad Transverse misalignment per cavity (in both planes) should be less than 0.7 mm Cavity tilt with respect to the longitudinal axis should be less than 1 mrad Cavity longitudinal misalignment should be less than 10 mm Alignment OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop17

SPS Alignment required for operation less than LHC To limit SPS crymodule complexity (win time and limit risk) No active alignment needed for SPS tests Foresee a system for monitoring the cavity positions instead Alignment OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop18

Integration into cryostat at CERN - most likely location SM18 Cold tests of full cryomodules in SM18 prior tunnel installation Cryostating OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop19 Vittorio Parma talk Mathieu Therasse talk

Fundamental Power Couplers Talk by Eric Montesinos today Impedance budget and HOM power & couplers Talk by Benoit Salvant today OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop20 Couplers

Bare cavities for SPS designed to be the same as for the LHC Dressed cavity for SPS tests design as much as possible compatible with LHC Conceptual design of SPS cryomodule for the 3 cavities 2 identical cavities in 3 different cryomodule Effort to standardize interfaces, basic choices in- between the 3 cryomodules The 3 SPS cryomodules could be tested in SM18 (if no down-selection since then) 1 or 2 cryomodules to be tested in SPS, after test in SM18 SPS cryomodule design as much as possible compatible with the LHC OC, 10/December/2013 LHC-CC13, 6th Crab Cavity Workshop21 Summary